RVPR CONSTRUCTION PVT LTD
SAFE WORK PROCEDURE
Project Name : 3*8 MW STPP Name of Customer : NTPC /PVUNL
Department : CIVIL Name of Client : BHEL,TBG
Location : PVUNL, PATRATU Name of Working Agency : RVPR
Job Title : AREA GRADING Doc no : RVPR/SWP/00
Job Duration : Work order no :
Condition of Tools Reference to
Activities Person Responsible
SL NO Hazards Safety Precautions and Tackles Document/Criteria&
(Sequence of work) & PH NO
Ok/Not ok Remarks
Prior to start the work the work SS/ENGG- 25(WORK
permit will be filled up in PERMIT SYSTEM)
triplicate to clarify the type of SS/ENGG-07(PPE’S)
work involved. SS/ENGG-
Proximity / six directional 13(BARRICADING)
hazards of the area and SS/ENGG-
necessary precautions will be 45(MANAGEMENT OF
carryout. FIRST AID CASES IN
Area will be barricaded with SHOP FLOOR)
1 General Statutory warning tapes/safety nets
Prohibitions wherever is required
Jobs carried out under
supervision
Approach to DB ,panels,
switches to be kept clear
First aid box must keep near the
work area.
Employees will be made
acquainted with the use of
[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
safety appliances
Job specific safety briefing will
be given before start the each
shift
Co-ordination will be
maintaining with all other
agencies
Proper identification mark will
be provided for every winch
unit/Rig unit
Area should be cleaned before
starting the job and after
completed the job
Lifting equipments, accessories
will be deployed at site
appropriately .Test certificates
of lifting equipments will be
ready at site& will be produced
on demand.
Pollution under control
certificates for all vehicles
should be take from authorized
agency
Unnecessary water
accumulation will be avoided
Pest control will be deployed for
mosquito
Contract board with details of
site supervisor& contact
number will be displayed
Follow the all requirements of
OHSAS,TSL ,safety standards
and all legal appliances law
Daily safety talk on Risk and
Rescue management at site
[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
Sl. Activities Hazards Control measures/Safety Precautions Responsible Condition References to
no Person & Ph no of Tools & Document/Criteria
Tackles & Remarks
2 Excavation & Cave - in Get clearance before starting
Backfilling Electric the work from client SS/Engg/GEN -01
Shock. representatives / authorized
Pipeline person of client.
Damage.
Snake bite. Anticipating identified bush area
by bamboos, stick or rod.
SS/Engg/GEN -03
Foot injury. Provide safety shoe and
gumboot.
Immediately give the first – aid
treatment.
[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
Slip,Trip & Barrication should be provided
Falling. on the Excavated area.
Provided Hard barrication,if the
Excavated area’s depth is more
than 1.5mtr.
Provided warning signage &
caution board near Excavation
area.
Excavation &
Backfilling. Ground water De-watering continuously if
spillage. water spillage found on
Excavated area.
Soil collapse. Applied shoring process and
use safety net if the soil in
collapsible condition.
Don’t kept the loose soil from
1mtr of the excavation area.
Overhead Operator & Signalman should
High voltage be briefed about overhead high
Transmission voltage Transmission line if any
line. at working area.
[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
Equipment Do not overload on the vehicle.
Toppling. Do not allowed the
unauthorized person to
operate the vehicle.
Checking the condition of Tools
Excavation & & Tackles before starting the
Backfilling work.
Always provided a well trained
signalman / flagman on the
Struck by. vehicle.
Reverse Horn and back
indicator should be in working
condition.
Do not comes under the
circumstances of Excavator’s
swing area.
Always maintain a safe distance
of 3-5mtr from Excavator’s
swing area.
Do not drive above 20km/hr at
site.
Road
accident. Followed all Traffic rules during
driving the vehicle.
[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency