0% found this document useful (0 votes)
47 views1 page

Woodjamb Sample

This document is a progress billing report from E.V. delosReyes-Contractor and Man Power services to Engr. Wiljem Valenzuela for the Canyon Woods project. It details the linear meters and corners installed for wooden jambs from the lower ground floor to the 10th floor totaling PHP 18,450 after a 10% retention amount. Materials and labor were provided for installing wooden jambs on the main staircases between various floors of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Woodjamb Sample

This document is a progress billing report from E.V. delosReyes-Contractor and Man Power services to Engr. Wiljem Valenzuela for the Canyon Woods project. It details the linear meters and corners installed for wooden jambs from the lower ground floor to the 10th floor totaling PHP 18,450 after a 10% retention amount. Materials and labor were provided for installing wooden jambs on the main staircases between various floors of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

E.V.

delosReyes-Contractor and Man Power services

Project : CANYON WOODS date: Feb.07,2019

To : Engr. Wiljem Valenzuela

Project-in-Charge

Thru : Policome Const &Devpt .Corp.

Re : PROGRESS BILLING # 01

Sir/Gentlemen;

Installation of wooden jamb(main stair).

LOWER GRD-UPPER GRD FLR lm 9.0 1.0 9.0 50.00 450.00

UGF- 1 floor lm 16.15 1.0 16.15 50.00 807.50

1 floor- 2nd floor lm 7.90 1.0 7.90 50.00 395.00

2nd -9th floor lm 55.27 1.0 55.27 50.00 2,763.5

9th -10th floor lm 10.00 1.0 10.00 50.00 500.0

LGF- upper grd flr corners 4.0 1.0 4.0 300.00 1,200.0

UGF- 1st floor 8.0 1.0 8.0 300.00 2,400.0

!st floor- 2nd floor 4.0 1.0 4.0 300.00 1,200.0

2nd flr- 9th floor 32.0 1.0 32.0 300.00 9,600.0

9th -10th floor 4.0 1.0 4.0 300.00 1,200.0

20,500.0

10% ret 2050.0

EDMOND DELOSREYES 18,450.0