100% found this document useful (1 vote)
4K views6 pages

Steel Connection With Block Details

Connection With Block Details

Uploaded by

AlaaBadwy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views6 pages

Steel Connection With Block Details

Connection With Block Details

Uploaded by

AlaaBadwy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

BACKER ROD 16 GA. x 1½” W.

BACKER ROD PLANS


& SEALANT STRAP ANCHOR W/ & SEALANT
2” VERTICAL LEGS N.T.S.
PROVIDE GAP
EQUIVALENT TO PROVIDE GAP EQUIVALENT TO
ANTICIPATED LIGHT GAGE METAL ANTICIPATED FRAME DRIFT
FRAME DRIFT BACKER AS REQ’D

NOTES:
1. FOR FIRE-RATED
CONSTRUCTION, USE
FIRE-RATED SEALANT
2. FIREPROOFING FOR
STEEL NOT SHOWN
3. APPLIES TO TYPE I
AND TYPE II HYBRID
4. TYPE III HYBRID WOULD
REQUIRE FULL BEARING AT
STEEL INTERFACES WITH
COLUMNS & BEAMS

3D VIEWS

COLUMN CONNECTION DETAILS OPTION 1


DETAIL 02.120.1101 REV. 10/15/08
© 2011 INTERNATIONAL MASONRY INSTITUTE
FIG. 6
IMI TECH BRIEF 02.13.02

BACKER ROD & SEALANT,


BOTH SIDES OF CMU WALL
3/16” Ф WIRE ANCHOR

LIGHT GAGE METAL


BACKER AS REQ’D

NOTES
1. FOR FIRE-RATED CONSTRUC-
TION, USE FIRE-RATED SEALANT
2. FIREPROOFING FOR STEEL NOT
PROVIDE GAP SHOWN
EQUIVALENT TO 3. APPLIES TO TYPE I AND II HYBRID
FRAME DRIFT
ANTICIPATED 4. TYPE III HYBRID WOULD REQUIRE
FULL BEARING AT STEEL INTER-
FACES WITH COLUMNS & BEAMS

COLUMN CONNECTION DETAIL


DETAIL 02.120.1103 REV. 07/24/09
© 2011 INTERNATIONAL MASONRY INSTITUTE
FIG. 6
IMI TECH BRIEF 02.13.02

BACKER ROD & SEALANT,


BOTH SIDES OF CMU WALL
3/16” Ф WIRE ANCHOR

LIGHT GAGE METAL


BACKER AS REQ’D

NOTES
1. FOR FIRE-RATED CONSTRUC-
TION, USE FIRE-RATED SEALANT
2. FIREPROOFING FOR STEEL NOT
PROVIDE GAP SHOWN
EQUIVALENT TO 3. APPLIES TO TYPE I AND II HYBRID
FRAME DRIFT
ANTICIPATED 4. TYPE III HYBRID WOULD REQUIRE
FULL BEARING AT STEEL INTER-
FACES WITH COLUMNS & BEAMS

COLUMN CONNECTION DETAIL


DETAIL 02.120.1103 REV. 07/24/09
© 2011 INTERNATIONAL MASONRY INSTITUTE
OPTION 1A OPTION 1B

SIZE GAP FOR DRIFT & DEFLECTION


OF BEAM FOR TYPE I HYBRID; OR
FILL GAP W/ DRYPACK FOR TYPE II
OR TYPE III HYBRID
OPTION 1A: A-SHAPED BLOCK AT
TOP COURSE; OR OPTION 1B: CUT
OUT FACE SHELL AND REPLACE
AFTER GROUTING; HEIGHT VARIES

1/4” THK x 6” WIDE PLATES FOR


SHEAR TRANSFER; WELD TO
BEAM AFTER CMU PLACEMENT
THROUGH-BOLT OR LAG BOLT AS
REQ’D FOR SHEAR TRANSFER

BOND BEAM AT SECOND


COURSE FROM TOP

GROUT & REINFORCING


AS REQ’D

UNDERSIDE OF BEAM OPTION 1


DETAIL 02.120.1201 REV. 03/02/09
© 2011 INTERNATIONAL MASONRY INSTITUTE
OPTION 2

SIZE GAP FOR DRIFT & DEFLECTION


OF BEAM FOR TYPE I HYBRID; OR
FILL GAP W/ DRYPACK FOR TYPE II
OR TYPE III HYBRID
OPTION 2: SOLID BLOCK AT
TOP COURSE (HEIGHT VARIES)

1/4” THK x 6” WIDE PLATES FOR


SHEAR TRANSFER; WELD TO
BEAM AFTER CMU PLACEMENT
THROUGH-BOLT OR LAG BOLT AS
REQ’D FOR SHEAR TRANSFER

BOND BEAM AT SECOND


COURSE FROM TOP

GROUT & REINFORCING


AS REQ’D

UNDERSIDE OF BEAM OPTION 2


DETAIL 02.120.1202 REV. 03/02/09
© 2011 INTERNATIONAL MASONRY INSTITUTE
TEMPORARY FORMWORK
FOR GROUT

STUDS WELDED TO
UNDERSIDE OF BEAM
1/4” THK x 6” WIDE PLATES
FOR SHEAR TRANSFER;
WELD TO BEAM AFTER CMU
PLACEMENT
OPTION 3: GROUT SOLID
FOR TYPE II OR TYPE III
HYBRID ONLY
THROUGH-BOLT OR
LAG BOLT AS REQ’D
FOR SHEAR TRANSFER

BOND BEAM AT TOP


COURSE

GROUT & REINFORCING


AS REQ’D

UNDERSIDE OF BEAM OPTION 3, TYPE II OR TYPE III HYBRID ONLY


DETAIL 02.120.1203 REV. 03/02/09
© 2011 INTERNATIONAL MASONRY INSTITUTE