0% found this document useful (0 votes)
2K views16 pages

6 M Span Culvert

This document provides a detailed estimate for the construction of a 6m span single vent slab culvert. It includes 10 items with descriptions of work, quantities, units and rates. The total earthwork excavation required is 256.03 cubic meters. Formwork and reinforcement bar will be provided for the concrete works. Backfilling, plastering and other miscellaneous works are also included. The document contains all necessary information to estimate the total cost of the project.

Uploaded by

SUJIT TaLUKDAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views16 pages

6 M Span Culvert

This document provides a detailed estimate for the construction of a 6m span single vent slab culvert. It includes 10 items with descriptions of work, quantities, units and rates. The total earthwork excavation required is 256.03 cubic meters. Formwork and reinforcement bar will be provided for the concrete works. Backfilling, plastering and other miscellaneous works are also included. The document contains all necessary information to estimate the total cost of the project.

Uploaded by

SUJIT TaLUKDAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 16

DETAILED ESTIMATE

Name of Work : Construction of 6m span of Single vent slab culvert @ Seelamuthaiyapuram Vandiyur Road
to Muthurajapuram Road at Thummagundu Panchayat
Length Depth
Sl.No Description of item Nos (m) width(m) (m) Unit

Earth work excavationfor foundation


of structures up to 3m depth as per
drawing and technical specification
1 clause 1140 including setting
out,construction of shoring and
bracing ,removal of stumps and other
deleterious matter, dressing of sides
and botto

Abutment footing 1 2 10.90 3.30 1.80 Cum

Wing wall footing 1 4 5.00 2.60 1.80 Cum

Retaining wall 1 1 12.50 1.70 1.55 Cum

Total Cum

Providing and laying concrete for


plain/Reinforced concrete with 40
2 mm metal (cc 1:3:6) in open
foundation complete as per drawings
and MORD technical specification
clauses 802,803,1202 &1203

Foundation up to Sill Level

Abutment
1st footing 1 2 10.90 3.30 0.60 Cum
2nd footing 1 2 10.10 2.90 0.60 Cum
3 rd footing 1 2 9.30 2.50 0.60 Cum

WING WALL

1st footing 2 2 5.00 2.60 0.60 Cum

2nd footing 2 2 5.00 2.20 0.60 Cum

3 rd footing 2 2 5.00 1.80 0.60 Cum

Approach slab both sides 1 2 5.00 6.80 0.15 Cum


Retaining Wall

Base Concrete 1 1 12.50 1.70 0.20 Cum


1st footing 1 1 12.50 1.55 0.45 Cum
2nd footing 1 1 12.50 1.40 0.45 Cum
3 rd footing 1 1 12.50 1.25 0.45 Cum
ASL (1.1+0.45)/2 1 1 12.50 0.78 2.00 Cum

Total

Providing and laying cement concrete


with 40 mm metal (1:2:4) in
3
superstructure as per drawing and
MORD
technical specificationclause clause
800,1250.4
&1205.5

Above Sill Level

Abutments 1 2 7.50 (2.5+.72)/2 1.50 Cum

Wings 1 4 5.00 (1.4+.45)/2 2.50 Cum

Approach slab both sides 1 2 5.00 6.80 0.20 Cum

Total
Providing and laying reinforced
cement concrete (1: 1.5 :3)in
superstructure as per drawing and
4 MORD
technical specification clause
800,1250.4
&1205.5 Design mix m 25 for deck
slab
Design mix m 25 for deck slab

Design mix m 25 for deck slab

Deck slab 1 1 7.50 6.80 0.48 cum

Parapet wall - vertical pillar 2 4 0.20 0.20 0.90 cum

Horizontal 2 3 6.00 0.20 0.20 cum

Kerb 1 2 7.40 0.45 0.20 cum

Bed block for abutment 1 2 7.50 0.72 0.25 cum

Dirt wall for abutment 1 2 7.50 0.30 0.48 cum

Total

Centering: Providing form work for


centering, shuttering etc., for all RCC
5
works including strutting up to 3.29m
in all floors using mild steel sheets of
size 90 x 60 cm of B G 10 stiffened
with mild steel angles of size 25 x 25 x
3mm laid over silver oak

Below Sil Level

Abutment
1st footing 2 2 (10.9+3.3) 0.60 Sqm
2nd footing 2 2 (10.1+2.9) 0.60 Sqm
3 rd footing 2 2 (9.3+2.5) 0.60 Sqm

Wing wall
1st footing 2 4 5.00 0.60 Sqm
2nd footing 2 4 5.00 0.60 Sqm
3 rd footing 2 4 5.00 0.60 Sqm
Retaining Wall
1st footing 1 2 12.50 0.45 Sqm
2nd footing 1 2 12.50 0.45 Sqm
3 rd footing 1 2 12.50 0.45 Sqm
ASL 1 2 12.50 2.00 Sqm
Total
Centering: Providing form work for
centering, shuttering etc., for all RCC
6
works including strutting up to 3.29m
in all floors using mild steel sheets of
size 90 x 60 cm of B G 10 stiffened
with mild steel angles of size 25 x 25 x
3mm laid over silver oak

