Times Dim Results Description Unit QTY

The document provides details on reinforcement mesh and formwork quantities for various concrete slabs and pile caps of a building. It lists the dimensions, material, unit and quantities of B.R.C. mesh reinforcement used in the ground floor slab, corridor slab and various pile caps. It also lists the dimensions, rates and quantities of sawn formwork provided for the sides of different pile caps and column stumps. In total, it specifies reinforcement and formwork requirements for slabs and pile caps across multiple areas of the building.

Uploaded by

Jack Jack
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

Times Dim Results Description Unit QTY

The document provides details on reinforcement mesh and formwork quantities for various concrete slabs and pile caps of a building. It lists the dimensions, material, unit and quantities of B.R.C. mesh reinforcement used in the ground floor slab, corridor slab and various pile caps. It also lists the dimensions, rates and quantities of sawn formwork provided for the sides of different pile caps and column stumps. In total, it specifies reinforcement and formwork requirements for slabs and pile caps across multiple areas of the building.

Uploaded by

Jack Jack
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Times Dim Results Description Unit QTY

B.R.C mesh reinforcement with 150mm


side and end laps (measured net. and no
allowance made for laps)

249.20 No. A7 in ground floor slab m2 249.20

113.323 No. A7 in corridor slab m2 113.323

249.20 No. A8 in ground floor slab m2 249.20

113.323 No. A8 in corridor slab m2 113.323

113.323 No. A9 in corridor slab m2 113.323

249.20 No. A10 in ground floor slab m2 249.20

113.323 No. A10 in corridor slab m2 113.323

249.20 No. A12 in ground floor slab m2 249.20


Times Dim Results Description Unit QTY
Sawn formwork as described to
reinforced concrete work

Formwok
Pile cap (P2)
gth.
2/1.2+0.05 2.50
2/0.6+0.05 1.30
3.80
3/ 3.80 Fwk. to sides of isol. pile cap 7.98
0.70 7.98 [

Pile cap (P3)


2/0.48 + 0.77 + 0.05 2.60
0.60
1.20
4.40
5/ 4.40 Fwk. to sides of isol. pile cap m2 15.40
0.70 15.40 [

Pile cap (P4)


4/1.2 + 0.05 5.00
5.00
3/ 5.00 15.00 Fwk. to sides of isol. pile cap 15.00
[

Pile cap (P6)


2/1.90 + 0.05 3.90
2/1.2 + 0.05 2.50
6.40
1/ 6.40 6.40 Fwk. to sides of isol. pile cap 6.40
[

To sides of column stump


2/0.25 0.50
2/0.60 1.20
1.70
12/ 1.70 Fwk. to sides of isol. pile cap
4.00 81.60 [ m2 81.60