0% found this document useful (0 votes)
49 views2 pages

FIT Change of Ownership Form

This document is a change of ownership form for a Feed-in Tariff (FIT) installation. It collects information about: 1. The previous owner's contact details and installation address. 2. FIT identification details including technology, meter serial number, and meter reading on date of ownership change. 3. Contact details for the new owner of the installation. 4. A declaration relinquishing eligibility for FIT payments signed by the previous owner.

Uploaded by

google man
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views2 pages

FIT Change of Ownership Form

This document is a change of ownership form for a Feed-in Tariff (FIT) installation. It collects information about: 1. The previous owner's contact details and installation address. 2. FIT identification details including technology, meter serial number, and meter reading on date of ownership change. 3. Contact details for the new owner of the installation. 4. A declaration relinquishing eligibility for FIT payments signed by the previous owner.

Uploaded by

google man
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Feed-in Tariff (FIT)

Change of Ownership Form

To notify us of a change of ownership of your installation, please completed the details below and return this
form to: The Green Hub, EDF Energy, Gadeon House, Grenadier Road, Exeter, EX1 3UT

Section 1 – Your details and installation address

Full Name:

Site Address:

Post Code:

Section 2 – Feed-in Tariff information

FIT ID: -

Technology:

Meter Serial Number:

Move date information

Meter Reading:

Date: D D M M Y Y Y Y
Declaration

Please read this declaration and tick to accept before you submit

1. The meter reading I have provided is true and accurate


2. The date of meter reading stated is the day the meter reading was taken
3. The VAT status of the generator has not changed
4. No extensions or reductions have taken place without notifying EDF Energy
5. The details previously provided by the generator are still complete and accurate
and have not change for which EDF Energy has used to update the Central FIT Register
6. The installation is in good working order

Accept
Feed-in Tariff (FIT)
Change of Ownership Form

Section 3 – Forwarding information

Please provide your new address below. This will only be used should we need to contact you concerning
your previous Feed-in Tariff agreement and will not be used for marketing purposes.

Address:

Post Code:

Section 4 – New owner

Please provide the name of the new owner of the installation. We will subsequently contact this individual
by post.

Full Name:

Telephone No:

Email Address:

Section 5 – Declaration

Please complete and sign the following declaration

I hereby cease to be the owner of the installation documented within section 1 of this form and that
ownership of the installation has passed to the party named in section 4 of this form. Through submission of
this form, I also relinquish eligibility for payment through the Feed-in Tariff scheme based on the installation
detailed in section 1.

Signed ______________________________________ Date _________________________

Print Name __________________________________

You might also like