Anaerobic Sludge Stabilization Design

The document describes the design of a sludge stabilization unit and sludge drying beds for a water treatment system. The sludge stabilization unit uses anaerobic digestion with a 5.5 meter vertical side depth and 11 day digestion period. The sludge drying bed design calculates that with 2500 kg of sludge applied per day, providing 75 beds of 11m x 7m size (5775m2 total area) will be sufficient based on a 0.3m sludge layer over 35 cycles per year.

Uploaded by

J. AKANSHA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views2 pages

Anaerobic Sludge Stabilization Design

The document describes the design of a sludge stabilization unit and sludge drying beds for a water treatment system. The sludge stabilization unit uses anaerobic digestion with a 5.5 meter vertical side depth and 11 day digestion period. The sludge drying bed design calculates that with 2500 kg of sludge applied per day, providing 75 beds of 11m x 7m size (5775m2 total area) will be sufficient based on a 0.3m sludge layer over 35 cycles per year.

Uploaded by

J. AKANSHA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DESIGN OF WATER AND WASTE WATER TREATMENT SYSTEMS

Name: - Anil Singh


Registration Number: - 18MEE0025
Course code: -CLE5005
SLUDGE STABILIZATION UNIT
 Provide anaerobic sludge stabilization of organic solids
 High rate anaerobic digesters (Temp . 35º C)
 Provide a 1m depth for grit accumulation in the bottom
 Provide a 0.6m depth for the scum blanket
 Provide a 0.6m minimum clearance between the floating cover and
maximum digester level.
 Total inactive cone depth =1m
 Total inactive upper depth of digester =0.6m +0.6m =1.2m

 Provide the active side water depth of 5m


 Provide the diameter of digester = 2m
 Provide the vertical side depth = 5.5m
 Provide the digestion period of 11 days

DESIGN OF SLUDGE DRYING BEDS


Sludge applied to drying beds at 100 kg/MLD
Sludge applied = 2500 kg/day
Specific gravity =1.015
Solid content = 1.5%
2500
Volume of sludge = [ ] × [1 ÷ (1000 × 1.015)] = 164.2 M3/day
1.5

Considering monsoon etc. , the total number of cycle in one year = 35


Period of each cycle = 365 ÷ 35 = 10.5 𝑑𝑎𝑦𝑠
Volume of sludge /cycle = 164.2 × 10.5 = 1724.1 𝑚3
Spreading a layer of 0.3m/cycle area of beds required = 1724.1 ÷ 0.3 = 5747 𝑚2
Provide 75 beds of 11m x 7m
Thus providing 5775m2 area
provide a wet well of size 1.5m x 2m with a liquid depth of 1m.