Existing Bridge: Framing Plan
Existing Bridge: Framing Plan
27000 27000
S3 16mmØ @ 300 BOTTOM BARS
CL. OF ABUTMENT CL. OF PIER CL. OF PIER
S2 16mmØ @ 300 TRUSS BARS
S1 16mmØ @ 300 TOP BARS
M A T C H
EXISTING BRIDGE
L I N E
A
B A
A FRAMING PLAN
G2 G9 SCALE: 1: 80 Mts. S14
G1 G5 S7
S5 G4 S6
S6 G3 S5
S7 G1 G1
S14 G2 G2
A 1 2
M A T C H
L I N E
B LONGITUDINAL SECTION
SCALE: 1: 80 Mts.
CL ROADWAY
1110 2920 35 4366 4366 35 2920 1110
900
900
1.0% SLOPE 1.0% SLOPE
SEE DETAILS SEE DETAILS
281
281
199
3750
5750
9250
11750 G9
G5
G4
463 1350 1350 766 766 2400 2400 2400 766 1350 1350 463
D REINFORCEMENT OVER PIER G1
G3
SCALE: 1:100Mts.
G2
C TYPICAL CROSS SECTION
SCALE: 1:5 0Mts.
DESIGNED BY:
PROJECT & LOCATION : SHEET CONTENTS : CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVAL : APPROVED : SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS EUGENIO Q. ARQUERO IV
WIDENING OF PERMANENT BRIDGES FLOOR FRAMING PLAN
REGIONAL OFFICE I LONGITUDINAL SECTION
ENGINEER II DEXTER L. CAVANEYRO
RAMOS BRIDGE (B0277LZ) 9
Planning and Design Division PREPARED BY: CHIEF, BRIDGES AND OTHER PUBLIC WORKS DESIGN BALTAZAR F. LAVARIAS EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO IV
ALONG JUDGE JOSE DE VENECIA SR. AVENUE TYPICAL CROSS SECTION SECTION CHIEF PLANNING & DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR OIC - REGIONAL DIRECTOR
Bridges and Other Public Works Design Section REINFORCEMENTS OVER PIER
San Fernando City, La Union CALASIAO, PANGASINAN
ABUTMENT A TO PIER 2 JOHN MICHAEL L. HIDALGO
ENGINEER I
DATE : DATE : DATE : DATE :