How to change material master
It may be needed to change certain option in our material master
(due to the organizational changes, or changes in processes). We
cannot use MM01 as that is the transaction code used only for
creating views that are not maintained for certain material. In this
case, we need to use MM02 and MM03 transaction codes.
In SAP transactions ending with 01 are for creating, ending with 02
for editing/changing, and the ones ending in 03 are used for viewing
data without possibility to change it.
Process to change Material Master
Step 1)
1. Enter transaction code MMO2 in the command prompt
2. Enter the material number whose material master data we
want to change.
Step 2)
1. The next step is choosing the views for which data is to be
changed. For example, we will choose sales organization data 2
view. You can choose one or more organizational levels for
change.
2. Click on Organizational Levels
3. Organizational level selection
Step 3)
1. Maker the desired changes.
2. Click the check button.
Step 4) After you have made the changes , you can check the
changes in the corresponding view
Step 5) Click the save button , to save the changes NOTE:You can
use transaction MM03 to display Material Master Data. In MM03, we
can only display data without the possibility to change it (fields are
greyed out).