Mix Design Calculation M50Grade: For Nirvana Site

This document provides a mix design for M50 grade concrete with 50% GGBS to be used at the Nirvana site. The mix has a water-cement ratio of 0.31, with 270 kg of cement and 270 kg of GGBS. The mix also includes 596 kg of 20mm aggregate, 481 kg of 10mm aggregate, and 764 kg of sand. Testing of concrete cubes at 7 and 28 days found average compressive strengths of 37.13 N/mm2 and 65.11 N/mm2 respectively, meeting the target strength.

Uploaded by

Ankur Dalal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
388 views1 page

Mix Design Calculation M50Grade: For Nirvana Site

This document provides a mix design for M50 grade concrete with 50% GGBS to be used at the Nirvana site. The mix has a water-cement ratio of 0.31, with 270 kg of cement and 270 kg of GGBS. The mix also includes 596 kg of 20mm aggregate, 481 kg of 10mm aggregate, and 764 kg of sand. Testing of concrete cubes at 7 and 28 days found average compressive strengths of 37.13 N/mm2 and 65.11 N/mm2 respectively, meeting the target strength.

Uploaded by

Ankur Dalal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Mix design calculation M50Grade

For NIRVANA Site 540


Cement 270 0.50 50 % GGBS Date- 21-03-2018
GGBS 270 W/C TM - 32
W/C 0.31 OPC 53 Grade Ultra_ Cement
Water 167 With GGBS
A.Content 0 %
CA:FA (In %) 57 43
20:10 55 45
ADMIX : SIKA PLAST 5244 NS
Admix ( in %) 1.00
admix (in kg) 5.4
Sp. gravity of cement 3.15 Cement - week 4
Sp. gravity of GGBS 2.90 Source of aggregate- Ramchandra Agregate
Sp. gravity of admix 1.090 GGBS -week 10
Sp. gravity of 20 mm 2.93
Sp. gravity of 10 mm 2.89
Sp. gravity of crusher sand 2.74

CALCULATION
vol. of Cement+p fly ash 0.1788 m3
vol. of water 0.1674 m3
vol. of chemical admix 0.0050 m3
Volume ( In m3) =A= 0.3512 m3
Therefore
vol of Coarse & Fine agg. = (1-A)= 0.6488 m3
vol of ca 0.3698 m3
vol of fa 0.2790 m3

Therefore
20 mm 596 Kg.
10 mm 481 Kg.
sand 764 Kg.

All in Aggregate Gradation ( IS: 383-1970 Table - 5 )


Aggregates River sand C. Sand 20 mm 10 mm
Proportion Specific
0 43 31 26 Combined % Midlimits of Sp.
Limits MSA
Ratio 0 0.43 0.3135 0.2565 Passing Limits
20 mm
IS Sieve (mm) % Passing
80 100 100 100 100 100 100 --
40 100 100 100 100 100 100 100
20 100 100 91.91 100 97.46 97.5 95-100
4.75 92.95 100 0 0.27 43.07 40 30-50
0.6 22.92 33.83 0 0 14.55 22.5 10-35
0.15 2.25 16.17 0 0 6.95 3 0-6

Hence, For 1 m3 of concrete (In S.S.D Condition)


Cement 20mm 10mm C.sand Water Admixture GGBS
270.0 596 481 764 167 5.40 270 2554
moisture+ Water absorp. 0.00 0.00 0.00
water absorption 1.11 1.00 3.79
net correction -1.11 -1.00 -3.79
-6.62 -4.81 -28.97 -40.40

After
Correction:-
For 1 m3 of 270.0 589 476 735 208 5.40 270 2554
Concrete

0.035cum 9.45 20.63 16.67 25.74 7.27 0.19 9.45


Mixing time :-10.10AM
Conc. Temp :- 33.5 degree
Air Temp:- 32 degree
Mix Quality :- Cohesive
Extra water added = 0
Water save = 0
Slump :-Intial-collapse,Half Hours- collapse,One Hours-180mm,11/2 Hrs-170mm,2Hrs-150mm,21/2Hrs-130mm,3Hrs-120mm
Cube casted :- 06 Nos.
Weight Load Strength Average
Age Density ( Kg/m3 ) 2
Remark
(In kg) ( KN ) ( N/mm ) (N/mm2)

2585 8.725 789.50 35.09


7 Days 2581 8.710 726.00 32.27 37.13 28-Mar-18

2576 8.695 990.50 44.02

2587 8.730 1445.00 64.22


28 Days 2573 8.685 1530.00 68.00 65.11 18-Apr-18

2575 8.690 1420.00 63.11