COMPANY NAME
{PROJECT} Interface
Management Procedure
Prepared by www.interfacemanagement.com
AUTHOR
[Pick the date]
[Type the abstract of the document here. The abstract is typically a short summary of the contents of
the document. Type the abstract of the document here. The abstract is typically a short summary of the
contents of the document.]
Contents
1 INTRODUCTION .......................................................................................................................................... 2
1.1 Objectives............................................................................................................................................ 2
1.2 PRINCIPLES .......................................................................................................................................... 2
2 DEFINITIONS ............................................................................................................................................... 3
3 INTERFACES ................................................................................................................................................ 4
3.1 INTERNAL INTERFACE.......................................................................................................................... 4
3.2 EXTERNAL INTERFACES ....................................................................................................................... 4
3.3 KEY INTERFACES .................................................................................................................................. 4
4 ROLES AND RESPONSIBILITIES ................................................................................................................... 4
4.1 INTERFACE MANAGER......................................................................................................................... 4
4.2 INTERFACE COORDINATOR ................................................................................................................. 5
4.3 REQUESTING PARTY ............................................................................................................................ 5
4.4 RESPONSIBLE PARTY ........................................................................................................................... 5
5 INTERFACE PROCEDURE ............................................................................................................................. 5
5.1 General ................................................................................................................................................ 5
5.2 Team Structure ................................................................................................................................... 5
5.3 Workflow............................................................................................................................................. 6
5.4 Access .................................................................................................................................................. 6
5.5 Raising a Request ................................................................................................................................ 6
5.6 Validation a Request ........................................................................................................................... 7
5.7 Approving a Request ........................................................................................................................... 7
5.8 Responding to a Request .................................................................................................................... 8
5.9 Closing a Request ................................................................................................................................ 8
5.10 Request Revisions ............................................................................................................................. 9
5.11 Cancelling an Interface Request ....................................................................................................... 9
6 INTERFACE MEETINGS.............................................................................................................................. 10
7 IM SYSTEM ............................................................................................................................................... 10
8 REPORTING............................................................................................................................................... 10
Appendix 1 – Interface Register .................................................................................................................. 12
Appendix 2 – Interface Request Report ...................................................................................................... 14
Appendix 3 – Project Interface Overview ................................................................................................... 16
Appendix 4 – Contact Report ...................................................................................................................... 18
1 INTRODUCTION
The purpose of this plan is to establish an interface management process to manage key interfaces that
arise during the planning and execution of the {PROJECT}. In order for the project to eliminate waste
(time and capital), interfaces must be managed. The interface management process consists of planning,
identification, approving, auditing and closing-out interfaces. Closing out these interfaces is critical to
the successful implementation and execution of the {PROJECT}. This procedure addresses the following:
Outline the process for successfully coordinating and managing all key interfaces.
Define the responsibilities for each of the teams involved with the interface requests such that
the individuals are accountable to follow up the required actions.
Define how key interfaces are identified, logged into an interface register and tracked until
completion.
Logging all key interfaces into an accessible register, and actively keep the interface register up
to date.
Define the workflow that interface requests will follow throughout their life cycle.
Establish the process to monitor the status of the interface requests contained within the
register, and actively make certain that all requests are closed-out in a timely manner.
Implement the system by which the parties coordinate their interface activities.
Facilitate communications between parties, including conflict resolution.
Promote clear and consistent communication among the involved project team members for
transmitting interface information.
