The New German Standard DIN 1946-4 Ventilation in Hospitals Teskon

Shared

Uploaded by

cheeshing88
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 82

Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Current hospital guidelines in


Germany and in Switzerland
DIN 1946-4: Ventilation and air conditioning;
Ventilation in hospitals
SWKI 99-3: Heating, ventilation and air-conditioning
in hospitals

DIN 1946-4 Folie 2 / 81


73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

The new German


standard DIN 1946-4:
Ventilation in hospitals

Arnold Brunner, dipl. Ing. SIA

DIN 1946-4 Folie 3 / 81


73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-
1946-4: Ventilation in hospitals

History and Basics

DIN 1946-4 Folie 4 / 81


73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Juliusspital Wü
Würzburg 1805

Carl Caspar von Siebold (1769–1807)


During Siebolds aegis occurred the reconfiguration of the Theatrum
anatomicum (1788) and an extension of the capacity of the Juliusspital
(1799) in which 1805 the first modern operating room of the world was set
up.
DIN 1946-4 Folie 5 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-
1946-4 Ventilation in hospitals

DIN 1946-4 Folie 6 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Inspiration through Sir J. Charnley 1968

 Greenhouse ® room-in-room construction


 Anaesthesia separated
 Improved air filter
 Body exhaust system
 Self-instrumentation

DIN 1946-4 Folie 7 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Realization by Weber/Meierhans 1970

DIN 1946-4 Folie 8 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Swiss Guideline for construction, operation and


monitoring of ventilation systems in hospitals

 Swiss Guideline SKI Bulletin 4 published in 1975


 This guideline is based on the German standard
DIN 1946, Part 4 (Ventilation in hospitals) 1963
 Three hygiene-room classes
 Class I 10 CFU/m3
 Class II 200 CFU/m3
 Class III 500 CFU/m3

DIN 1946-4 Folie 9 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

RLT-
RLT-Richtlinie von 1975

DIN 1946-4 Folie 10 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Swiss Ventilation Guideline 1975

DIN 1946-4 Folie 11 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 12 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Lidwell-
Lidwell-Study 1982

DIN 1946-4 Folie 13 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Swiss Guideline for the design, construction,


operation and monitoring of ventilation
and airconditioning systems in hospitals
 Swiss-Guideline SKI-Band 35 (1987)
 Three hygiene room-classes
 Class I 10 CFU/m3
 Class II 200 CFU/m3 Class IIb 50 CFU/m3
 Class III 500 CFU/m3

DIN 1946-4 Folie 14 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Low turbulence
Swiss Ventilation Guideline 1987 displacement
air flow

Low turbulence
displacement
air flow with zone
segregation

Dilution air
flow, no zone
segregation

DIN 1946-4 Folie 15 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Development of the standard OP-


OP-Room:
"small" ULF with 2000 - 3000 m3/h

ULF: Unilateral flow (Laminar air flow)

DIN 1946-4 Folie 16 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

OP Cl.1: ULF with 8'000 - 10'000 m3/h

DIN 1946-4 Folie 17 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

1989: Überarbeitung der DIN 1946-


1946-4
Im Wesentlichen zwei Raumklassen (Luftreinheit):
 Raumklasse I (Operationsräume)
Hohe bzw. besonders hohe Anforderungen an
die Keimarmut
 Raumklasse II (übrige Räume im Krankenhaus)
Übliche Anforderungen an die Keimarmut

DIN 1946-4 Folie 18 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

1989: Revision of DIN 1946-


1946-4
Essentially two room classes (air cleanliness):
 Room class I (operating rooms)
High and highest requirements with respect to
low germ concentrations
 Room class II (remaining rooms in the hospital)
General requirements with respect to low germ
concentrations

DIN 1946-4 Folie 19 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

1990: Development DIN 4799

DIN 1946-4 Folie 20 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

1990: Development DIN 4799


Supply air 1‘600 m3/h

DIN 1946-4 Folie 21 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Revision of the Swiss hospital guideline


 Start January 22nd, 1997
 Target: End in 1998
 essential Hospital-organisations participate
 Hospital hygiene
 Technical and maintenance service
 Building services engineering
 1st draft with official consultation January 2001
 final draft December 2002 (2nd official consultation)

DIN 1946-4 Folie 22 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 23 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Inquiries (publications,
publications, companys)
companys)

Bild Admeco

DIN 1946-4 Folie 24 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Kostenvergleich: Ergebnisse (1)


