0% found this document useful (0 votes)
132 views1 page

Material Crushing Unit: 10.00M Wide Road

The document provides an area statement for a manufacturing facility with 11 sections. It lists the purpose, dimensions, and area of each section including: a raw material yard, material crushing unit, de-corting system, vertex furnace, rotating cooling system, tilting rotary furnace, holding furnace, ladders and iron casting, material loading area, fuel storage yard, and transformer substation. The total area covered is estimated at 5,988.99 square meters.

Uploaded by

Yanamala Kishore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views1 page

Material Crushing Unit: 10.00M Wide Road

The document provides an area statement for a manufacturing facility with 11 sections. It lists the purpose, dimensions, and area of each section including: a raw material yard, material crushing unit, de-corting system, vertex furnace, rotating cooling system, tilting rotary furnace, holding furnace, ladders and iron casting, material loading area, fuel storage yard, and transformer substation. The total area covered is estimated at 5,988.99 square meters.

Uploaded by

Yanamala Kishore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

180.

00 AREA STATEMENT :
S.no DESCRIPTION AREA
1 RAW MATERIAL YARD (79.70M X40.00M) 3188 Sq.m
18
MATERIAL CRUSHING UNIT

20 2 MATERIAL CRUSHING UNIT (10M X 40M) 400 Sq.m


21
19 UG SUMP- 500KL
CAPACITY 3 DE CORTING SYSTEM (20M X 40M) 800 Sq.m
1 PROVISION PROVISION VEHICLE PARKING YARD
12M X 16.67M
4 VERTEX FURNANCE (30.00M X 20M) 600 Sq.m
FOR ETP FOR
FIRE STATION ROTATORY COOLING SYSTEM
RAW MATERIAL DUMP YARD 5 253.12 Sq.m
(11.25M X 22.50M)
0.80 Ac
WEIGH BRIDGE 17 6 TILTING ROTATORY FURNACE
2
& ROOM
24 SECURITY 300 Sq.m
12M X 5M 5.00M X 5.00M
(15M X 10M) -2NO.S
7 HOLDING FURNACE- 3 (22.50M X15.00M) 1012 Sq.m
10.00M WIDE ROAD GATE-1
8 LADDELS & IRON CASTING 167 Sq.m
22 9 MATERIAL LOADING AREA 636 Sq.m

50KL SEPTIC
14 15 16 10 FUEL STORAGE YARD
414.87 Sq.m

TANK
CANTEEN L&G
(34.57M X 12.00M)
ADMINISTRATION TOILETS
17.30M X 11.40M 12.20M X 11.40M 5M X11M 11 TRANSFORMER & SUB STATION 414.87 Sq.m
(34.57M X 12.00M)
IGNOT CASTING
12 FINISHED MATERIAL SHEDS
112.39

3 HOLDING FURNACE
25 (34.57M X 20M) -2NO.S 1382Sq.m
DE -CORTING ROTATORY 7 PROVISION FOR STAFF QUATERS
13 692 Sq.m
SYSTEM COOLING FINISHED MATERIAL GO DOWN-2 FUTURE EXPANSION (34.57M X 20.00M)
SYSTEM
LADDELS
14 ADMIN BLOCK (17.30M X 11.40M) 197.22 Sq.m
5
15 CANTEEN (12.20M X 11.40M) 139.08 Sq.m

10.00M WIDE ROAD


MATERIAL LOADING AREA
12 16 L & G TOILET (5.00M X 11.40M) & S-TANK 75 Sq.m
HOLDING FURNACE 17 SECURITY ROOM (5.00M X 5.00M) 25 Sq.m
7 LADDELS
13 18 500KL MULTIPURPOSE UG TANK 200 Sq.m
FINISHED MATERIAL GO DOWN-1 (12.00M X 16.67M)
PROVISION FOR STAFF QUATERS
34.57M X 20.00M 19 VEHICLE PARKING AREA 1316 Sq.m
8
TILTING ROTATORY 20 PROVISION FOR FIRE STATION 260.74 Sq.m
4 FURNACE
6
LADDELS
9 21 PROVISION FOR ETP 260.74 Sq.m
VERTEX FURNANCE
HOLDING FURNACE 22 10.00M WIDE INTERNAL ROAD 1536 Sq.m
TRANS FORMER
TILTING ROTATORY
FURNACE 7
IGNOT CASTING
10 FUEL STORAGE YARD
34.57M X 12.00M
11 & 23 6.00M WIDE INTERNAL ROAD 1080 Sq.m
LADDELS
SUB STATION
34.57M X 12.00M 24 WEIGH BRIDGE & ROOM 85 Sq.m
6.00M WIDE ROAD GATE-2
25 GRENERY - 23.70% 4795 Sq.m
23 6.00M WIDE ROAD TOTAL -5.00Ac 20230 Sq.m

You might also like