NCP Rate File
NCP Rate File
SCHEDULE OF RATES
FOR
BUILDING AND IRRIGATION WORKS
AND
MATERIAL TESTING
NORTH CENTRAL PROVINCE
N WORKS
G
VINCE
ment
atha,
CEng., MIE(SL), M-
Eng. (Ms.) D.L.B.P. Wijesekara
* 5068 : Director (Designs, Consultancy &
BSc. Eng., MSc.(IWRM), CEng., MIE(SL), M-4492 Quality Control)
(Buildings)
l Director - Irrigation
- Health Department
- School works
al Engineer-Anuradhapura
al Engineer-Medawachchiya
Engineer (Special Projects)
- Provincial Irrigation
ent
al Engineer-Mahailuppallama
- Material Testing
al Engineer - Polonnaruwa
- Other Departments
cal Engineer
- Building Services
- Structural Designs
- Provincial Irrigation
ent
- Structural Designs
Engineer
al Engineer-Kekirawa
Building Works
Irrigation Works
Material Testing
ation
Second Third
Description First Floor
Floor Floor
Concrete Work 3% 5% 7%
Formwork 3% 5% 7%
Reinforcement 2.5% 5% 7.5%
Brickwork 5% 7% 10%
Calicut Tile Roof 3% 6% 9%
Asbestos Roof 3% 5% 7%
Zink Aluminium Roof 3% 5% 7%
Roof Plumbing 3% 5% 7%
Ceiling 3% 5% 7%
Plastering 5% 10% 15%
Wall Tiling 2% 4% 6%
Floor Tiling 2% 4% 6%
PROVINCIAL ENGINEERING DEPARTMENT 7
Painting 3% 6% 9%
12 0.888 1126 11.84 8.880 7.104 5.920 5.074 4.440 3.947 3.552 3.229 2.960
16 1.579 633 21.05 15.79 12.63 10.53 9.023 7.895 7.018 6.316 5.742 5.263
20 2.466 406 32.88 24.66 19.73 16.44 14.09 12.33 10.96 9.864 8.967 8.220
25 3.854 259 51.39 38.54 30.83 25.69 22.02 19.27 17.13 15.42 14.01 12.85
32 6.313 158 63.13 50.5 42.09 36.07 31.57 28.06 25.25 22.96 21.04
40 9.864 101 78.91 65.76 56.37 49.32 43.84 39.46 35.87 32.88
All the rates given in this schedule include 10% for overhead and 10% for profit on the basic
cost. The breakdown of the overhead is given below.
Description %
In the case of estimates above 10 million, it may be required to include items which are not
in the above list under the Preliminaries as items or provisional sum.
Page
A. DEMOLISHER 15-17
C. MASON 19
D. CONCRETOR 20-21
E. FORMWORK 22
F. REINFORCEMENT 23
G. BRICKLAYER 24
H. PLASTERER 25-26
I. PAVIOR 27-30
J. ROOFER 30-37
L. IRONWORK 41-43
N. PLUMBER 46-50
O. DRAINLAYER 51-52
Q. MISCELLANEOUS 58
A. JUNGLE CLEARING 66
B. STRIPPING 66
C. EARTHWORK 66-67
E. DESILTING 69
F. TURFING 70
G. GRAVELLING 70
H. CONCRETE 71
I. RAINFORCEMENT 71
J. FORMWORK 71
K. RUBBLE MASONARY 71
N. ROCK EXCAVATION 73
(MATERIAL TESTING)
1 SOIL TESTING 76
2 CONCRETE TESTING 76
3 AGGREGATE TESTING 76
5 CEMENT TESTING 77
7 ALUMINIUM TESTING 77
65 - 74
75 - 77
A - DEMOLISHER
Rates for Demolisher shall include for:
(a) Scaffolding, shoring and shores required.
(b) Protection of site personal, plant and equipment by taking precautions against
uncontrolled collapse, electrical hazards and fire or explosion risks.
(c) 31/6538
A-11 Door or window sash only, up to 40 sqft. removed from no. 223.00
existing walls and stacked.
A-12 Door or window sash only, over 40 sqft. removed from no. 335.00
existing walls and stacked.
A-13 Down pipes, 4'' to 6'', old or decayed, removed from existing lm 52.00
building and stacked.
A-14 Drains demolished and debris cleared within the site. lm 102.00
A-15 Fence uprooted, barbed wire rolled up and all materials lm 213.00
stacked (Length of fencing to be measured)
A-16 Floors brick paved, demolished and debris cleared away sqm 126.00
within the site.
A-17 Gate sash removed and stacked after demolishing cement no. 1,560.00
concrete blocks or removing posts and separating pintos
(demolishing brickwork where necessary paid for separately)
A-23 Cement, lime plastering chipped and debris cleared away. sqm 79.00
A-24 Rendering, cement chipped and debris cleared away from sqm 189.00
brick walls and floors within the site.
A-25 Rendering, cement chipped and debris cleared away from sqm 284.00
cement concrete floors and walls within the site.
A-26 Removing of existing roof (tiles, asbestos sheets or GI sheets) sqm 236.00
with timber frame, stacking usable material and clearing
debris in single storied building.
A-27 Removing of existing roof (tiles, asbestos sheets or GI sheets) sqm 316.00
with timber frame, stacking usable material and clearing
debris in 2 storied building.
A-28 Removing of existing roof (tiles, asbestos sheets or GI sheets) sqm 402.00
with timber frame stacking usable material and clearing
debris in 3 storied and above
A-29 Rubble masonry in cement demolished, rubble stacked and cum 1,774.00
debris cleared within the site.
A-30 Tiles, glazed demolished and debris cleared within the site. sqm 336.00
A-31 Tiles Calicut or half round, removed from roof of single sqm 86.00
storied buildings and stacked at site.
A-32 Tiles Calicut or half round removed from roof of 2 storied sqm 130.00
building and stacked at site.
A-33 Tiles Calicut or half round, removed from roofs of 3 storied sqm 173.00
and above buildings and stacked at site.
A-34 Waterproof Treatment of hot bitumen taken off from flat roof sqm 336.00
and debris cleared away.
A-35 Ceiling asbestos removed including timber framework sqm 399.00
stacking usable materials and debris cleared away in single
storied building.
A-39 Cement plastering in soffit chipped and debris cleared away. sqm 242.00
A-40 Roof trusses span up to 30' 0" removed from roof and no. 4,820.00
stacked.
A-41 Transport of debris to a place where 1-5 km away from the site cum 551.00
as directed by the Engineer including loading.
A-42 Transport of debris to a place where 5-10 km away from the cum 636.00
site as directed by the Engineer including loading.
A-43 Basin, sink, or urinals including all fittings removed and wall no. 1,740.00
made good
A-44 Water Closet or Squatting pan, removed, sewer connection no. 2,590.00
plugged and floor made good
B-2 Excavation for foundation in any material except rock cum 799.00
requiring blasting, part return fill in and ram, and surplus
dispose within the site as directed.
B-3 Excavation in any material except rock requiring blasting cum 587.00
including transporting up to 400m, depositing and leveling.
B-4 Excavation in trenches for walls and column pits in soft cum 1,158.00
disintegrated rock (not requiring blasting) up to a depth of
1.5m and depositing excavated materials to distance not
exceeding 10m.
B-5 Excavation in trenches for walls and column pits in hard rock cum 271.00
requiring blasting up to a depth of 1.5m and depositing
excavated materials to distance not exceeding 10m.
B-6 Filling under floors with gravel or other approved quality of cum 1,061.00
filling, spread, watered and compacted in 150mm layers as
per Engineer's instructions. (material available at site)
B-7 Filling under floors with gravel or other approved quality of cum 1,913.00
filling, spread, watered and compacted in 150mm layers as per
Engineer's instructions.(material not available at site)
B-9 Drains, earth in any soil except rock requiring blasting cut to cum 689.00
gradient and shaped as directed, soil deposited within site.
C - MASON
C-2 150-225mm Random Rubble Masonry in cement mortar 1:5 cum 13,894.00
up to 1 cube
Block Masonry
C-3 150mm thick Hollow block work in cement and sand mortar sqm 1,995.00
1:5 with 400x150x200mm blocks (Cavities unfilled)
C-4 100mm thick Hollow block work in cement and sand mortar sqm 1,356.00
1:5 with 400x100x200mm blocks (Cavities unfilled)
C-5 150mm thick solid block work in cement and sand mortar 1:5 sqm 2,071.00
with 400x150x200mm blocks
C-6 100mm thick solid block work in cement and sand mortar 1:5 sqm 1,432.00
with 400x100x200mm blocks
D - CONCRETOR
D-4 Cement concrete grade C16/20 in column foundation, column cum 18,952.00
shaft and plinth beams using mixer and vibrator - up to first
floor level
D-5 Cement concrete grade C16/20 in slab, beams and stair case cum 20,054.00
using mixer and vibrator - up to first floor level
D-7 Cement concrete grade C20/25 in column shaft using mixer cum 21,557.00
and vibrator - up to second floor level
D-8 Cement concrete grade C20/25 in column shaft using mixer cum 23,260.00
and vibrator - up to third floor level
D-9 Cement concrete grade C20/25 in slab, beams and stair case cum 21,741.00
using mixer and vibrator - up to first floor level
D-13 Cement concrete grade C16/20 in lintels (reinforcement and cum 18,959.00
shuttering paid separately) - up to second floor level
D-14 Cement concrete grade C16/20 in lintels (reinforcement and cum 20,663.00
shuttering paid separately) - up to third floor level
D-15 Lintel, cement concrete grade C16/20, 112x150mm with 2 lm 1,417.00
nos. 12 mm dia. tor steel bars and form work - up to first
floor level
D-16 Lintel, cement concrete grade C16/20, 112x150mm with 2 lm 1,476.00
nos. 12 mm dia. tor steel bars and form work - up to second
floor level
D-22 75mm thick worktop in grade C16/20 cement concrete with sqm 4,339.00
10mm tor steel at 150mm c/c both ways including formwork
and soffit plastering
E - FORMWORK
E-3 12mm Plywood shuttering for slab, beams and staircase sqm 1,777.00
including dismantling - up to third floor level
E-4 12mm Plywood shuttering for column shaft including sqm 2,042.00
dismantling - up to first floor level
E-5 12mm Plywood shuttering for column shaft including sqm 2,116.00
dismantling - up to second floor level
E-6 12mm Plywood shuttering for column shaft including sqm 2,165.00
dismantling - up to third floor level
E-7 Shuttering for plinth beams and lintels including dismantling - sqm 1,228.00
up to first floor level
E-8 Shuttering for lintels including dismantling - up to second sqm 1,453.00
floor level
E-9 Shuttering for lintels including dismantling - up to third floor sqm 1,474.00
level
E-10 Class III timber shuttering for small works including sqm 790.00
dismantling
F- REINFORCEMENT
Instructions
(a) Inevitable laps should be measured.
