Appropriation Request: Major Elements of Estimate Estimated Expenditures

This document is a request for appropriation of funds. It provides fields to specify the location, division, title, date, and budget center for the request. It allows the requester to check boxes indicating whether the funds are for a capital budget item, long range plan item, an addition, replacement, acquisition, or other. The major elements of the estimated expenditures such as working capital, fixed assets, and expenses are to be provided. Justification for primary savings or increases in volume/costs are also requested. The request requires approval signatures from the requestor and approver along with an appropriation number.

Uploaded by

Rendra Syam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Appropriation Request: Major Elements of Estimate Estimated Expenditures

This document is a request for appropriation of funds. It provides fields to specify the location, division, title, date, and budget center for the request. It allows the requester to check boxes indicating whether the funds are for a capital budget item, long range plan item, an addition, replacement, acquisition, or other. The major elements of the estimated expenditures such as working capital, fixed assets, and expenses are to be provided. Justification for primary savings or increases in volume/costs are also requested. The request requires approval signatures from the requestor and approver along with an appropriation number.

Uploaded by

Rendra Syam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

APPROPRIATION REQUEST

LOCATION : _______________________ DIVISION : _________________

TITLE : DATE : ___________________


BUDGET CENTER ___________________

AUTHORIZATION IS REQUESTED FOR AN EXPENDITURE OF

CHECK APPROPRIATE LINE CHECK APPROPRIATE LINE CHECK APPROPRIATE LINE LIFE OF PROJECT YRS _______________________

__ SPECIFIED IN CAPITAL BUDGET __ PURCHASE OF LAND PAYBACK NO. OF YEARS _____________________


__ NOT SPECIFIED BUDGET ___ ADDITION __ PURCHASE OF FIXED ASSETS DISCOUNTED CASH FLOW RATE OF RETURN
__ IN LONG RANGE PLAN ___ REPLACEMENT __ ACQUISITION OF BUS. OR PROD. LINE _____________________________
MAJOR ELEMENTS OF ESTIMATE ESTIMATED EXPENDITURES

WORKING CAPITAL FIXED ASSETS EXPENSE TOTAL

TOTAL
JUSTIFICATION AND SAVING INFORMATION (IF NECESSARY ATTACH ADDITIONAL DATA) : PRIMARY JUSTIFICATION

_____ VOLUME INCREASE


_____ COST SAVING
_____ NON PRODUCTIVE

REQUEST BY APPROVED BY : KEVIN J.

TITLE PRESIDENT DIRECTOR

NOTE APPROPRIATION NO. : _______________________________________

You might also like