Toolkit Room Design Plans

The document contains a site plan and floor plan drawings for a Toolkit Room located at a PMKS facility. The site plan shows the location of the Toolkit Room relative to other buildings on the property including a warehouse and fertilizer storage. The floor plan drawing provides dimensions and views of the 7 square meter Toolkit Room space. Notes on the drawings indicate they are for design purposes only and refer to more detailed specifications.

Uploaded by

Zahar_Ripani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views7 pages

Toolkit Room Design Plans

The document contains a site plan and floor plan drawings for a Toolkit Room located at a PMKS facility. The site plan shows the location of the Toolkit Room relative to other buildings on the property including a warehouse and fertilizer storage. The floor plan drawing provides dimensions and views of the 7 square meter Toolkit Room space. Notes on the drawings indicate they are for design purposes only and refer to more detailed specifications.

Uploaded by

Zahar_Ripani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

DRAWING

TOOLKIT ROOM PMKS


PT.BANGKITGIAT USAHA MANDIRI
LOKASI TOOLKIT ROOM
PMKS

4000
180000

GUDANG
PUPUK

25000
117000

69000

PT. BANGKITGIAT USAHA MANDIRI

SARPRA

6000
6596

3000 3000

SITE PLAN 1:800

IBU YENTI

HENRY MORISON ST

3000

5000
BP. TOMMY
3000

ARSITEKTUR

MASUK JALUR KANTOR PMKS - - - -


CATATAN
NOTE

1 1
A002 A002
A004 A004

2 Back View 2 Back View

5350 5350

675 4000 675 675 4000 675

DISCLAIMER : The Spesifications shown in this pictures are for show suites purpose

675

675
only. For detail specifications, refer to the development design

B B NAMA PROYEK
PROJECT NAME

Left View

Left View
Right View
PMKS PT.BUM - TOOLKIT
1 A003 1 A003 ROOM
A003 2

2000

3350

2000

3350
TOOL KIT ROOM PEMBERI TUGAS
7 m² OWNER

2 2
A004 A004
PMKS - PT.BUM

A A KONSULTAN PERENCANA
DESIGN CONSULTANT
675

675
REVISI
1 Front View 1 Front View REVISION

NO TANGGAL KETERANGAN PARAF


1 A002 2 1 A002 2 NR DATE NOTE SIGNED BY

Level 1 Site
1 1 : 50
2 1 : 50 JUDUL GAMBAR SKALA
DRAWING TITLE SCALE

Layut denah 1 : 50

DIRANCANG Designer
DESIGNED
DIGAMBAR Author
DRAWN
DIPERIKSA Checker
CHECKED
DISETUJUI Approver
APPROVED
JUDUL
TITLE

TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR


DATE DRAWING CODE SHEET NUMBER TOTAL SHEET

2/26/2019
9:46:28
AM
A001
CATATAN
NOTE

1 1
A004 A004
1111

1111
DISCLAIMER : The Spesifications shown in this pictures are for show suites purpose
only. For detail specifications, refer to the development design
Level 2 Level 2
3000 3000 NAMA PROYEK
PROJECT NAME

PMKS PT.BUM - TOOLKIT


ROOM

PEMBERI TUGAS
OWNER
3000

3000
PMKS - PT.BUM

KONSULTAN PERENCANA
DESIGN CONSULTANT
1000

1000
Level 1 Level 1
0 0 REVISI
REVISION

NO TANGGAL KETERANGAN PARAF


NR DATE NOTE SIGNED BY
675 4000 675

675 4000 675

JUDUL GAMBAR SKALA


DRAWING TITLE SCALE

1 2 2 1 Tampak Depan, Belakang 1 : 50


Front View Back View
1 1 : 50
2 1 : 50
DIRANCANG
DESIGNED
Designer

DIGAMBAR Author
DRAWN
DIPERIKSA Checker
CHECKED
DISETUJUI Approver
APPROVED
JUDUL
TITLE

TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR


DATE DRAWING CODE SHEET NUMBER TOTAL SHEET

2/26/2019
9:46:31
AM
A002
CATATAN
NOTE

2 2
A004 A004

DISCLAIMER : The Spesifications shown in this pictures are for show suites purpose
only. For detail specifications, refer to the development design
Level 2 Level 2
3000 3000
NAMA PROYEK
PROJECT NAME

PMKS PT.BUM - TOOLKIT


ROOM

PEMBERI TUGAS
OWNER
3000

3000
PMKS - PT.BUM

KONSULTAN PERENCANA
DESIGN CONSULTANT
1000

Level 1 Level 1
0 0
REVISI
REVISION

NO TANGGAL KETERANGAN PARAF


NR DATE NOTE SIGNED BY
675 2000 675 675 2000 675

3350
3350

JUDUL GAMBAR SKALA


DRAWING TITLE SCALE

A B B A
Tampak Kiri, Kanan 1 : 50

Left View Right View DIRANCANG


1 1 : 50
2 1 : 50
DESIGNED
DIGAMBAR
Designer

Author
DRAWN
DIPERIKSA Checker
CHECKED
DISETUJUI Approver
APPROVED
JUDUL
TITLE

TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR


DATE DRAWING CODE SHEET NUMBER TOTAL SHEET

2/26/2019
9:46:33
AM
A003
CATATAN
NOTE

2
A004 1
A004

1111
Level 2 Level 2 DISCLAIMER : The Spesifications shown in this pictures are for show suites purpose
only. For detail specifications, refer to the development design
3000 3000

NAMA PROYEK
PROJECT NAME

PMKS PT.BUM - TOOLKIT


ROOM

PEMBERI TUGAS
3000

3000
OWNER

PMKS - PT.BUM

KONSULTAN PERENCANA
DESIGN CONSULTANT

1000
TOOL KIT ROOM
7 m²
Level 1 Level 1
0 0

REVISI
REVISION
675 2000 675
675 4000 675 NO TANGGAL KETERANGAN PARAF
NR DATE NOTE SIGNED BY

3350
5350

JUDUL GAMBAR SKALA


B A DRAWING TITLE SCALE
1 2

Potongan Toolkit Room 1 : 50


Section 1 Section 2
1 1 : 50
2 1 : 50 DIRANCANG Designer
DESIGNED
DIGAMBAR Author
DRAWN
DIPERIKSA Checker
CHECKED
DISETUJUI Approver
APPROVED
JUDUL
TITLE

TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR


DATE DRAWING CODE SHEET NUMBER TOTAL SHEET

2/26/2019
9:46:47
AM
A004
CATATAN
NOTE

DISCLAIMER : The Spesifications shown in this pictures are for show suites purpose
only. For detail specifications, refer to the development design

NAMA PROYEK
PROJECT NAME

PMKS PT.BUM - TOOLKIT


ROOM

PEMBERI TUGAS
OWNER

PMKS - PT.BUM

KONSULTAN PERENCANA
DESIGN CONSULTANT

REVISI
REVISION

NO TANGGAL KETERANGAN PARAF


NR DATE NOTE SIGNED BY

3D View 1 3D View 2
1 2
JUDUL GAMBAR SKALA
DRAWING TITLE SCALE

3D View Toolkit Room

DIRANCANG Designer
DESIGNED
DIGAMBAR Author
DRAWN
DIPERIKSA Checker
CHECKED
DISETUJUI Approver
APPROVED
JUDUL
TITLE

TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR


DATE DRAWING CODE SHEET NUMBER TOTAL SHEET

2/26/2019
9:46:54
AM
A005

You might also like