UK Process & Standards: Richard Lane UK & EU BIM Task Group 29 November 2016

The document discusses UK and EU standards for BIM (Building Information Modeling) processes. It describes standards developed that define the project lifecycle from delivery through operation. These include PAS1192-2 for information management during delivery, BS 8536-1 for involving operators from the start, and PAS1192-3 for information management during operations. A case study of the Ministry of Justice's BIM implementation is provided, including workshops to map processes and a published strategy. Savings of 20% in delivery costs and targeted savings of 30% in costs and 50% in schedule from a design for manufacture strategy are cited.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views

UK Process & Standards: Richard Lane UK & EU BIM Task Group 29 November 2016

The document discusses UK and EU standards for BIM (Building Information Modeling) processes. It describes standards developed that define the project lifecycle from delivery through operation. These include PAS1192-2 for information management during delivery, BS 8536-1 for involving operators from the start, and PAS1192-3 for information management during operations. A case study of the Ministry of Justice's BIM implementation is provided, including workshops to map processes and a published strategy. Savings of 20% in delivery costs and targeted savings of 30% in costs and 50% in schedule from a design for manufacture strategy are cited.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

UK Process & Standards

Richard Lane
UK & EU BIM Task Group
29 November 2016
We (eventually) agreed common stages through working with:
• Institutions representing design professionals;
• Repeat public & private sector clients;
• Other institutions (outside construction industry)

Delivery Operation
We developed standards that described the project lifecycle…
From the ‘Delivery’ stage

• PAS1192-2
• Information management for the
capital / delivery phase;
• ‘…specific guidance for the
information management
requirements associated with
projects delivered using BIM…’
At handover from ‘delivery’ to ‘operations’…

• BS 8536-1
• Involve the operator and the
operations team and their supply
chain from the outset;
• Extend the involvement of the supply
chain for the project’s delivery through
to operations and defined periods of
aftercare.
And into ‘operations’…

• PAS1192-3
• Information management for the
operational phase;
• Integrating the management of
information across the longer term
activity of asset management with the
shorter term activity of asset
construction for a portfolio of assets
should deliver real savings.
Departmental case study
Ministry of Justice Case
Engagement workshops
• 3 x workshops from 2011 to January 2012:
• Delivery Management;
• Commercial processes;
• Technical.
Coordinated process map completed January 2012
• Why is the information required? (purposes /
questions)
• When is the information required? (decision
point / workstage)
• What information is required? (information
type and level of detail)
• Who is responsible for preparing the
information (roles & responsibilities)
• How will the information be delivered
(exchange format and process)
BIM implementation strategy published March 2012
Early adopter project March 2012 – early 2013

• ~20% savings in capital


delivery cost
BIM library developed 2013
Design for Manufacture strategy developed early 2015
Design for Manufacture strategy implemented 2017?

• ~Targeted savings
of 30% cost, 50%
programme