0% found this document useful (0 votes)
4K views3 pages

Material List

The document lists materials needed for an access job, including adjustable bases, steel stairs, scaffolding standards and ledgers of various lengths, scaffold tubes, decking boards, couplers, and ladders. It provides the item number, description, and length or size for each material.

Uploaded by

xyzhyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4K views3 pages

Material List

The document lists materials needed for an access job, including adjustable bases, steel stairs, scaffolding standards and ledgers of various lengths, scaffold tubes, decking boards, couplers, and ladders. It provides the item number, description, and length or size for each material.

Uploaded by

xyzhyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

MATERIAL LIST FOR ACCESS

LENGTH: JOB NO.


WIDTH: DRAWING NO.
HEIGHT: GRID:
ITEM DESCRIPTION
ACCESS
1 ADJUSTABLE BASE JACK
2 STEEL STAIR
3 3.00 M STANDARD
4 2.50 M STANDARD
5 2.00 M STANDARD
6 1.80 M STANDARD
7 1.50 M STANDARD
8 1.30 M STANDARD
9 1.00 M STANDARD
10 2.50 M LEDGER
11 1.80 M LEDGER
12 1.60 M LEDGER
13 1.30 M LEDGER
14 1.00 M LEDGER
15 0.90 M LEGER
16 0.60 M LEDGER
17 0.30 M LEDGER
18 2.50 M INT. TRANSOM
19 1.80 M INT. TRANSOM
20 1.30 M INT. TRANSOM
21 SPIGOT CONNECTOR
BRACING
22 6.00 M SCAFFOLD TUBE
23 5.00 M SCAFFOLD TUBE
24 4.00 M SCAFFOLD TUBE
25 3.00 M SCAFFOLD TUBE
26 3.50 M SCAFFOLD TUBE
27 3.00 M SCAFFOLD TUBE
28 2.50 M SCAFFOLD TUBE
29 2.00 M SCAFFOLD TUBE
30 1.50 M SCAFFOLD TUBE
31 1.00 M SCAFFOLD TUBE
32 DOUBLE COUPLER
33 SWIVEL COUPLER
DECKING
33 4.00 M SCAFFOLD BOARD
34 3.00 M SCAFFOLD BOARD
35 2.00 M SCAFFOLD BOARD
36 1.50 M SCAFFOLD BOARD
37 1.00 M SCAFFOLD BOARD
38 SINGLE COUPLER
39 BRC
40 6.00M ALUM. LADDER
41 4.00M ALUM. LADDER
42 3.00M ALUM. LADDER
43 LADDER CLAMP
CONTRACTOR: ESTIMATED BY: SHEET NO.
MDS
PROJECT TITLE: DATE:
REV. NO.
DRAWING TITLE: REVISED BY:

NOTE:
NOTE:
MATERIAL LIST FOR SLAB
FLOOR LVL :
SLAB THK: JOB NO.
SOFFIT HT: DRAWING NO.
TOTAL AREA GRID:
ITEM DESCRIPTION
SUPPORT
1 DROPHEAD
2 ADOPTOR/SOCKET BASE
3 ADJ.FORKHEAD
4 ADJ.BASE JACK
5 PLAIN BASE
6 CANT. FRAME 1.50 M
7 CANT. FRAME 1.00 M
8 3.00 M STANDARD
9 2.50 M STANDARD
10 2.00 M STANDARD
11 1.80 M STANDARD
12 1.50 M STANDARD
13 1.30 M STANDARD
14 1.00 M STANDARD
15 2.50 M LEDGER
16 1.80 M LEDGER
17 1.60 M LEDGER
18 1.30 M LEDGER
19 1.00 M LEDGER
20 0.90 M LEGER
21 0.60 M LEDGER
22 0.30 M LEDGER
23 2.50 M INT. TRANSOM
24 1.80 M INT. TRANSOM
25 1.30 M INT. TRANSOM
26 SPIGOT CONNECTOR
27 4.00 M PROP JACK
BRACING
28 6.00 M SCAFFOLD TUBE
29 5.00 M SCAFFOLD TUBE
30 4.00 M SCAFFOLD TUBE
31 3.00 M SCAFFOLD TUBE
32 3.50 M SCAFFOLD TUBE
33 3.00 M SCAFFOLD TUBE
34 2.50 M SCAFFOLD TUBE
35 2.00 M SCAFFOLD TUBE
36 1.50 M SCAFFOLD TUBE
37 1.00 M SCAFFOLD TUBE
38 DOUBLE COUPLER
39 SWIVEL COUPLER
DECKING
40 2.50 M DECKING BEAM
41 1.80 M DECKING BEAM
42 1.20 M DECKING BEAM
43 1.50 M INFILL BEAM
44 1.20 M INFILL BEAM
45 0.90M INFILL BEAM
46 0.50M INFILL BEAM
CONTRACTOR: ESTIMATED BY: SHEET NO.
MDS
PROJECT TITLE: DATE:
REV. NO.
DRAWING TITLE: REVISED BY:

NOTE:

You might also like