TFH Berlin
Energiebedarfsunterschiede
Einfluß des Grundkonzeptes auf den Jahresenergiebedarf
30000
198 %

Wärme
Jahresenergiebedarf [kWh/a]

25000
Strom
20000
122 %
108 % 108 %
15000 100 %
88 %
78 %
10000

5000

0
CH 1 CH 2 DIN 1 DIN 2 DGKH 1 DGKH 2 DGKH-OPT

Merkmale CH 1 CH 2 DIN 1 DIN 2 DGKH 1 DGKH 2 DGKH-OPT Einheit


V AU (OP + EIN/AUS) 800 1200 2800 1600 1000 1000 1000 m³/h
V ZU (OP-LAF) 4000 4000 2400 2800 4000 8000 8000 m³/h
Überströmung mit mit ohne mit mit mit mit

DIN 1946-4 Folie 25 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Kostenvergleich: Ergebnisse (2)


TFH Berlin
Gesamtkostenunterschiede
Einfluß des Grundkonzeptes auf die Jahreskosten

50.000 147 %
Energiekosten
Jahreskosten [D M/a]

45.000
40.000
88 % 100 % 104 % 97 % 96 % Betriebskosten
35.000
30.000
83% Kapitalk. (20 a)
25.000
20.000 Strompreis:
15.000
10.000
0,20 DM/kW h
5.000 W ärmepreis:
0 0,08 DM /kW h
CH 1 CH 2 DIN 1 DIN 2 DGKH 1 DGKH 2 DGKH-OPT

Merkmale CH 1 CH 2 DIN 1 DIN 2 DGKH 1 DGKH 2 DGKH-OPT Einheit


V AU (OP + EIN/AUS) 800 1200 2800 1600 1000 1000 1000 m³/h
V ZU (OP-LAF) 4000 4000 2400 2800 4000 8000 8000 m³/h
Überströmung mit mit ohne mit mit mit mit

DIN 1946-4 Folie 26 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Comparison of costs,
costs, findings
 By decreasing the outdoor air flow to 1000 m³/h and by
increasing the circulating air flow to 3.000 m³/h (OR-supply
air flow: 4000 m³/h) energy costs are virtually unaltered.
 Electricity costs are even lower at a circulating air flow of 7000 m³/h
than in the case of DIN with an outdoor air flow of 2800 m³/h.
 Electricity costs only amount for approx. 5 – 8 % of the annual
costs for the air-conditioning of operating rooms.
 With optimisation of the ULF/circulating air concepts, annual costs
may even be further reduced compared to the DIN cases (see
DGKH-OPT-case).

DIN 1946-4 Folie 27 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 28 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Mai 2003

DIN 1946-4 Folie 29 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

The revision of the DIN 1946-


1946-4
 Revision of the guideline
DIN 1946-4 "Ventilation and air conditioning.
Part 4: Ventilation in hospitals" of 1999
was classified as unsatisfactory
 Alternatives are published

DIN 1946-4 Folie 30 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 31 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

RKI requirements for surgery


 Unidirectional airflow ventilation is essential for
aseptic interventions with high risk of infection.
 The size of the ceiling panel has to conform to
the type of surgical intervention.
As a rule, the operating table and the instrument
tables shall be protected.
 A room class I (DIN1946-4) shall be installed only
in the operating room.

DIN 1946-4 Folie 32 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Hygiene und Medizin 2002

DIN 1946-4 Folie 33 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Conventions of the German Society for


Hospital Hygiene (et all.)
 Protection range with a size of 2.8 x 2.8 m
required (containing OP and instrument tables)
 unidirectional airflow
 Total size: 3.2 x 3.2 m with aprons 5 - 50 cm
 Filter class H 14
 degree of primary turbulence < 5%
 corridors for sterile goods supply shall be
operated with positive pressure at all times

DIN 1946-4 Folie 34 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 35 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 36 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 37 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

The new ventilation standard


DIN 1946-
1946-4

Date of publication:
publication:
November 2008

DIN 1946-4 Folie 38 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Publication in November 2008


DIN 1946-4 Folie 39 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Table of contents

Foreword
1 Scope
2 Normative references
3 Terms, definitions, and abbreviations
4 General requirements
5 Classification of rooms used for medical pur-
poses (room classes) and ventilation concepts

DIN 1946-4 Folie 40 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Table of contents