(b) Unless otherwise specified laps to be 50 times the diameter of the bar.
(c) Preparation, supplying & binding of cover blocks such that specified cover is
maintained at outer-most rod.
(d) Reinforcements should be CN, GTB or LANWA. Tensile strength of reinforcements
should be tested if requested, from the institution where specified by the Engineer
with contractor's expense.
(e) Some trade names are used only for the purpose of indicating the minimum level of
quality and standards.
F-2 Tor steel rods reinforcing in columns, beams, slabs and M.Ton 230,574.00
lintels up to first floor level bent to shape laid in position and
tied with G.I. Wire as directed
F-3 Tor steel rods reinforcing in columns, beams, slabs and M.Ton 240,294.00
lintels up to second floor level bent to shape laid in position
and tied with G.I. Wire as directed
F-4 Tor steel rods reinforcing in columns, beams, slabs and M.Ton 246,774.00
lintels up to third floor level bent to shape laid in position
and tied with G.I. Wire as directed
F-5 Mild steel rods, shape into stirrups and laid in position and M.Ton 229,614.00
tied with GI wires as directed - up to first floor level
F-6 Mild steel rods, shape into stirrups and laid in position and M.Ton 239,334.00
tied with GI wires as directed - up to second floor level
F-7 Mild steel rod, shape into stirrups and laid in position and tied M.Ton 245,814.00
with GI wires as directed - up to third floor level
G - BRICK LAYER
G-6 Brick 112mm thick in cement - sand mortar 1:5 (up to second sqm 2,149.00
floor level)
G-7 Brick 112mm thick in cement - sand mortar 1:5 (up to third sqm 2,668.00
floor level)
G-8 Coping, brick in cement - sand mortar 1:5, weathered and lm 1,237.00
throated on 112mm walls, cement rendered with 12mm thick
1:3 mix complete
G-9 Coping, brick in cement - sand mortar 1:5, weathered and lm 1,670.00
throated on 225mm walls, cement rendered with 12mm thick
1:3 mix complete
G-10 Widening R.C.C Column by placing one brick on both side lm 886.00
of column to size 450x225mm
H- PLASTERER
H-2 20mm thick plinth plaster in 1:3 cement - sand mortar sqm 911.00
finished smooth with neat cement floating.
H-3 20mm thick plinth plaster in 1:3cement - sand mortar finished sqm 946.00
smooth with red cement floating.
H-4 Cement plastering with 1:5 mix, 15mm thick finished semi sqm 599.00
rough in external walls - up to first floor level
H-5 Cement plastering with 1:5 mix, 15mm thick finished semi sqm 657.00
rough in external walls - up to second floor level
H-6 Cement plastering with 1:5 mix, 15mm thick finished semi sqm 695.00
rough in external walls - up to third floor level
H-7 Cement plaster with 1:5 mix, 15mm thick finished smooth sqm 796.00
with skim coat in internal walls - up to first floor level
H-8 Cement plaster with 1:5 mix, 15mm thick finished smooth sqm 886.00
with skim coat in internal walls - up to second floor level
H-9 Cement plaster with 1:5 mix, 15mm thick finished smooth sqm 936.00
with skim coat in internal walls - up to third floor level
H-10 Cement lime plaster with 1:1:5 mix, 15mm thick finished sqm 802.00
smooth with lime putty in internal walls - up to first floor level
H-11 Cement lime plaster with 1:1:5 mix, 15mm thick finished sqm 883.00
smooth with lime putty in internal walls - up to second floor
level
H-12 Cement lime plaster with 1:1:5 mix, 15mm thick finished sqm 936.00
smooth with lime putty in internal walls - up to third floor
level
H-14 Finish smooth soffit of slab by applying skim coat - up to first sqm 331.00
floor level
H-15 Finish smooth soffit of slab by applying skim coat - up to sqm 355.00
second level
H-16 Finish smooth soffit of slab by applying skim coat - up to third sqm 371.00
floor level
H-17 15mm thick plaster to R.C.C. columns, beams and soffit of sqm 919.00
slab in cement - sand 1:3 mix including floating with lime
putty - up to first floor level
H-18 15mm thick plaster to R.C.C. columns, beams and soffit of sqm 1,027.00
slab in cement - sand 1:3 mix including floating with lime
putty - up to second floor level
H-19 15mm thick plaster to R.C.C. columns, beams and soffit of sqm 1,099.00
slab in cement - sand 1:3 mix including floating with lime
putty - up to third floor level
H-20 15mm thick semi rough finished plaster to R.C.C. columns, sqm 900.00
beams and soffit of slab in cement - sand 1:3 mix - up to first
floor level
H-21 15mm thick semi rough finished plaster to R.C.C. columns, sqm 1,007.00
beams and soffit of slab in cement - sand 1:3 mix - up to
second floor level
H-22 15mm thick semi rough finished plaster to R.C.C. columns, sqm 1,079.00
beams and soffit of slab in cement - sand 1:3 mix - up to third
floor level
H-23 15mm thick plastering to wall in cement- sand 1:3 mix sqm 621.00
including cement floating
H-24 Cracks in walls plastered in cement - sand 1:3 mix after lm 125.00
chipping to 50-100mm wide
I - PAVIOR
I -2 Rendering cement 12mm, in 1:5 cement and sand on existing sqm 630.00
concrete, finished smooth
I -3 Rendering cement 12mm, in 1:5 cement and sand on existing sqm 781.00
concrete, floating coat using red cement finished smooth
I -4 Rendering cement 12mm, in 1:5 cement and sand on existing sqm 563.00
concrete, finished rough
I -5 Tile glazed 200x200mm, Sri Lankan made of approved type sqm 3,533.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2,
with steel tile beadings on top and edges - Ground floor
I -6 Tile glazed 200x200mm, Sri Lankan made of approved type sqm 3,583.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2,
with steel tile beadings on top and edges - First floor
I -7 Tile glazed 200x200mm, Sri Lankan made of approved type sqm 3,617.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2,
with steel tile beadings on top and edges - Second floor
I -8 Tile glazed, 300x200mm, Sri Lankan made of approved type sqm 3,890.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2
with steel tile beadings on top and edges - Ground floor
I -10 Tile glazed, 300x200mm, Sri Lankan made of approved type sqm 3,974.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2
with steel tile beadings on top and edges - Second floor
I -11 Tile glazed, 300x600mm, Sri Lankan made of approved type sqm 4,650.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2
with steel tile beadings on top and edges - Ground floor
I -12 Tile glazed, 300x600mm, Sri Lankan made of approved type sqm 4,700.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2
with steel tile beadings on top and edges - First floor
I -13 Tile glazed, 300x600mm, Sri Lankan made of approved type sqm 4,734.00
and colour, with all specials, supplied and fixed to wall
including raking plaster and bedding in cement mortar 1:2
with steel tile beadings on top and edges - Second floor
I -14 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of sqm 3,340.00
approved type and colour supplied and laid including plaster
bedding 1:2 with skirting and steel tile beadings on top -
Ground floor
I -15 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of sqm 3,390.00
approved type and colour supplied and laid including plaster
bedding 1:2 with skirting and steel tile beadings on top - First
floor
I -16 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of sqm 3,424.00
approved type and colour supplied and laid including plaster
bedding 1:2 with skirting and steel tile beadings on top -
Second floor
I -17 Floor tile, 200x200mm, Sri Lankan made, nonskid pattern of sqm 3,385.00
approved type and colour supplied and laid including plaster
bedding 1:2 with skirting and steel tile beadings on top -
Ground floor
I -18 Floor tile, 200x200mm, Sri Lankan made, nonskid pattern of sqm 3,436.00
approved type and colour supplied and laid including plaster
bedding 1:2 with skirting and steel tile beadings on top - First
floor
I -20 Homogeneous Floor tile, 300x300mm, Sri Lankan made, sqm 3,766.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Ground floor
I -21 Homogeneous Floor tile, 300x300mm, Sri Lankan made, sqm 3,817.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - First floor
I -22 Homogeneous Floor tile, 300x300mm, Sri Lankan made, sqm 3,850.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Second floor
I -23 Homogeneous Floor tile, 400x400mm, Sri Lankan made, sqm 4,317.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Ground floor
I -24 Homogeneous Floor tile, 400x400mm, Sri Lankan made, sqm 4,367.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - First floor
I -25 Homogeneous Floor tile, 400x400mm, Sri Lankan made, sqm 4,401.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Second floor
I -26 Homogeneous Floor tile, 600x600mm, Sri Lankan made, sqm 5,187.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Ground floor
I -27 Homogeneous Floor tile, 600x600mm, Sri Lankan made, sqm 5,238.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - First floor
I -28 Homogeneous Floor tile, 600x600mm, Sri Lankan made, sqm 5,271.00
nonskid pattern of approved type and colour supplied and laid
including plaster bedding 1:2 with skirting and steel tile
beadings on top - Second floor
I -29 Floor tiles Tera cota of approved type laid on existing sqm 2,440.00
concrete floor including plaster bed in 1:2 cement and sand
I -32 Skirting 25x100mm in 1:5, projected or flush with walls and lm 262.00
including forming groove
I -33 Skirting 25x100 in 1:5, projected or flush with walls and lm 344.00
including forming groove finished with red cement
I -34 Floor ramp 75mm thick, 750mm width cement concrete lm 2,184.00
1:21/2:5(25mm) on gauge 750 polythene layer and cement
rendered, expansion joints filled with 1:2 bitumen sand
including filling and compacting gravel on the base and
providing 150x225mm curb at the edge finished smooth with
red cement floating
I -35 225mm width surface drain joined to the existing ramp with lm 1,804.00
75mm thick 1:2 1/2:5(25mm) concrete base, side wall of
112mm brick work in 1:5 cement sand rendering in 1:5 match
to existing floor/ramp complete with expansion joints and
necessary excavation
I -36 Laying of inter locking paving blocks of compressive strength sqm 2,871.00
of 25 N/mm2 (28 day) on 75mm thick sand bed including site
preparation, trimming, leveling and compacting with plate
compactor as per instructions
J - ROOFER
Rates for Roof work shall include for:
(a) Hoisting and placing roofing materials in position.
