Wireless Infrastructure R4G-70-CQM-QAP-PR-001
Quality Management Plan
24. Material Discrepancy Report Format:
Material Discrepancy
Report
State/Circle: City/Area: MDR No.:
Originator/Field Engineer: W.O. No.: Date:
Material
Duct OFC Mast Others (Please Specify)
Category
Description Of Material Discrepancy (By Originator):
Signature:
Field Engineer
Corrective Action Recommended By Area Manager / Materials Control Group for
Replacement of Material / substitution
Signature: Signature: Date:
Area Manager Quality Engineer
Rework Quantity In Case Recommendation Results In Rework
Effect in Cost :- Effect in Time
Field Engineer: Area Manager: Circle Head:
Action Taken To Prevent Recurrence (By Warehouse)
Signature:______________Date:_________
Warehouse In-Charge
Closed By:
Name Sign Date
Warehouse In-Charge
Area Manager For Record
Quality Team For Rework Data Compilation
C.C.
Format No.: R4G-70-CQA-FMT-PR-003-00
Reliance Jio Infocomm Limited Rev. 01 Issue date : 1-July-13 Page 23 of 28