6 Requirements for ventilation and


air-conditioning components
7 System qualification and Acceptance tests
8 Periodic tests
9 Requirements for the technical documentation

DIN 1946-4 Folie 41 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Table of contents
Annex A Project phases and objectives
Annex B Flow visualisation for room class 1a
Annex C Acceptance test by determining the
protective effect for room class 1a
Annex D Acceptance test following the procedure
for measuring the turbulence intensity
Annex E System test / Pre-qualification (class 1a)
Annex F Microbiological tests
DIN 1946-4 Folie 42 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Scope of DIN 1946-


1946-4
- hospitals buildings
- day hospitals
- physician’s practices with intervention rooms
- outpatient surgery centres / facilities / ambulatories
- dialysis centres
- facilities for internal and external (service) units for
the processing of medical devices / sterilization
areas

DIN 1946-4 Folie 43 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Guide for planning,


planning, construction and operation
1. Analysis To determine the current situation, establish the basics,
and declare the aims
2. Project aims Performance specifications, to conclude the phase of
establishing the objectives
3. Planning To implement the performance specifications in the
planning department, to conclude the planning phase
4. Implementation To apply the performance specifications, system
qualification, documentation, to conclude the
implementation phase
5. Operation Personnel training, to supplement and complete the
system documentation, maintenance management,
disposal of consumables, short microbiological tests
6. Re-qualification Operation optimisation of existing operating systems

DIN 1946-4 Folie 44 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Project performance specifications II


 Prepared by the orderer / customer
in cooperation with experts
 The target definition phase will be concluded
when the performance specification of the
project is approved by all parties involved in
target definition.
 This serves as a basis for planning.

DIN 1946-4 Folie 45 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Project performance specifications


 Project definition, Intended use description
 Project organisation and quality management
(QM-Masterplan)
 Testing concept (system qualification)
 Energy control and measurement concept
 Fire protection concept (fire compartments,
escape routes, smoke extraction, evacuation)
 Time schedule, cost estimate
DIN 1946-4 Folie 46 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Project performance specifications

 Room definitions (room data sheet) listing at least:


 hygiene classification
 protective-overpressure concept
 electrical safety classification
 room-climate requirements
(temperature, humidity, sound pressure level)
 materials to be used (walls, floor, ceilings, etc.)
 operational facilities, equipments (internal loads)

DIN 1946-4 Folie 47 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

parties involved in the project


 Investor (authorities, hospital management, etc.)
 Users (surgeons, anaesthetists, nursing service, etc.)
 Hospital hygiene (hospital-hygiene experts, cleaning pers.)
 Purchase departement (OP equipment, medium supply
system, IT equipment etc.)
 Maintenance staff (technical service, external maintenance
service, energy suppliers, etc.)
 Planner (architects, building services engineering, ...)
 Consultant (organizational and financial consultants, ...)
 Further parties involved in the project
DIN 1946-4 Folie 48 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Responsibilities
 Technical acceptance:
 Planner, manufacturer and supplier
 Hygienic acceptance:
 The measuring technician collect the readings
 the hospital-hygiene expert in charge makes the
hygienic interpretation and determines the
protective measures or use restrictions

DIN 1946-4 Folie 49 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Air hygiene in operating


operating rooms
Operating rooms are distinguished into:
 Operating rooms with ventilation systems of
unilateral flow (ULF) for attaining a protected area
in which the operation takes place and where the
instruments tables are positioned (room
room class 1A);
1A
 Operating rooms with ventilation systems of mixed
or turbulent displacement flow (room
room class 1B).
1B

DIN 1946-4 Folie 50 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Basic requirements on ventilation and air–


air–
conditioning in operating rooms class 1B
 Sound pressure level at a nominal air flow rate of
max. 48 dB(A)
 Supply air temperature 19-26°C (adjustable)
 Measurement of comfort (though not defined)
 Testing of the recovery time (recovery test)
according to DIN EN ISO 14644-3
 Reduction of the particle concentration
by 99 % within 25 minutes
DIN 1946-4 Folie 51 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