(b) Laps, straight cutting and waste.
(c) Galvanized iron “J” bolts, nuts, limpets and bituminous felt washers, nails screw
clips, rivets straps and the like.
(d) Rafter hooks fixing rafters to the wall.
Rates for joinery work shall include for:
(a) Framing together all works in accordance with the best practices.
(b) Nails Screws, Glue, plugs etc.
(c) Priming backs before fixing.
(d) Rawl plugs, brass screws etc.
(e) Drilling and making goods.
Instructions
(a) Approval for all sizes of timber should be taken from the Engineer before using.
(b) All the timber used to be treated with wood preservative to the specifications.
(c) Ceiling sheets to be painted with one coat of acetic filler and two coats of emulsion
(d) paints.
All the beading to be painted with one coat of wood primer and two coats of enamel
paints.
(e) For exposed rafter roofs, timber should be well planed and varnished. Timber sizes
indicated in the description are the sizes before planning.
J-2 Calicut tile roof (sloping to four directions) on imported sqm 4,420.00
treated timber framework including 100x100mm struts,
50x175mm ridge, 50x150mm hip and valley rafters,
100x75mm wall plate, 75x125mm purling, 50x100mm rafters,
50x25mm reapers including nuts and bolts and, prepare and
apply one coat of wood preservative (black) to structural
timber work (Timber beams measured and paid separately)
J-3 Zink Alum. Sheet- Corrugated Type -colour- (Thickness sqm. 1,419.00
0.47 mm, strength 550Mpa) roof on existing framework
including necessary fasteners as per Manufacturer's
Specifications
J-5 Zink Alum. sheet -Textured Type -colour- (Thickness 0.47 sqm. 1,749.00
mm, strength 550Mpa) roof on existing framework
including necessary fasteners as per Manufacturer's
Specifications
J-6 Asbestos corrugated sheet fixed on existing frame with sqm 1,563.00
necessary bolt and nuts (single storied building)
J-7 Asbestos corrugated sheet fixed on existing roof with sqm 1,603.00
necessary bolt and nuts (2 storied building)
Ceiling including Timber frame
J-8 Asbestos ceiling -to existing rafters
Asbestos ceiling fixed to existing rafters, with 50x50mm sqm 2,646.00
imported treated timber framework, interior beading
38x12mm and outer molding 38x38mm including prepare and
apply one coat of wood preservative to structural timber work
and application of one coat of Alkali resistant primer and two
coats of Emulsion paint to ceiling sheets including necessary
nails and screws.
J-11
Lunumidella slope ceiling under existing rafters with outer sqm 2,626.00
molding to the accepted design (All the beading and
Lunumidella planks should be painted with one coat of wood
sealer mixing with approved colour die and two coats of
varnish)
J-14 Corrugated asbestos sheet roof with exposed rafter sqm 5,592.00
Lunumidella ceiling on 50x100mm imported treated timber
rafters at 300mm c/c and 50x50mm imported treated timber
bearer, with necessary coach screws and limpet washers,
including prepare and apply one coat of wood preservative and
varnish to structural timber work, including touching up cut
end etc. after fixing - Lunumidella planks should be painted
with one coat of wood sealer mixing with approved colour die
and two coats of varnish (Timber used other than those
mentioned above measured separately)
J-15 Corrugated asbestos sheet roof with exposed rafter sqm 5,334.00
plywood (9mm) ceiling on 50x100 imported treated timber
rafters at 600mm c/c and 50x50 imported treated timber
bearer at 600mm c/c with necessary coach screws and limpet
washers, and 25x6mm beading prepare and apply one coat of
wood preservative (clear) to structural timber work and
painting plywood sheets with two coats of varnish including
touching up cut end etc. after fixing (Timber used other than
those mentioned above measured separately)
Ridging
J-18 Ridging, Calicut pattern bedded in cement and sand lime lm 735.00
mortar 1:1:4 . Colour to match tiles
J-19 Ridging with asbestos bedded in cement and sand mortar 1:4 lm 1,109.00
J-20 Supply and fix Zn-Al ridging (Colour) - 0.47 mm thick with lm 1,581.00
necessary bolts and nuts (Corrugated Type)
J-21 Supply and fix Zn-Al ridging (Non-colour) - 0.47 mm thick lm 669.00
with necessary bolts and nuts (Corrugated Type)
J-22 Supply and fix Zn-Al ridging (Colour) - 0.47 mm thick with lm 2,109.00
necessary bolts and nuts (Textured Type)
Gutters & Downpipes
J-23 Eaves gutter 150mm, rectangular, PVC fixed with PVC lm 558.00
brackets with all necessary specials
J-24 Down pipes, PVC fixed with wooden plug to wall including lm 666.00
all necessary specials
J-25 Supply and fix Zn-Al eave gutter (colour) - size 130x145mm, lm 1,519.00
0.47 mm thick with necessary bolts and nuts
J-26 Supply and fix Zn-Al eave gutter (non-colour) - size lm 1,414.00
130x145mm, 0.47 mm thick with necessary bolts and nuts
J-27 Supply and fix Zn-Al down pipes (colour) - size 100x100mm, lm 1,243.00
0.47 mm thick to wall with necessary bracket clips
J-28 Supply and fix Zn-Al down pipes (non-colour) - size lm 1,138.00
100x100mm, 0.47 mm thick to wall with necessary bracket
clips
Insulation Foil
J-38 Furnishing and laying 3mm thick single side Aluminium foil sqm 174.00
J-39 Furnishing and laying 3mm thick Double side Aluminium foil sqm 243.00
J-40 Furnishing and laying gauge 17, 75x75mm Galvanized roof sqm 310.00
mesh
Roof Timber
J-41 Furnishing and fixing of 50x150mm Imported treated timber lm 1,243.00
and apply one coat of wood preservative
J-42 Furnishing and fixing of 75x100mm Imported treated timber lm 1,243.00
and apply one coat of wood preservative
Maintenance
J-52 Corrugated G.I. sheet 24 BWG, fixed to roof, walls or fence sqm 685.00
with necessary cup washers and hook bolts or screws (timber
framing paid for separately)
J-53 Leaks (up to 5 in numbers) in roofs of single storied building no. 240.00
made good
J-54 Leaks (above 5 in numbers) in roof of single storied building no. 60.00
made good
J-55 Leaks (up to 5 in numbers) in roofs of two or above storied no. 300.00
building made good
J-56 Leaks (above 5 in numbers) in roof of two or above storied no. 120.00
building made good
J-57 Leaks in corrugated sheet roof made good with bitumen no. 320.00
washers and G.I. bolts and nuts
J-58 Ridging, Calicut pattern removed and re-laid in cement mortar lm 604.00
1:1:4 and colour to match tile
J-59 Tiles, Calicut pattern, flat supplied and laid up to 25 tiles in no. 71.00
single storied building
J-60 Tiles, Calicut pattern, flat supplied and laid above 25 tiles and no. 53.00
up to 100 in single storied building
J-61 Tiles Calicut pattern supplied and laid on roofs - single storied sqm 626.00
building
J-62 Tiles Calicut pattern supplied and laid on roofs - two storied sqm 704.00
building
J-64 Roof covering with corrugated asbestos sheets available at site sqm 140.00
on existing timber frame with necessary roofing screws and
washers.
J-65 Furnishing and fixing of available timber purlins or rafters for lm 105.00
the roof including necessary screws and nails and, application
of one coat of wood preservative.
