0% found this document useful (0 votes)
69 views1 page

Commissioning Service Department Commissioning Standard Test Formats Description: End To End Test - Differential

This document is an end-to-end test form for a differential relay. It contains sections for relay data, preliminary checks of settings and alarms, and an electrical test table to record the response of circuit breakers and alarms at both the local and remote ends when signals are initiated through the relay. The test verifies the proper operation and response of the differential protection scheme.

Uploaded by

AshrafReyad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

Commissioning Service Department Commissioning Standard Test Formats Description: End To End Test - Differential

This document is an end-to-end test form for a differential relay. It contains sections for relay data, preliminary checks of settings and alarms, and an electrical test table to record the response of circuit breakers and alarms at both the local and remote ends when signals are initiated through the relay. The test verifies the proper operation and response of the differential protection scheme.

Uploaded by

AshrafReyad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Commissioning Service Department

Commissioning Standard Test Formats


Description: END TO END TEST – DIFFERENTIAL Record No.:
Bay no.: Drawing ref.: Sheet: 1 of 1
Contractor: Contract no.: Substation No :

1. Relay Data

Item Items Details


1 Rated Current
2 Rated Auxiliary Voltage
3 Model No.
4 Serial No Local
5 Serial No. Remote
6 Local End
7 Remote End

2. Preliminary Checks

Item Items Details


1 Check the setting are applied at Relay
2 Check the alarms are reset at Relay
3 Check fiber optical cable connection

3. Electrical Test:

Local End Remote End


NSD CB Alarm at Indication CB Alarm at Indication
Signal channel Operation Control at Relay Operation Control at Relay
Initiated initiated Trip A/R Panel Panel Trip A/R Panel Panel

Tested by: ENG. Witnessed by: ENG.