Annexure To FORMAT - I

This document provides a format for reporting on the completion of non-process and process systems for a project. It includes sections to identify the system, provide any exceptions, and requires sign-offs from the contractor, Technip, and JBF to verify completion. Annexures A and B list specific checks and reports required for process and non-process systems.

Uploaded by

raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
424 views3 pages

Annexure To FORMAT - I

This document provides a format for reporting on the completion of non-process and process systems for a project. It includes sections to identify the system, provide any exceptions, and requires sign-offs from the contractor, Technip, and JBF to verify completion. Annexures A and B list specific checks and reports required for process and non-process systems.

Uploaded by

raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT : PTA

CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: DATE:

FORMAT-I

INTIMATION REGARDING NON-PROCESS / PROCESS SYSTEM COMPLETION

Following Non-process system / Process system has been mechanically completed in all
respects with exceptions noted below. The Non-process system / Process system can be
taken up for checking and preparation of checklist.

Non-Process / Process System No :

Description Drawing no.

Exceptions:
1

NOTE: REFER ANNEXURE -A OR B TO FORMAT -I

Performed by: Checked by: Approved by:

Signature:

Name:

Date:

CONTRACTOR TECHNIP JBF


QUALITY CONTROL FORM :TPIL/JBF/SITE-04A
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED
PROJECT NO :830
UNIT NO: OSBL
REPORT NO: DATE:

ANNEXURE-A TO FORMAT-I (PROCESS SYSTEM)


SIGNATURE
APPLICABLE /
SL NO. DESCRIPTION NOT
APPLICABLE
Format No No Of sheets
CONTRACTOR TP JBF
REMARKS

1 Mark up P&ID
2 MC Filled Format
Pressure test / Pneumatic test
3 report
4 Punch List
5 Flage joint history sheet

Equipment allignment report

6a. Static
6
6b. Rotary - Without Piping

With Piping

7 Final Box up report

List of Instrument

8 8a. Instrument Installation report

8b.Instrument Calibration Report

8c. Instrument Cold loop Checking

8d. Instrument Hot loop Checking

List of Electrical items

9a. Electrical items Installation


9 report

9b. Motor / other No load run


Report

10 Insulation Report
PLEASE FILL ALL THE BLANK AREAS

Performed by: Checked by: Approved by:


SIGNATURE:
NAME:
DATE:
CONTRACTOR TECHNIP JBF
QUALITY CONTROL FORM :TPIL/JBF/SITE-04B
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED
PROJECT NO :830
UNIT NO: OSBL
REPORT NO: DATE:

ANNEXURE-B TO FORMAT-I (NON-PROCESS SYSTEM)


SIGNATURE
APPLICABLE /
SL NO. DESCRIPTION NOT Format No Of REMARKS
APPLICABLE No sheets CONTRACTOR TP JBF

1 Civil
POUR CARD ALONG WITH
a SUMMARY SHEET

b CHECK LIST FOR BULIDING

c Water Fill Test Report

d EPOXY SCREEDING REPORT

Electrical
2 (Final Comssioning
Report)
a Lighting

b Cabling
c Earting

d PA System

e FA System

f Telephone System

Instrument
3 ( Final Comssioning
Reprt)
a Cabling

b Gas Detection System

c Sprinkler System

d Fire Alarm System

4 Punch List

5 As Built Drawing

PLEASE FILL ALL THE BLANK AREAS

Performed by: Checked by: Approved by:

SIGNATURE:

NAME:

DATE:

CONTRACTOR TECHNIP
JBF