NO DESCRIPTION METRIC
UNIT RATE
K-1 Supply and fix Front door, 95x70mm frame and 28mm thick sqm 13,063.00
sash with designs in Teak timber (Fit panels) complete with
brass furniture, 2 nos. 150mm barrel bolts and 3 nos. hinges
including preparation of surface and application of two coats
of Varnish
K-2 Door or Window, ledge braced and battened with grooved and sqm 12,718.00
tongued joints, 95x70mm frame and 19mm to 22mm thick
sashes in class 1 timber complete with brass furniture 2 nos.
150mm barrel bolts and 3 nos. hinges including preparation of
surface and application of two coats of Varnish
K-3 Door or window glazed and / or paneled with 95x70mm sqm 16,732.00
frame and 28mm thick sash in class 1 timber fixed complete
with brass furniture, 2 nos. 150mm barrel bolts and 6 nos.
hinges including preparation of surface and application of two
coats of Varnish - Double sash
K-4 Supply and fix Plywood door (Engineer Approved) with sqm 11,567.00
95x70mm frame and complete with brass furniture, 2 nos.
150mm barrel bolts and 3 nos. hinges including preparation
of surface and application of two coats of Varnish
K-5 Supply and fix PVC door with frame complete with 3 hinges sqm 7,177.00
and lock/barrel bolt
NO DESCRIPTION METRIC
UNIT RATE
K-6 Door or window glassed with 95x70mm frame comprising 2 sqm 9,996.00
no. of openable sashes with100x28mm outer frame and non-
openable 125x28mm timber strips area complete with brass
mongers including preparation of surface and application of
two coats of varnish
K-7 Door or windows glazed and / or paneled, sash only 28mm sqm 11,051.00
thick in class 1 timber with brass furniture, 2 nos. 150mm
barrel bolts and 3 nos. hinges including preparation of surface
and application of two coats of Varnish
K-8 Supplied and fixed plywood door sash 28mm thick (Engineer sqm 6,521.00
Approved) to the existing frame complete with brass furniture
2 nos. 150mm barrel bolts and 3 nos. hinges including
preparation of surface and application of two coats of Varnish
K-9 Supply and fix door sash 19 to 22mm thick, ledge braced and sqm 8,823.00
battened with grooved and tongued joints in class 1 timber
complete with brass furniture 2 nos. 6" barrel bolts and 3 nos.
hinges including preparation of surface and application of two
coats of Varnish
K-10 Door frame 95x70mm class 1 timber supplied and fixed in sqm 3,852.00
position
K-11 Door or window sash, removing, easing and re-fixing no. 636.00
K-16 Door sash, swing, removed and re-fixed in new position no. 851.00
K-17 Louver blade 9mm thick in class 1 timber 100mm wide lm 518.00
K-18 Louver blade 9mm thick in class 1 timber 150mm wide lm 804.00
K-19 Wicket gate at entrance 1050x900mm double hinge fittings sqm 11,502.00
to include 2 pairs of 25x63mm butt hinges and 100mm iron
barrel bolts post and sash with 40x40x5mm angle iron and
50mm SWG 10 welded mesh complete with 2 coats of
anticorrosive paint
K-20 Glass panes 3 mm thick supplied and fixed with class 1 timber sqm 2,668.00
beading
NO DESCRIPTION METRIC
UNIT RATE
K-21 Glass panes 5 mm thick supplied and fixed with class 1 timber sqm 2,959.00
beading
K-22 Beading or filleting for glass panes fixed complete with brass lm 72.00
panel pins (with class 1 timber)
K-23 Door or window frame altered, existing, rebate fillets using no. 4,397.00
class 1 timber with screws and sash re-hung on opposite side
K-24 Supplying and fix mortise lock - Union 678-24-95CH or no. 6,621.00
equivalent, with 1 years guarantee. (guarantee certificate
should be submitted with bills)
K-25 Supplying and fix switch lock - Bird or equivalent no. 2,721.00
Iron furniture
K-26 Supply and fix barrel bolt 100mm - Iron with brass screws no. 295.00
K-27 Supply and fix barrel bolt 75mm - Iron with brass screws no. 308.00
K-28 Supply and fix Hasp and staples 100mm - Iron with brass no. 209.00
screws
K-29 Supply and fix Hasp and staples 150mm - Iron with brass no. 409.00
screws
K-30 Supply and fix Casement fasteners - Iron with brass screws no. 295.00
K-31 Supply and fix Casement stays, 250mm - Iron heavy quality no. 328.00
with brass screws
K-32 Supply and fix door closer approved type with brass screws no. 3,925.00
K-33 Supply and fix Butt Hinge, 100mm - Iron with brass screws no. 643.00
K-34 Supply and fix Butt Hinge, 125mm - Iron with brass screws no. 711.00
Brass Furniture
K-35 Supply and fix Barrel bolts 150mm - brass, heavy quality with no. 715.00
brass screws
K-36 Supply and fix Casement fasteners -brass with mortise plate, no. 505.00
heavy quality with brass screws
K-37 Supply and fix Casement stays, 250mm - brass heavy quality no. 446.00
with brass screws
K-38 Supply and fix Butt Hinge, 100mm - brass heavy quality with no. 836.00
brass screws
K-39 Bolts, casement fasteners or stays removed and refixed no. 118.00
including making good to holes in frames and sashes
L - IRON WORK
L-2 Iron grill with 6 mm mild steel rods welded diagonally at 100 sqm 6,101.00
mm cts. both way and outer frame with 20x6 mm flat iron
fabricated and fixed complete including two coats of
anticorrosive paint and enamel paint.
L-3 Supply and fix Iron grill with 30x6 mm flat iron outer frame sqm 7,467.00
and horizontal bracing at 300mm intervals complete with
8mm mild steel rods vertically at 75mm c/c including two
coats of anticorrosive paint and enamel paint.
L-4 50x50mm G.I weld mesh fixed to existing frame with staple sqm 1,775.00
including painting (Beading paid separately)
L-5 50x50mm G.I weld mesh supplied and fixed to window frame sqm 4,551.00
with 50x6mm class 1 timber beadings and, painted weld mesh
with 2 coats of anticorrosive paint and beading with primer
coat and 2 coats of enamel paint including making opening for
bolts and casement stays
L-6 50x50mm G.I weld mesh fixed to 40x40x5mm angle iron sqm 5,057.00
frame fabricated and fixed to wall with rawl plugs and screws
including painting with enamel paint and anticorrosive paint
L-7 Supply and fix gate with Zink Alum gate clad sheet (colour) sqm 6,919.00
with 30mm heavy duty GI pipe frame work, 20mm heavy duty
squire tube bitterns and vertical members at the top, including
application of two coats of anticorrosive primer and finishing
coat of enamel paint complete with stap hinges, hasp and
staples as per given design
L-8 Supply and place in position steel roof truss (WEB) - span 4.5- no. 53,872.00
6.0 lm - complete with double member exterior and single
member interior, 10mm gusset plate, 16mm dia. rag bolts,
10mm base plate welded and application of two coats of anti-
corrosive paint all as per detail drawing given by the
Department
L-10 Supply and place in position steel roof truss (WEB) - span 7.5- no. 84,201.00
9.0 lm - complete with double member exterior and single
member interior, 10mm gusset plate, 16mm dia. rag bolts,
10mm base plate welded and application of two coats of anti-
corrosive paint all as per detail drawing given by the
Department
L-11 Supply and place in position steel roof truss (FLAT) - span no. 59,816.00
4.5-6.0 lm - complete with double member exterior and single
member interior, 10mm gusset plate, 16mm dia. rag bolts,
10mm base plate welded and application of two coats of anti-
corrosive paint all as per detail drawing given by the
Department
L-12 Supply and place in position steel roof truss (FLAT) - span no. 82,737.00
6.0-7.5 lm - complete with double member exterior and single
member interior, 10mm gusset plate, 16mm dia. rag bolts,
10mm base plate welded and application of two coats of anti-
corrosive paint all as per detail drawing given by the
Department
L-13 Supply and place in position steel roof truss (FLAT) - span no. 91,745.00
7.5-9.0 lm - complete with double member exterior and single
member interior, 10mm gusset plate, 16mm dia. rag bolts,
10mm base plate welded and application of two coats of anti-
corrosive paint all as per detail drawing given by the
Department
L-17 Supplying and fixing End rafters, 50x50x5mm (double) angle lm 2,680.00
iron on gable ends with purling cleats including application
of anticorrosive paint
M-2 Prepare and apply one coat of Alkali resistant primer and two sqm 400.00
coats of emulsion paint to walls - up to second floor level
M-3 Prepare and apply one coat of Alkali resistant primer and two sqm 440.00
coats of emulsion paint to walls - up to third floor level
M-4 Prepare and apply one coat of Alkali resistant primer and two sqm 368.00
coats of emulsion paint soffit of slabs - up to first floor level
M-5 Prepare and apply one coat of Alkali resistant primer and two sqm 408.00
coats of emulsion paint to soffit of slabs - up to second floor
level
M-6 Prepare and apply one coat of Alkali resistant primer and two sqm 442.00
coats of emulsion paint to soffit of slabs - up to third floor
level
M-7 Prepare and apply one coat of Acrylic wall filler and two coats sqm 403.00
of weather proof white and colour paint - up to first floor level
M-8 Prepare and apply one coat of Acrylic wall filler and two coats sqm 443.00
of weather proof white and colour paint - up to second floor
level
M-9 Prepare and apply one coat of Acrylic wall filler and two coats sqm 483.00
of weather proof white and colour paint - up to third floor
level
M-10 Prepare and apply one coat of Acrylic wall filler and two coats sqm 403.00
of bathroom paint, white and colour paint - up to first floor
level
M-12 Prepare and apply one coat of Acrylic wall filler and two coats sqm 483.00
of bathroom paint, white and colour paint - up to third floor
level
M-13 Prepare and apply two coats of floor paint, red, gray or black sqm 412.00
M-14 Prepare and apply one coat of wood preservative to structural sqm 283.00
timber work, including touching up cut end etc. after fixing
M-15 Varnishing two coats after sand papering of the surface sqm 387.00
M-16 Preparing and painting wood work with primer and two coats sqm 423.00
of enamel paint
M-18 Painting steel on new work with 2 coats of anti-corrosive sqm 324.00
paint
M-19 Painting walls with Emulsion paint, 2 coats, including sqm 305.00
preparation of surface
M-20 Painting Ceiling with 2 coats of Emulsion paint to the ceiling sqm 325.00
sheets and 2 coats of enamal paint to timber beadings
including preparation of surface
M-21 Painting walls with Weather shield paint, 2 coats, including sqm 352.00
preparation of surface
M-22 Wall, scraped to original plaster, sand papering and lime sqm 307.00
putting to cracks and defects, applying plaster of Paris and
preparing surface for new or similar application of emulsion,
snowcem or similar application
M-23 Preparing and painting wood work with 2 coats of enamel sqm 336.00
paint.