New operating room class 1A

 vertical displacement flow


 minimum size of the ULF diffuser 9,0 m2
 terminal, manufacturer inspected, high efficiency
particulate air (HEPA) filters H13
 surrounding airflow aprons down to the height of the
doors (approx. 2,1 m above foor level)
 supply air volume flow > 8‘000 m3/h
 outdoor air supply (800 –) 1200 m3/h
DIN 1946-4 Folie 52 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Basic requirements on ULF air diffusers


in operating rooms class 1A
 supply air velocity = 0,23 to 0,25 m/s
 minimum local supply air velocity = 0,15 m/s
 sound pressure level at a nominal air flow rate
of max. 48 dB(A)
 supply air temperature 19 - 26°C (adjustable)
 local deviation from Tmean: 0,3 K
 measurement of comfort (though not defined)
DIN 1946-4 Folie 53 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Integral OP acceptance tests (qualification)

Two acceptance tests:


tests:
Technical acceptance test
performance parameter of the
HVAC system
Hygienic acceptance test
sufficient protective effect against
load entry from outside
sufficient protective effect against
load entry from inside

DIN 1946-4 Folie 54 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

OP-
OP-Room acceptance test (outer load entry)

M3

OP-Lampe

M11 M12 M13

M2

M01 M02 M03


OP-Tisch
200x60 OP-Tisch
M1

DIN 1946-4 Folie 55 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

OP-
OP-Room acceptance test (inner load entry)

M3

OP-Lampe

M11 M12 M13

M2

M01 M02 M03


OP-Tisch
200x60 OP-Tisch
M1

DIN 1946-4 Folie 56 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Test structure I

DIN 1946-4 Folie 57 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Test structure II

DIN 1946-4 Folie 58 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Reference load

 reference particle concentration CRef = 106 P/ft3


(room background, ULF field surroundings)
 Protection degree 10-5 is correctly traceable
cx / cRef = 10 / 106 = 10-5
 aerosol flow is emitted at the specified locations,
the emission having low momentum and being
isothermal

DIN 1946-4 Folie 59 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Local protection class SGx


 measured values: particle concentration cx at a
hygienically relevant measuring point X in the
area to be protected

 cX 
 definition SGX = −log   cRef : 106 P/ft³
 cRef 
 example: cx = 950 P/ft³: SGX = 3,0

DIN 1946-4 Folie 60 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Result: Protection effect of the OP-


OP-Room
 The smallest numerical value of the local
protection classes is used to characterise the
actual protective effect of the operating room
 Usual range of values: SG = 1 ... 5
 The result integrates all influences of the clean air
diffuser (ULF), medical devices and anaesthetic
equipment, i.e. heat-load, convection, turbulences,
...
DIN 1946-4 Folie 61 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Interpretation of the protection classes

Degree of mean particle concen- Classification


protection SG tration at measuring
point X [P/ft3]
5 10 excellent
4 100 outstanding
3 1’000 Good
2 10’000 sufficient
1 100’000 insufficient
0 1’000’000 poor

DIN 1946-4 Folie 62 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

hospital-
hospital-hygiene conclusion
 State-
State-of-
of-the-
the-art operating rooms
Minimum requirement:
For the entire protected area a protective effect
> 4 (without operating lamps) or
> 2 (with operating lamps)
respectively, shall be demonstrated.

DIN 1946-4 Folie 63 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Acceptance test (turbulence intensity)


These examinations shall
be carried out in the
form of averaged
double determinations
above the test positions
(n = 17 in accordance
with Figure D.2 projected
onto the floor below the
LTF outlet ) marked by
black, orange and white
self-adhesive dots.

Figure D.2: 17 test positions in the measuring grid


projected onto the floor below the ULF outlet

DIN 1946-4 Folie 64 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Microbiological tests in the operating room


 The decision on the need for microbiological /
hygienic checks during operation is made by the
hospital-hygiene expert in charge.
 Requirements (Example sedimentation plates):
room class Ia: mean value of the specific colony
forming units: ≤ 1 CFU / (50 cm2 • 60 min);
 room class Ib: mean value of the specific colony
forming units : ≤ 5 CFU / (50 cm2 • 60 min).
 Airborne-germ counts in the empty operating room
are not required in any case.
DIN 1946-4 Folie 65 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Hygiene requirements on HVAC-


HVAC-Plants

 In addition to hospital-specific requirements,


the HVAC systems must also fulfil the
“common” requirements.
 Furthermore, observe VDI 6022 „Hygienic
standards for ventilation and air-conditioning
systems – Offices and assembly rooms” and its
requirements.

