0% found this document useful (0 votes)
259 views1 page

220kV Tower Foundation Design Details

The document appears to be an engineering drawing showing details of a 220kV tower foundation. It includes dimensions, labels, part identifiers, and engineering notation. The drawing shows plan and elevation views of the foundation with dimensions for things like depth, thickness, rebar locations and sizes. It also includes information like the designer, date, revision details, and contract reference.

Uploaded by

elsayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
259 views1 page

220kV Tower Foundation Design Details

The document appears to be an engineering drawing showing details of a 220kV tower foundation. It includes dimensions, labels, part identifiers, and engineering notation. The drawing shows plan and elevation views of the foundation with dimensions for things like depth, thickness, rebar locations and sizes. It also includes information like the designer, date, revision details, and contract reference.

Uploaded by

elsayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

75 2500 300 4500

350

75
A

PL

FGL
2426.8

C
500
B
B

4000
4000

2426.8
2626.8
2226.8
2426.8

C
500
2226.8

C
2626.8

75
A

75 2500 300

350

75
PL

FGL

25 450 25
C
150

500
200
500

C
150

150 200 150


500

4500
2426.8

C
500

75SIGNING
STAMPING/

DESIGNED BY: DATE: 22.09.2015


T. SARKAR

DWN BY: SUBMITTED BY:

N.K. DAS NOORKHAIL


DESIGNER:
SHEET

C 002A

1 100% DESIGN RESUBMITTAL FEB. 11 , 2016


NUMBER:

G.A DETAIL OF 220kV TOWER FOUNDATION MKD.-S1 CHK BY: CONTRACT


REFERENCE

SCALE - 1 : 25

FOR 220/20kV PULE ALAM SUBSTATION S. MUKHERJEE W912ER-14-C-0023 0 1ST. SUBMISSION (DETAIL ENGINEERING) SEP 22 , 2015