M-24 White or colour washing two coats to walls with SAMARA sqm 97.00
M-25 Water - Proofing of Bathrooms with approved materials as per sqm 380.00
Instructions
M-26 Preparing and painting wood work with water based primer sqm 2,863.00
and two coats of water based finishing coats
N - PLUMBER
N-2 Supply and lay PVC Pipe 25mm - type 1000 including all lm 200.00
necessary fittings
N-3 Supply and lay PVC Pipe 32mm - type 1000 including all lm 335.00
necessary fittings
N-4 Supply and lay PVC Pipe 40mm - type 600 including all lm 371.00
necessary fittings
N-5 Supply and lay PVC Pipe 50mm - type 600 including all lm 417.00
necessary fittings
N-6 Supply and lay PVC Pipe 63mm - type 400 including all lm 722.00
necessary fittings
N-7 Supply and fix Ball valve PEGLER or equivalent - for no. 1,221.00
overhead tanks - 20mm - all complete
N-8 Supply and fix Ball valve PEGLER or equivalent - for no. 1,821.00
overhead tanks - 25mm - all complete
N-11 Wash basin, ceramic, with pedestal (Sri Lankan made) with 25 no. 20,280.00
years guarantee complete with mono type, chromium plated
basin tap - (Momali, Huai or equivalent) - with 5 years
guarantee including all necessary fittings (Guarantee
certificates should be submitted with the bill)
N-12 Supply and fix closet, closed couple, Chinese made with 15 no. 25,136.00
years guarantee complete with hard seat cover and all
necessary fittings.(Guarantee certificate should be submitted
with the bill)
N-13 Supply and fix closet, closed couple, Sri Lankan made with no. 31,976.00
25 years guarantee complete with hard seat cover and all
necessary fittings.(Guarantee certificate should be submitted
with the bill)
N-14 Supply and fix 2 PC set, closed couple with hard seat cover, no. 32,156.00
(Chinese made) with 15 years guarantee complete with mono
type, chromium plated basin tap - (Momali, Huai or
equivalent) - with 5 years guarantee with all necessary
fittings.(Guarantee certificate should be submitted with the
bill)
N-15 Supply and fix 2 PC set, closed couple with hard seat cover, no. 50,576.00
(Sri Lankan made) with 25 years guarantee complete with
mono type, chromium plated basin tap - (Momali, Huai or
equivalent) - with 5 years guarantee with all necessary
fittings.(Guarantee certificate should be submitted with the
bill)
N-16 Supply and fix Closet Squatting type (Indian) with foot rest no. 6,536.00
ceramic, medium, with trap
N-17 Supply and fix stainless steel kitchen Sink, PRINCE or no. 8,286.00
equivalent - with single bawl, one side drain board including
chromium plated long neck type sink tap - Momali, Huai or
equivalent - with 5 years guarantee complete with all
necessary fittings - (overall size 900x450mm) - (Guarantee
certificate should be submitted with the bill)
N-19 Supply and fix Ceramic Sink, 24"x15"x7" complete with no. 12,840.00
mono type, chromium plated long neck type sink tap -
(Momali, Huai or equivalent) - with 5 years guarantee
including all necessary fittings (Guarantee certificates should
be submitted with the bill)
N-20 Supply and fix corner wash basin complete with mono type, no. 8,490.00
chromium plated basin tap - (Momali, Huai or equivalent) -
with 5 years guarantee including all necessary fittings
N-21 Supply and fix chromium plated bidet spray - (Momali, Huai no. 3,597.00
or equivalent) - with 5 years guarantee with all necessities.
(Guarantee certificate should be submitted with the bill)
N-22 Supply and fix plastic bidet spray - with 1 years guarantee no. 1,155.00
with all necessities.
N-23 Supply and fix Urinal bawl type no. 5,190.00
N-24 Supply and fix Urinal bawl type with flush valve(Sri Lankan no. 14,502.00
made with guarantee)
N-25 Supply and fix bath room accessories set (chromium plated no. 7,200.00
with 5 years guarantee) - 4 pcs. (mirror, mirror shelf, towel bar
and soap holder) all complete
N-26 Supply and fix bath room accessories set (chromium plated no. 8,070.00
with 5 years guarantee) - 6 pcs. (mirror, mirror shelf, towel
bar, soap holder, tooth brush holder and toilet paper holder) all
complete
N-27 Supply and fix Mirror, bathroom type, 20" x 16" with shelves no. 4,920.00
N-28 Supply and fix Mirror, bathroom type, 20" x 16" with plastic no. 2,610.00
back and shelves
N-29 Supply and fix Plastic Shower rose, with one year guarantee no. 746.00
N-30 Supply and fix head shower, chromium plated heavy with 5 no. 3,510.00
years guarantee
N-31 Supply and fix Telephone shower with bar, chromium plated no. 8,430.00
heavy with 5 years guarantee including flexible cable
N-32 Supply and fix Soap tray, chromium plated (Chinese) no. 885.00
N-33 Supply and fix towel bar, chromium plated (Chinese) no. 1,395.00
N-35 Supply and fix Angle valve (Momali, Huai or equivalent) with no. 1,965.00
5 years guarantee (Guarantee certificate should be submitted
with the bill)
N-36 Supply and fix Long neck type Sink tap, chromium plated - no. 2,835.00
(Momali, Huai or equivalent) - with 5 years guarantee
(Guarantee certificate should be submitted with the bill)
N-37 Supply and fix bib tap 20mm dia. - (Momali, Huai or no. 1,965.00
equivalent) - with 5 years guarantee (Guarantee certificate
should be submitted with the bill)
N-38 Supply and fix 20mm dia. plastic Bib tap - Water Tec or no. 453.00
equivalent - all complete
N-39 Supply and fix stop cock/gate valve PVC Water Tec or no. 369.00
equitant with SLS standards - 20mm dia.
N-40 Supply and fix stop cock/gate valve PVC Water Tec or no. 484.00
equitant with SLS standards - 25mm dia.
N-41 Supply and fix stop cock/gate valve PVC Water Tec or no. 505.00
equitant with SLS standards - 32mm dia.
N-42 Supply and fix stop cock/gate valve PVC Water Tec or no. 715.00
equivalent with SLS standards - 40mm dia.
