Material Properties:: Main Builtup Girder Flexural Check
Material Properties:: Main Builtup Girder Flexural Check
Material Properties:
Used SS400 steel plate
Fy = 245 MPa
Fu = 400 MPa
E = 200000 MPa
Section:
A square built-up section is used.
Outside depth, d = 600 mm
Outside flage width, bf = 450 mm
Flange thickness, tf = 20 mm
Web thickness, tw = 15 mm
Ixx = 2.22E+09 mm4
Sx = 7414044 mm3
Length of beam, L = 8900 mm 600 mm
Area, A = 49600 mm2
Results:
From analysis,
Considered as simple supported beam.
Maximum required flexural strength, Mu = 1390.625 ≈ 1400 kN-m
Maximum required shear strength, Vu = 156 ≈ 160 kN
Flange:
�=𝒃/�
= 450/15.0 = 30
Web:
�=𝒉/� = 600/20 = 30
Flexural Design:
Shear Capacity:
Shear strength of built up section is based on web yeilding or web shear buckling depends on
the web width-to-thickness ration h/tw
1) h/tw < 1.10 √(kv.E / Fy), then the stregnth is based on shear yeilding, and
ϕ Vn = ϕ 0.6 Fy Aw Cv
h/tw = 560/15 = 37
1.10 √(kv.E / Fy) = 1.10 √(5 x 200,000/245)
= 70
Welding Design
Deflection:
Maximum deflection, δ = 12 mm
δ
ACI limit, ACI = L/360
δACI = 25 mm > 12 mm [OK]
450 mm
50 mm
Total jacking fo
Total jacking fo
20 mm
Provide 1-PT bar and to
Total jacking fo
d = 290 mm
I = 2.22E+09
V = 175 kN
q = 0.078 kN/mm
[OK]
king Force Calculation for Concourse and Platform (1st Cantilever) :
Assume draw in = 1 mm
PT Dia = 32 mm
Area of PT Bar = 804.248 mm2
Length of PT bar = 2.880 m
E = 200000 MPa
Loss Force = 56 kN
50% of UTS of PT bar = 435 kN
Total jacking force after draw in = 379 kN
Required jacking force = 560 kN
Provide 2-PT bar and total jacking force = 758 kN > 560 kN [OK]
Using Jacking Force = 430 kN
king Force Calculation for Platform segment (Segment 1L, 2L and 3L):
Assume draw in = 1 mm
PT Dia = 32 mm
Area of PT Bar = 804.248 mm2
Length of PT bar = 2.880 m
E = 200000 MPa
Loss Force = 56 kN
50% of UTS of PT bar = 300 kN
Total jacking force after draw in = 244 kN
Required jacking force = 200 kN
Provide 1-PT bar and total jacking force = 244 kN > 200 kN [OK]
Using Jacking Force = 300 kN
Main BuiltUp Girder Flexural Check
Material Properties:
Used SS400 steel plate
Fy = 245 MPa
Fu = 400 MPa
E = 200000 MPa
Section:
A square built-up section is used.
Outside depth, d = 200 mm
Outside flage width, bf = 200 mm 15 mm
Flange thickness, tf = 20 mm
Web thickness, tw = 15 mm
Ixx = 7.53E+07 mm4 200 mm
Iyy = 5.56E+07 mm4
Sx = 753067 mm3
Length of beam, L = 1750 mm
Area, Ag = 12800 mm2
rx = 76.7 mm
ry = 65.9 mm
Results:
From analysis,
Axial Load, Pu = 100 kN
Flange:
�=𝒃/�_
𝒇 = 200/20.0 = 10
Web: �=𝒉/�
= 200/20 = 10
Welding Design
Deflection:
15 mm
Jacking Force Calculation for Platform segment (Segment 1L, 2L and 3L):
Assume draw in = 1 mm
PT Dia = 32 mm
Area of PT Bar = 804.248 mm2
Length of PT bar = 2.880 m
E = 200000 MPa
Loss Force = 56 kN
50% of UTS of PT bar = 300 kN
Total jacking force after draw in = 244 kN
Required jacking force = 200 kN
Provide 1-PT bar and total jacking force = 244 kN > 200 kN [OK]
Using Jacking Force = 300 kN
Main BuiltUp Girder
Material Properties:
Used SS400 steel plate
Fy = 240 MPa
Fu = 400 MPa
E = 200000 MPa
Section:
A square built-up section is used.
Outside depth, d = 600 mm
Outside flage width, bf = 450 mm
Flange thickness, tf = 20 mm
Web thickness, tw = 20 mm
Ixx = 4.13E+09 mm4
Sx = 13753800 mm3
Length of beam, L = 8900 mm
Results:
From analysis,
Considered as simple supported beam.
Maximum required flexural strength, Mu = 2781.25 ≈ 2790 kN-m
Maximum required shear strength, Vu = 313 ≈ 320 kN
Flange: �=𝒃/�
= 450/20.0 = 22.5
Web:
�=𝒉/� = 600/20 = 30
Flexural Design:
Shear Capacity:
Shear strength of built up section is based on web yeilding or web shear buckling depends on
the web width-to-thickness ration h/tw
1) h/tw < 1.10 √(kv.E / Fy), then the stregnth is based on shear yeilding, and
ϕ Vn = ϕ 0.6 Fy Aw Cv
h/tw = 560/20 = 28
1.10 √(kv.E / Fy) = 1.10 √(5 x 200,000/240)
= 71
Welding Design
Punching Shear
Jacking Force Calculation
Total jacking fo
Total jacking fo
Total jacking fo
d = 310 mm
I = 4.36E+09
V = 320 kN
q = 0.096 kN/mm
450 mm
30 mm
30 mm
50 mm
310 mm
650 mm
30 mm
king Force Calculation for Concourse and Platform (1st Cantilever) :
Assume draw in = 1 mm
PT Dia = 32 mm
Area of PT Bar = 804.248 mm2
Length of PT bar = 2.880 m
E = 200000 MPa
Loss Force = 56 kN
50% of UTS of PT bar = 435 kN
Total jacking force after draw in = 379 kN
Required jacking force = 560 kN
Provide 2-PT bar and total jacking force = 758 kN > 560 kN [OK]
Using Jacking Force = 430 kN
king Force Calculation for Platform segment (Segment 1L, 2L and 3L):
Assume draw in = 1 mm
PT Dia = 32 mm
Area of PT Bar = 804.248 mm2
Length of PT bar = 2.880 m
E = 200000 MPa
Loss Force = 56 kN
50% of UTS of PT bar = 300 kN
Total jacking force after draw in = 244 kN
Required jacking force = 200 kN
Provide 1-PT bar and total jacking force = 244 kN > 200 kN [OK]
Using Jacking Force = 300 kN