DIN 1946-4 Folie 66 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

next generation guideline

DIN 1946-4 Folie 67 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Summary and look-


look-out
 The new hospital guidelines contains for the
first time details on the technical and hygienic
qualification of operating rooms
 The results of predefined test methods lead to
clear quality characteristics which can be used
to deduce specific design elements.
 Verifiability of each design element allows to
achieve constant & reproducible quality levels

DIN 1946-4 Folie 68 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

DIN 1946-4 Folie 69 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Summary and look-


look-out II
 The target is a European guideline
 The first steps for the CEN guideline are made:
RESOLUTION taken by CEN/TC 156 Ventilation for
buildings, agrees to create the following Working
Group:
CEN/TC 156; WG 13 – Ventilation in Hospitals

 Research and development in the laboratory


operating room at the HTA School of
Engineering + Architecture in Lucerne

DIN 1946-4 Folie 70 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Conclusion on hospital hygiene

 Applies to all operating theatres:

Without a catalogue of flanking measures


and the application of due operational
discipline the best clean air technology
can only be seen as an 'alibi exercise'.

DIN 1946-4 Folie 71 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Thank you for


your attention

DIN 1946-4 Folie 72 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

more information

www.bht.ch
DIN 1946-4 Folie 73 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Swiss Guideline SWKI 99-


99-3

 Some additional information

DIN 1946-4 Folie 74 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Centralised sterilisation
 Centralised sterilisation must be subdivided into:
cleaning room, packing room and sterile goods
storeroom
 Decontamination- and (additional) cleaning machines
between cleaning area and packing area
 Pass-through autoclaves between packing area and
sterile goods storeroom
 Outgassing is required for material sterilised by gas-
eous media. These materials must be stored separately.

DIN 1946-4 Folie 75 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Hygiene Classification of rooms


based on the risk of infection

 General consideration
 Operating rooms and other rooms for surgical
interventions
 Other rooms with increased hygienic-requirements
 Other hygienically relevant rooms

DIN 1946-4 Folie 76 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Operating rooms and other rooms for


surgical interventions
 Outdoorair flow volume of 800 to 1000 m3/h
 for outdoorair three-stage filtering is required
 work checked terminal H13-filters
 ULF supply-air diffuser (unilateral-flow diffuser )
 Minimum size for the ULF diffuser 9.0 m2
 surrounding apron down to the height of the
doors (up to approx. 2,1m above floor level)
DIN 1946-4 Folie 77 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Other hygienically relevant rooms


 Patient’s room
 Emergency ward
 Recovery, observation room
 Delivery, Labour room,
Room for caesarean sections
 Waiting rooms

DIN 1946-4 Folie 78 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Waiting rooms
 The danger of transmitting unidentified
pathogen makes it necessary to provide
efficiently ventilated waiting rooms (exhaust-air
rate in excess of 75 m3/(h·P).
 Separate waiting rooms must be available for
patients undergoing immunological suppression

DIN 1946-4 Folie 79 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Basic requirements for rooms with


increased hygienic demands
 Requires increased outdoor-air flow rate
> 100 m3 / (h ·P)
 Terminal filter F9
 Non-unilateral flow may be accepted
(turbulent ventilation)

DIN 1946-4 Folie 80 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Rooms with increased hyg.


hyg.-requirements
 Sterile-goods storage / sterile corridor
 Angiographie, heart catheter laboratory, surgical
Angiographie where minor interventions serve to
implant foreign material
 minor surgery, dermatology, wound care
 Rooms for transplant recipients after surgery
 Intensive care unit including neonatology
 Endoscopic diagnosis
DIN 1946-4 Folie 81 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Isolating room
 Closed space
 Supply-air rate per room of 500 m3/h or
 Air-exchange rate of 12 vol/h
 Maintained at negative pressure
 Exhaust air shall be HEPA-filtered before entering
the exhaust-air network (terminal high-efficiency
particulate air filter, class H13)

DIN 1946-4 Folie 82 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir
Brunner Haustechnik AG, CH-8304 Wallisellen-Zürich

Isolating room
gemeinsame Zuluft gemeinsame Abluft

Joint supply air Joint exhaust

LW = 12-fach
ev. flexibel
AC = 12/h flexible ev.

50 m3/h 150 m3/h

F9 H13
100 m3/h

Korridor (bei Normalzimmer) Patientenzimmer Dusche / WC / Ausguss


Schleuse (bei ordentlichem Isolierzimmer)
Corridor (in case of normal room) Patient's room Shower / WC / Sink
Airlock (in case of normal isolation room)

DIN 1946-4 Folie 83 / 73 TESKON 2009 - TMMOB Makina Mühendisleri Odası Đzmir