N-43 Plastic shell water tank with 10 years guarantee of capacity no. 16,020.00
500 ltr. Including transporting, placing in position and fixing
to the accepted Engineering standards
N-44 Plastic shell water tank with 10 years guarantee of capacity no. 23,880.00
1000 ltr. Including transporting, placing in position and fixing
to the accepted Engineering standards
N-45 Plastic shell water tank with 10 years guarantee of capacity no. 42,480.00
2000 ltr. Including transporting, placing in position and fixing
to the accepted Engineering standards
N-46 Plastic shell water tank with 10 years guarantee of capacity no. 83,880.00
5000 ltr. Including transporting, placing in position and fixing
to the accepted Engineering standards
N-47 Supply and fix Cover and seat for WC - plastic no. 3,810.00
N-48 Supply and fix Chromium plated flexible cable (Momali, Huai no. 1,710.00
or equivalent)
N-50 Closet, pedestal type, available at site fixed with cement no. 2,514.00
concrete after breaking concrete floor and making good and
making connection
N-51 Supply and fix PVC specials with SLS standards - 20mm dia. no. 116.00
(Elbow, Bend, Socket)
N-52 Supply and fix PVC specials with SLS standards - 25mm dia. no. 133.00
(Elbow, Bend, Socket)
N-53 Supply and fix PVC specials with SLS standards - 32mm dia. no. 142.00
(Elbow, Bend, Socket)
N-54 Supply and fix PVC specials with SLS standards - 40mm dia. no. 181.00
(Elbow, Bend, Socket)
N-55 Supply and fix PVC specials with SLS standards - 50mm dia. no. 224.00
(Elbow, Bend, Socket)
N-56 Supply and fix PVC specials with SLS standards - 63mm dia. no. 272.00
(Elbow, Bend, Socket)
N-57 Supply and fix PVC specials with SLS standards - 20mm dia. no. 90.00
Tees
N-58 Supply and fix PVC specials with SLS standards - 25mm dia. no. 124.00
Tees
N-59 Supply and fix PVC specials with SLS standards - 32mm dia. no. 145.00
Tees
N-60 Supply and fix PVC specials with SLS standards - 40mm dia. no. 194.00
Tees
N-61 Supply and fix PVC specials with SLS standards - 50mm no. 256.00
dia.Tees
N-62 Supply and fix PVC specials with SLS standards - 63mm dia. no. 342.00
Tees
O - DRAINLAYER
O-3 Furnishing and fixing of Multi-floor trap including 150mm no. 1,716.00
plastic grating
O-4 Gulley pit with internal dimension 300x300x300mm deep, no. 5,648.00
150mm thick 1:3:6(40mm) concrete foundation, 225mm thick
brick work in 1:5 ct. sand, 12mm thick cement sand rendering
in 1:2 with forming canals and 75mm thick R.C.C. slab as per
Drawings
O-11 Soakage pit with internal dia. 1200mm and depth 1500mm, all no. 53,670.00
complete including excavation, ring beam with 4 Nos. 10 mm
bars & 6 mm dia. stirrups at 225mm spacing at bottom of
wall, 225mm brick work and 75mm thick cover slab with
12mm bars in 150mm c/c both way (as per detail drawing)
O-12 Soakage pit with internal dia. 1200mm and depth 3000mm, all no. 78,480.00
complete including excavation, ring beam with 4 Nos. 10 mm
bars & 6 mm dia. stirrups at 225mm spacing at bottom of
wall, 225mm brick work and 75mm thick cover slab with
12mm bars in 150mm c/c both way (as per detail drawing)
O-13 Supply and fix Diameter 900mm & Length 2400mm ready no. 45,707.00
made RCC septic tank (Engineers Approval)
P - ELECTRICAL INSTALLATION
P-7 Supply install MCB 6 way, 63A, 4 pole Isolator, 63A RCCB no. 28,389.00
4-pole and box fixed with 7/1.35mm single core cable - Three
Phase
P-13 Supply and install Exhaust fan all complete no. 10,740.00
P-14 Supply and install Florescent lamp 20W, 600mm single, with no. 4,088.00
plastic cover including switch and necessary wiring
P-15 Supply and install Florescent lamp 40W, 1200mm single, with no. 4,148.00
plastic cover including switch and necessary wiring
P-16 Supply and install Florescent lamp 40W, 1200mm, double, no. 4,328.00
with plastic cover including switch and necessary wiring
P-17 Supply and install Ceiling lamp barral type, dia.150mm - no. 3,476.00
including CFL bulb with guarantee, switch and necessary
wiring
P-18 Supply and install Pendent lamp including switch and no. 2,459.00
necessary wiring
P-19 Supply and install Pendant lamp with CFL bulb - 20w ( spiral no. 2,939.00
or globe) - with guarantee - including switch and necessary
wiring
P-20 Supply and install Batten lamp including switch and no. 2,333.00
necessary wiring
P-21 Supply and install Batten lamp with CFL bulb - 20w ( spiral no. 2,717.00
or globe) - with guarantee - including switch and necessary
wiring
P-22 Supply and install Wall lamp bracket type, single glass globe no. 3,539.00
with CFL bulb - 20w ( spiral or globe) including guarantee,
switch and necessary wiring
P-23 Supply and install LED lamp 5W including switch and no. 3,170.00
necessary wiring-with gurantee
P-24 Supply and install LED lamp 7W including switch and no. 3,410.00
necessary wiring-with gurantee
P-25 Supply and install LED lamp 9W including switch and no. 3,650.00
necessary wiring-with gurantee
P-26 Supply and install 5A Switch Socket outlet including no. 2,907.00
necessary wiring
P-45 Supply and install 7/0.53mm Cu/PVC- 1.5sqmm earth wire lm 541.20
P-46 Supply and install 7/0.67mm Cu/PVC- 2.5sqmm earth wire lm 551.04
P-47 Supply and install 7/0.85mm Cu/PVC- 4sqmm earth wire lm 577.28
P-49 Supply and install 7/1.35mm Cu/PVC- 10sqmm earth wire lm 669.12
P-50 Supply and install 7/1.7mm Cu/PVC- 16sqmm earth wire lm 754.40
P-51 Supply and install 19/1.35mm Cu/PVC- 25sqmm earth wire lm 921.68
P-54 Replacing florescent lamp 600mm with plastic shade no. 1,420.00
P-55 Replacing CFL bulb - 20w ( spiral or globe) - with guarantee no. 484.00
P-59 Replace One Gang one way switch as per instruction no. 204.00
P-60 Replacing Two Gang one way switch as per instruction no. 294.00
P-61 Replacing Three Gang one way switch as per instruction no. 384.00
P-62 Replacing Four Gang one way switch as per instruction no. 484.00
P-63 Replacing Five Gang one way switch as per instruction no. 569.00
P-64 Replacing 5 Amp switchet socket outlet as per instruction no. 429.00
P-65 Replacing 13 Amp switchet socket outlet as per instruction no. 439.00
P-66 Replacing 15 Amp switchet socket outlet as per instruction no. 504.00
AC MACHINES
P-70 Supply and install wall mounted AC machine split type - 9000 no. 90,090.00
btu - (Engineers Approval) - with one year guarantee to all
and five year guarantee for compressor including free service
P-71 Supply and install wall mounted AC machine split type - no. 98,890.00
12000 btu - (Engineers Approval)- with one year guarantee to
all and five year guarantee for compressor including free
service
Q - MISCELLANEOUS
Instructions
(a) Prior approval for the type of barbed wire should be taken from the Engineer before
using.
Q-3 Furnishing and fixing of fence post - (height 1800 mm, on a no. 1,546.00
concrete pad of 300x300x450mm, including necessary
excavation to the accepted Engineering standard
Q-4 Furnishing and fixing of fence post - (height 2400 mm), on a no. 1,858.00
concrete pad of 300x300x450mm including necessary
excavation to the accepted Engineering standard
Q-5 Fixing of barbed wire lines to the existing posts with lm 72.00
necessary hooks, bolts and nuts
Q-6 Furnishing, laying and fixing 300mm dia. RCC Hume pipes lm 3,529.00
with collars
Q-7 Furnishing, laying and fixing 450mm dia. RCC Hume pipes lm 5,697.00
with collars
Q-8 Furnishing, laying and fixing 600mm dia. RCC Hume pipes lm 7,275.00
with collars
Q-9 Supplying and pasting sand blast sticker on partition glasses m2 801.00
after cleaning surface.
Q-10 Supplying and fixing 200 x 200mm glass boxes on wall. no. 696.00
R - Aluminium Work
Specifications
(a) All the Aluminium members used for work should have following properties
1. Temper - T5
2. Tensile Strength - 155 Mpa
3. Elongation - 7% (Minimum)
(b) Surface Treatment to be done to get following thicknesses
R-2 Supply and fix Aluminium Casement window with 5mm float sqm 12,325.00
glass, rubber beading stick with silicon gum Brown/Silver
Aluminium members complete to the accepted Engineering
standards
R-3 Supply and fix Aluminium window Fixed type, beading stick sqm 9,640.00
with silicon gum Brown/Silver Aluminium members
complete to the accepted Engineering standards
R-4 Supply and fix Aluminium Louvered frame, beading stick with sqm 14,135.00
silicon gum Brown/Silver Aluminium members complete to
the accepted Engineering standards
R-5 Supply and fix Aluminium Door with 5mm float glass on top sqm 13,073.00
and PVC coated 5mm plywood board at bottom, rubber
beading stick with silicon gum Brown/Silver Aluminium
members including tie rod and lock complete to the accepted
Engineering standards
R-6 Supply and fix Aluminium Door with 5mm float glass on top sqm 13,190.00
and 0.47 mm Zn-Al covered plywood board at bottom, rubber
beading stick with silicon gum Brown/Silver Aluminium
members including tie rod and lock complete to the accepted
Engineering standards
R-8 Supply and fix Aluminium Partition with 5mm float glass sqm 7,946.00
rubber beading stick with silicon gum Brown/Silver
Aluminium members complete to the accepted Engineering
standards
R-9 Supply and fix Aluminium Partition with 5mm float glass on sqm 8,963.00
top and 0.47 mm Zn-Al covered plywood board at bottom,
rubber beading stick with silicon gum Brown/Silver
Aluminium members complete to the accepted Engineering
standards
Powder coated
R-10 Supply and fix Aluminium Sliding window with 5mm float sqm 10,325.00
glass, rubber beading stick with silicon gum Powder coated
Aluminium members complete to the accepted Engineering
standards
R-11 Supply and fix Aluminium Casement window with 5mm float sqm 13,565.00
glass, rubber beading stick with silicon gum Powder coated
Aluminium members complete to the accepted Engineering
standards
R-12 Supply and fix Alumimium window Fixed type, beading stick sqm 10,315.00
with silicon gum Powder coated Aluminium members
complete to the accepted Engineering standards
R-13 Supply and fix Aluminium Louvered frame, beading stick with sqm 15,916.00
silicon gum Powder coated Aluminium members complete to
the accepted Engineering standards
R-14 Supply and fix Aluminium Door with 5mm float glass on top sqm 15,320.00
and PVC coated 5mm plywood board at bottom, rubber
beading stick with silicon gum Powder coated Aluminium
members including tie rod and lock complete to the accepted
Engineering standards
R-15 Supply and fix Aluminium Door with 5mm float glass on top sqm 15,440.00
and 0.47 mm Zn-Al covered plywood board at bottom, rubber
beading stick with silicon gum Powder coated Aluminium
members including tie rod and lock complete to the accepted
Engineering standards
R-16 Supply and fix Aluminium Partition with 5mm float glass on sqm 6,050.00
top and PVC coated 5mm plywood board at bottom, rubber
beading stick with silicon gum Powder coated Aluminium
members complete to the accepted Engineering standards
R-18 Supply and fix Aluminium Partition with 5mm float glass on sqm 9,616.00
top and 0.47 mm Zn-Al covered plywood board at bottom,
rubber beading stick with silicon gum Brown/Silver
Aluminium members complete to the accepted Engineering
standards
Aluminium ceiling
R-19 Aluminium ceiling with gypsum board of one side decorative sqm 2,208.00
and the other side Aluminium foil, fixed with 25x25x1mm
angles and 25mm concrete nails to the wall and, 25x25mm
main runners at 600mm c/c in one way and 25x25mm cross T
in the other way hanged on roof with binding wire as per the
instructions
Plant
No. Item Unit Price (Rs.)