Above Sil Level

Abutment

2 2 (7.5+1.6) 1.50 Cum

Wing wall

2 4 (5+.7) 2.50 Cum

Deck Slab
Deck Slab 1 1 7.50 6.00
Sides 1 2 6.80 0.48
Kerb 2 2 7.40 0.20
vertical pillar 2 4 0.80 0.90 cum
Horizontal 2 3 7.40 0.60

Bedblock
Abutment 2 2 7.50 0.25

Dirt wall
abutment 2 2 7.50 0.48

supplying, fitting and placing HYSD


bar
reinforcement in superstructure
7
complete as per
drawing and MORD technical
specification clauses
1002,1010,&1202

For deck slab as per scheduled


enclosed 1 1 2.50 MT 2.50

Total MT
providing and fixing 20mm thick
compressible
8 fiber board in expansion joint
complete as
per drawing and MORD technical
specification

Over abutment 1 2 7.50 0.48 Total sqm


Backfilling behaind abutment , wing
wall and
9 return wall complete as per drawing &
MORD
technical specification clause
1240.3.8
Rear side of abutment 1 2 3.15 1.05 1.50 cum
Wingwall 2 2 2.10 1.05 1.20 cum
Both sides Inbetween wing walls 1 2 5.00 6.90 0.60 cum
Total

Plastering with cement mortar (1:3)


10mm thick
10
on masonary work in sub-structure
as per MORD technical specification
clause 613.4 &1204
over wings 2 2 5.00 0.45 sqm
Total

Rough stone dry packing for apron


and revertments of stone with new
11 including cost and conveyance of all
materials to site and all labour
charges etc complete as per standard
specification - 10m2
Water way 1 1 6.00 7.90 sqm
Total

Supplying and fixing in position best


12 qulity PVC Rain water pipe having ISI
mark and providing leak proof joints
inculding fixing to the wall with
special PVC / MS clamps etc
Wing wall 2 1 1.00 2.20 RM
Abutment 2 1 1.00 1.50 RM
Total
Photography Charges

Painting and lettering of Name Board


unforseen Charges
puram Vandiyur Road

Quantity

129.49

93.60

32.94

256.03

43.16

35.15

27.90

31.20

26.40

21.60

10.20
4.25

8.72

7.88

7.03

19.38

242.86

36.23

46.25

13.60

96.08
24.48

0.29

1.44

1.33

2.70

2.16

32.40

34.08

31.20

28.32

24.00

24.00

24.00

11.25
11.25
11.25
50.00
249.35
54.60

114.00

45.00

6.53

5.92

5.76

26.64

7.50

14.40

280.35

2.50
7.20

9.92
10.58
41.40
61.91

9.00
9.00

47.40
47.40

4.40
3.00
7.40
ABSTRACT ESTIMATE
Name of Work : Construction of 6m span of Single vent slab culvert @ Seelamuthaiyapuram
Vandiyur Road to Muthurajapuram Road at Thummagundu Panchayat

Sl.No Qty Description of item RATE PER UNIT AMOUNT

1 2 3 4 5 6

Earth work excavationfor foundation of structures


up to 3m depth as per drawing and technical
specification clause 1140 including setting
1 256.03 72.80 CUM 18 639
out,construction of shoring and bracing ,removal
of stumps and other deleterious matter, dressing
of sides and botto

Providing and laying concrete for plain 40 mm


Metal concrete (1:3:6) in open foundation
2 242.86 2890.14 CUM 7 01 905
complete as per drawings and MORD technical
specification clauses 802,803,1202 &1203

Providing and laying concrete for plain 40 mm


Metal concrete (1:2:4) in open foundation complete
3 96.08 3372.15 CUM 3 23 979
as per drawings and MORD technical specification
clauses 802,803,1202 &1203

providing and laying reinforced cement concrete


(1:1 1/2 :3) in superstructure as per drawing and
4 32.40 MORD 4774.63 CUM 1 54 698
technical specificationclause clause 800,1250.4
&1205.5 Design mix m 25 for deck slab

Centering: Providing form work for centering,


shuttering etc., for all RCC works including
strutting up to 3.29m in all floors using mild steel
5 249.35 135.00 SQM 33 662
sheets of size 90 x 60 cm of B G 10 stiffened with
mild steel angles of size 25 x 25 x 3mm laid over
silver oak Below Sill Leval

Centering: Providing form work for centering,


shuttering etc., for all RCC works including
strutting up to 3.29m in all floors using mild steel
6 280.35 330.00 SQM 92 515
sheets of size 90 x 60 cm of B G 10 stiffened with
mild steel angles of size 25 x 25 x 3mm laid over
silver oak Above Sill Leval

supplying, fitting and placing HYSD bar


reinforcement in superstructure complete as per
7 2.50 drawing and MORD technical specification clauses 65183.00 MT 1 62 958
1002,1010,&1202
8 LS providing and fixing 20mm thick compressible LS 2 000
fiber board in expansion joint complete as
per drawing and MORD technical specification
Backfilling behind abutment , wing wall and
9 61.91 return wall complete as per drawing & MORD 125.00 CUM 7 738
technical specification clause 1240.3.8

Supplying and fixing in position best qulity PVC


10 LS Rain water pipe having ISI mark and providing LS 1 500
leak proof joints inculding fixing to the wall with
special PVC / MS clamps etc

Photography Charges

Painting and lettering of Name Board

unforseen Charges 406


15 00 000