01 Concrete Mixer Day 4,000.00
02 Porker Vibrator Day 3,500.00
Construction Materials
No. Item Unit Size/Gauge Price (Rs.)
01 Cement - Incluiding 10km transport 50 kg. 900.00
02 Rubble 150-225 - excluding transport m3 990.00
03 Metal - 40mm - excluding transport m3 1,840.00
04 Metal - 32mm - excluding transport m3 1,945.00
05 Metal - 20mm - excluding transport m3 2,545.00
06 Engineering Brick - including 15 km transport 1000 Nos. 12,000.00
07 Lime - slaked, standard - excluding transport 20 kg 300.00
08 River sand - including transport m3 3,535.00
09 Earth - excluding transport m3 830.00
10 Gravel - excluding transport m3 850.00
11 Asbestos Corrugated Sheet 1 no 1.75 m 1,170.00
12 Asbestos Corrugated Sheet 1 no 2.5 m 1,650.00
13 Asbestos Corrugated Sheet 1 no 3.0 m 1,950.00
14 Asbestos Corrugated Sheet 1 no 3.5 m 2,350.00
15 Asbestos ceiling Sheet 1 no 1.2m x1.2m 530.00
16 Asbestos Ridging - 900mm 1 no 450.00
17 Cement sand hollow blocks, 400mmx100mmx200mm 1 no 40.00
18 Cement sand hollow blocks, 400mmx150mmx200mm 1 no 65.00
19 Cement sand solid blocks, 400mmx100mmx200mm 1 no 45.00
20 Cement sand solid blocks, 400mmx150mmx200mm 1 no 70.00
21 Calicut tiles - Including 10Km transport 1000 Nos. 36,700.00
22 Ridge tiles - Incluiding 10Km transport 1000 Nos. 53,000.00
23 Skim coat 20 kg 695.00
25 Glass pan - 5 mm sqm. 1,023.00
26 Paint brush - 150mm 1 no. 1,100.00
RN 1 Clearing & grubbing Heavy jungle including removing out side of the hec. 65,576.00
Reservation by machinery & burning .
RN 2 Clearing & grubbing Common jungle including removeng out side of the hec. 61,829.00
Reservation by machinery & burning .
RN 3 Clearing & grubbing Meduium jungle including removeng out side of the hec. 46,923.00
Reservation by machinery & burning .
RN 4 Clearing & grubbing Light jungle including removeng out side of the hec. 35,192.00
Reservation by machinery & burning .
RN 5 Clearing & grubbing Shrub jungle including removeng out side of the hec. 17,343.00
Reservation by machinery & burning .
RN 6 Clearing & grubbing Light jungle including removeng out side of the hec. 290,352.00
Reservation & burning by manual labour.
RN 7 Clearing & grubbing Secondary Growth jungle including removeng out side hec. 68,738.00
of the Reservation & burning by manual labour.
RN 14 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 387.00
damp including watering , compaction by machinery haul 0.25 mile (0.4 km)
( Transport by R.D. )
RN 15 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 413.00
damp including watering , compaction by machinery haul 0.5 mile(0.8 km).
( Transport by R.D. )
RN 17 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 481.00
damp including watering , compaction by machinery haul 1.0 mile (1.6 km).
( Transport by R.D. )
RN 18 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 510.00
damp including watering , compaction by machinery haul 1.25 mile (2.0 km).
( Transport by R.D. )
RN 19 Earth excavation from borrow area cut & lift 5 ft placing & compaction earth in m3 1,485.00
damp including watering , compaction by manualy haul 100 ft (30m)
RN 20 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 1,524.00
dam including watering , compaction by manualy haul 0.5 mile (0.8 km) by T.T
RN 21 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 1,604.00
damp including watering , compaction by manualy haul 1.0 mile (1.6 km) by
T.T
RN 22 Earth excavation from borrow area cut & lift 3 ft placing & compaction earth in m3 1,671.00
damp including watering , compaction by manualy haul 1.5 mile ( 2.4 km) by
T.T
COMMON EARTH EXCAVATION & WASTE BY MACHINERY
RN 23 Common earth excavation & spoil to waste or fill material cut 3 ft lift up to 3 ft m3 170.00
spread 100 ft(30 m) by machinery (B - hoe)
RN 24 Common earth excavation & spoil to waste or fill material cut 3 -5 ft lift up to 5 m3 170.00
ft spread 100 ft(30 m) by machinery (B - hoe)
RN 25 Common earth excavation & spoil to waste or fill material cut 5 -10 ft lift up to m3 173.00
10 ft spread 100 ft(30 m) by machinery (B - hoe)
RN 26 Common earth excavation & spoil to waste or fill material cut 10 -15 ft lift up m3 177.00
to 15 ft spread 100 ft(30 m) by machinery (B - hoe)
RN 27 Common earth excavation & spoil to waste or fill material cut 15 -20 ft lift up m3 182.00
to 20 ft spread 100 ft(30 m) by machinery (B - hoe)
RN 31 Common earth excavation & spoil to waste cut 3' lift up to 3 ft spread 100 ft(30 m3 170.00
m) by machinery (B - hoe)
RN 33 Common earth excavation & spoil to waste cut 5'-10' lift up to 10 ft spread 100 m3 173.00
ft(30 m) by machinery (B - hoe)
RN 34 Common earth excavation & spoil to waste cut 10'-15' lift up to 15 ft spread m3 177.00
100 ft(30 m) by machinery (B - hoe)
RN 35 Common earth excavation & spoil to waste cut 15'-20' lift up to 20 ft spread m3 182.00
100 ft(30 m) by machinery (B - hoe)
RN 37 Earth excavation & forming canal bund cut 3- 5 ft lift up to 5 ft spread 100 m3 247.00
ft(30 m) by machinery (B - hoe).Including Watering & Compaction.
RN 38 Earth excavation & forming canal bund cut 5 - 10 ft lift up to 10 ft spread 100 m3 250.00
ft(30 m) by machinery (B - hoe).Including Watering & Compaction.
RN 39 Earth excavation & forming canal bund cut 10 - 15 ft lift up to 15 ft spread 100 m3 254.00
ft(30 m) by machinery (B - hoe).Including Watering & Compaction.
RN 40 Earth excavation & forming canal bund cut 15 - 20 ft lift up to 20 ft spread 100 m3 257.00
ft(30 m) by machinery (B - hoe).Including Watering & Compaction.
RN 41 Earth excavation from borrow & placing watering & compating earth in canal m3 247.00
bund Cut 3 ft Lift up to 3 ft Spraed 100 ft by machinery.
RN 42 Earth excavation from borrow & placing watering & compating earth canal m3 365.00
bund Cut 3 ft Lift up to 3 ft haul 1/4 mile (0.4 Km ) by machinery ( Transport
by R.D. )
RN 43 Earth excavation from borrow & placing watering & compating earth canal m3 391.00
bund Cut 3 ft Lift up to 3 ft haul 1/2 mile (0.8 Km) by machinery ( Transport by
R.D. )
RN 44 Earth excavation from borrow & placing watering & compating earth canal m3 423.00
bund Cut 3 ft Lift up to 3 ft haul 3/4 mile (1.2 Km ) by machinery ( Transport
by R.D. )
RN 45 Earth excavation from borrow & placing watering & compating earth canal m3 459.00
bund Cut 3 ft Lift up to 3 ft haul 1.0 mile (1.6 Km ) by machinery ( Transport
by R.D. )
RN 46 Common earth excavation in canal & forming canal bund cut 0 - 3 ft lift up to 5 m3 1,679.00
ft spread 100 ft(30 m) by manual labour
RN 50 Earth excavation from borrow & forming canal bund cut 3 ft lift up to 3 ft m3 1,364.00
spread 50 ft( 15 m) & compacting by manual labour , Transport by RD.Haul 1/4
mile (0.4 Km )
RN 51 Earth excavation from borrow & forming canal bund cut 3 ft lift up to 3 ft m3 1,391.00
spread 50 ft( 15 m) & compacting by manual labour , Transport by RD.Haul 1/2
mile (0.8 Km )
RN 52 Earth excavation from borrow & forming canal bund cut 3 ft lift up to 3 ft m3 1,423.00
spread 50 ft( 15 m) & compacting by manual labour , Transport by RD.Haul 3/4
mile ( 1.2 Km )
RN 53 Earth excavation from borrow & forming canal bund cut 3 ft lift up to 3 ft m3 1,458.00
spread 50 ft( 15 m) & compacting by manual labour , Transport by RD.Haul 1.0
mile ( 1.6 Km )
CUT OPENING THE TANK BUND BY MACHINERY
RN 54 Earth excavation for cut opening the tank bund & dump at the site with back m3 357.00
filling 75 % excavated soil & 25% borrow earth including placing , watering &
compaction by machinery , Cut 5 - 10 ft lift up to 10 ft spread 100 ft.
RN 55 Earth excavation for cut opening the tank bund & dump at the site with back m3 3,060.00
filling 75 % excavated soil & 25% borrow earth including placing , watering &
compaction by manual laibour , Cut 5 - 10 ft lift up to 10 ft spread 100 ft.
RN 59 Desilting & spoil to waste cut & lift 0 - 10 ft haul 100 ft (30m) by Machinary. m3 113.00
TURFING
RN 65 Furnishing placing & watering turf till take roots transport 1/2 mile by manual m2 206.00
labour.
RN 66 Furnishing placing & watering turf till take roots transport 1 mile by manual m2 213.00
labour.
GRAVELLING ON TANK BUND OR AGRI ROAD BY MACHINERY
TANSPORT BY FARM TRACTOR
RN 67 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 645.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 0.5 mile ( 0.8 Km ) by machinery ( Transport
by T.T.)
RN 68 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 724.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 1.0 mile ( 1.6 Km ) by machinery ( Transport by T.T.)
RN 69 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 791.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 1.5 mile ( 2.4 Km ) by machinery ( Transport by T.T.)
RN 70 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 899.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 2.0 mile ( 3.2 Km ) by machinery ( Transport by T.T.)
RN 71 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 951.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 2.5 mile ( 4.0 Km ) by machinery( Transport by T.T.)
RN 72 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 1,015.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 3.0 mile ( 4.8 Km ) by machinery( Transport by T.T.)
RN 73 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 1,099.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 3.5 mile ( 5.6 Km ) by machinery ( Transport by T.T.)
RN 74 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 1,161.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 4.0 mile ( 6.4 Km ) by machinery ( Transport by T.T.)
RN 76 Gravel excavation & use as construction material cut 0 -5 ft lift up to 5 ft spred m3 1,329.00
100 ft including furnishing , placing , watering & compaction transport by farm
tractor haul 5.0 mile ( 8.0 Km ) by machinery ( Transport
by T.T.)
RN 77 Exacavation for foundation in any material except rock requiring blasing , ram , m3 1,038.00
and surplus disposed of within site as directed . Cut &fill 0 -5 ft by manual
labour.
RN 78 Exacavation for foundation in any material except rock requiring blasing, 50 % m3 1,186.00
part return fill in and ram , and surplus disposed of within site as directed . Cut
&fill 0 -5 ft by manual labour.
CONCRETE WORK
RN 79 Cement concrete Grade 15 (1:3:6 - 40mm-1 1/2" )mixing, hoisting placing in m3 16,348.00
position, packing temping including vibrating as directed , curing as specified
and stop pour construction joint etc.in irrigation structures.Excluding Form
Work. by manual labour.
REINFORCEMENT
RN 81 MILD steel rods to the SLS standrds in reinfocing Supplying , Bending , Kg 257.00
Cutting , Fabrincation , Hoisting , and placing in position. And tied with G.I
wire as directed including Rolling margin , waste , all spacing , laps etc.in
reinforced steel other than design laps , Holding and supporting including
temporary fixing supports , hangers
RN 82 TOR steel rods to the SLS standrds in reinfocing Supplying , Bending , Kg 260.00
Cutting , Fabrincation , Hoisting , and placing in position. And tied with G.I
wire as directed including Rolling margin , waste , all spacing , laps etc.in
reinforced steel other than design laps
FORM WORK
RN 84 Class III Timber shuttering for irrigation structures including dismanteling m2 1,030.00
RUBBLE MASONARY
RN 86 9" thick pitching in 6" - 9 " rubble in 1 : 5 ct.mt. lift 0 - 5 ft haul. m3 7,545.00
RN 88 Supplying , Laying , Joining 4 " dia. Long Hume pipe. ( Including Transport & lm 1,460.00
loading , unloading )
RN 89 Supplying , Laying , Joining 6 " dia. Long Hume pipe.( Including Transport & lm 2,115.00
loading , unloading )
RN 90 Supplying , Laying , Joining 9 " dia. Long Hume pipe.( Including Transport & lm 2,621.00
loading , unloading )
RN 91 Supplying , Laying , Joining 12 " dia. Long Hume pipe.( Including Transport & lm 3,306.00
loading , unloading )
RN 92 Supplying , Laying , Joining 15 " dia. Long Hume pipe.( Including Transport & lm 3,716.00
loading , unloading )
RN 93 Supplying , Laying , Joining 18 " dia. Long Hume pipe.( Including Transport & lm 5,025.00
loading , unloading )
RN 94 Supplying , Laying , Joining 24 " dia. Long Hume pipe.( Including Transport & lm 6,285.00
loading , unloading )
RN 95 Supplying , Laying , Joining30 " dia. Long Hume pipe.( Including Transport & lm 9,729.00
loading , unloading )
RN 96 Supplying , Laying , Joining 36 " dia. Long Hume pipe.( Including Transport & lm 11,674.00
loading , unloading )
RN 97 Supplying , Laying , Joining 48 " dia. Long Hume pipe.( Including Transport & lm 18,524.00
loading , unloading )
RN 98 Furniching and install in 6" dia. Cast iorn gates & hoist complete with spindle no. 24,379.00
etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
RN 99 Furniching and install in 9" dia. Cast iorn gates & hoist complete with spindle no. 38,479.00
etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
Furniching and install in 12" dia. Cast iorn gates & hoist complete with spindle no. 42,097.00
RN etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
100
Furniching and install in 15" dia. Cast iorn gates & hoist complete with spindle no. 49,897.00
RN etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
101
Furniching and install in 18" dia. Cast iorn gates & hoist complete with spindle no. 77,992.00
RN etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
102
Furniching and install in 24" dia. Cast iorn gates & hoist complete with spindle no. 109,306.00
RN etc. P No C 501 -2 -6 D . ( Including Transport & loading , unloading )
103
PLASTERING
RN 1/2" thick rough cement plastering in 1:3 cement motar for rubble masonary m 568.00
2
RN 106 Earth Work from borrow Puddle clay & construction of puddle clay wall m4 2,091.00
including watering & compaction by manual labour Transport by F. T. haul 1/4
mile ( 0.40 Km. )
RN 107 Soft rock exacavation and spoil to waste , cut 0 -5 ft lift 5' spread 100' by m3 243.00
machinery
RN 108 Soft rock exacavation and spoil to waste , cut 5 -10 ft lift 10' spread 100' by m3 248.00
machinery
RN 109 Soft rock exacavation and spoil to waste,cut 10 -15 ft lift 15' spread 100' by m3 252.00
machinery
RN 110 Soft rock exacavation and spoil to waste,cut 15 -20 ft lift 20' spread 100' by m3 257.00
machinery
RN 111 Soft rock exacavation and spoil to waste , cut 0 -5 lift 5' spread 100' by manual m3 1,878.00
labour.
RN 112 Soft rock exacavation and spoil to waste , cut 5 -10 lift 10' spread 100' by m3 2,514.00
manual labour.
RN 113 Soft rock exacavation and spoil to waste,cut 10 -15 lift 15' spread 100' by m3 2,567.00
manual labour.
RN 114 Soft rock exacavation and spoil to waste,cut 15 -20 lift 20' spread 100' by m3 2,630.00
manual labour.
RN 119 Rock exacavation and spoil to waste / Quarry products cut 5 ft lift 5 ft by m3 1,974.00
manual labour.
RN 120 Rock exacavation and spoil to waste / Quarry products cut 5 -10 ft lift 10 ft by m3 2,610.00
manual labour.
MACHINE RATE
RN 123 Motor grader (120 - 140 H . P ) Clearing road plat form , reduceing high side hrs. 4,230.00
or cutting side drain of Agri - Road
RN 124 Hydrolic excavater cum back hoe 1.0 Cu. yd. hrs. 4,118.00
LAIBOUR RATES
RN 125 Un skiled laibour day 1,200.00
RN 126 Semi skiled laibour day 1,300.00
TIMBER -KUMBUK
2 Concrete testing
2.1 Concrete cube test (for one sample)
Casted by laboratory staff Rs. 650.00
Casted by Consultant or Contractor Rs. 525.00
2.2 Rebound hammer test(NDT)(for 0.09m2 area) Rs. 750.00
2.3 PUNDIT test (per point) Rs. 880.00
2.4 Covermeter test (per 1m2) Rs. 2,125.00
2.5 Slump test Rs. 375.00
2.6 Concrete Mix Design- G20 Rs. 40,520.00
2.7 Concrete Mix Design- G25 Rs. 40,520.00
2.8 Concrete Mix Design- G30 Rs. 40,520.00
3 Aggregate testing
3.1 Particle size distribution Rs. 1,400.00
3.2 Flakiness index (Including sieve analysis test) Rs. 2,400.00
3.3 Elongation index (Including sieve analysis test) Rs. 2,400.00
3.4 Specific gravity and water absorbtion Rs. 2,010.00
3.5 Aggregate impact value Rs. 1,975.00
3.6 Aggregate crushing value Rs. 2,700.00
5 Cement testing
5.1 Setting times of cement Rs. 1,150.00
5.2 Cement strength test Rs. 1,150.00