1.1 Objectives
The primary objectives of this procedure and its implementation are as follows:
Identify the appropriate personnel who will be responsible for each interface request and for
resolution of the interface request
Provide a system which will facilitate the identification of interfaces, and address the specific
interface request requirements
Establish a procedure that promotes efficient management of interface issues from initiation to
close out
Define methods for communication and coordination of interface requests between various
parties
Facilitate clear and frequent communications amongst parties
Facilitate the agreement of a schedule for interface request resolution and close-out
Define a means for the control, expediting, and reporting of progress on the transfer of interface
requests
Define processes of assurance that interface requests are effectively identified and managed
1.2 PRINCIPLES
COMPANY’s expectations for CONTRACTOR’s Interface Management Procedure are to:
Ensure internal interfaces are identified and managed early via a structured process;
Ensure agreement between CONTRACTOR and CONTRACTOR groups on roles, responsibilities
and timing for providing such information;
Promote clear, accurate, timely and consistent communication with CONTRACTOR groups for
transferring internal interface information required to progress the Services;
Identify internal interface issues with potential for impacts to cost or schedule quickly and
communicate to all relevant CONTRACTOR groups, including Company, in order to minimize
their impact;
All participants within the CONTRACTOR and CONTRACTOR groups are responsible for
identifying and communicating internal interface issues to their lead supervisor, manager, or the
designated
Interface Coordinators:
Internal interface issues will be identified, catalogued, assessed for impact, assigned and
managed throughout the duration of the PROJECT;
Internal interface issues will be resolved at the appropriate working level within the Project
organization to minimize rework (for example, engineers responsible for the design and design
verification);
Regularly advise Company on the status of resolution of internal interface issues;
Internal interface activities will be coordinated with other CONTRACTOR work groups and
process such as Management of Change, HES, QMS, and Risk Management to improve process
efficiencies and avoid duplication of efforts.
All internal interfaces, whether with subcontractors or suppliers or consultants, shall be established
through written procedures. These procedures shall ensure:
Development of comprehensive internal interface matrices and registers
Full understanding of work scope accountabilities and responsibilities by all CONTRACTOR and
CONTRACTOR group personnel
Information distribution through a formal system at the required times
Regular, documented meetings and other communication to complete internal interface
agreements and agree on assignments, actions, and dates for tasks to be completed
Single-point accountability for internal interfaces
2 DEFINITIONS
COMPANY - {Insert Project Owner Here}
PROJECT - {Insert Project Name Here}
CONTRACTOR - This term refers to any contractor working on PROJECT under a work contract
with COMPANY
PMT - Project Management Team
Interface - See Section 3.
Interface Request - A query from a requesting party on one team, soliciting a response from
another party on a different team that would clarify an issue on an interface.
Requesting Party - The party initiating an interface request.
Responsible Party - The party responsible for responding to an interface request.
Interface Coordinator - A team member that approves outgoing interface requests, and ensures
that incoming requests are responded to in a timely manner.
Interface Manager - The individual that works in conjunction with the project manager to ensure
the interface process is adhered to, and that all interface issues are tracked to close-out.
WIMS - Workflow and Interface Management System. The interface management software used
for tracking interfaces on the project.
3 INTERFACES
An interface is defined as a point of connect between entities working on a common project. This point
can be:
Physical - Physical interaction between components
Functional - Functional Requirements between systems
Contractual - Interactions between subcontractors/suppliers
Organizational - Information exchanged between disciplines
Knowledge - General information exchanged between parties
Resource - Points of dependencies between equipment, material, and labor suppliers
3.1 INTERNAL INTERFACE
An internal interface is one where the complete responsibility lies within CONTRACTOR’s scope of work.
3.2 EXTERNAL INTERFACES
Any part of the Scope of Work under the responsibility of CONTRACTOR which may influence, or be
influenced by, the scope of work covered by any other contract related to the PROJECT.
3.3 KEY INTERFACES
Key interfaces are interfaces that are managed by the {PROJECT} Interface Management Team,
nominated leads and/or interface coordinator. The {PROJECT} Interface Coordinator will oversee and
monitor these interface activities and will provide proactive support to the nominated focal points for
coordinating interfaces within each discipline. Key interfaces will be entered in the {PROJECT} WIMS and
tracked to completion.
4 ROLES AND RESPONSIBILITIES
4.1 INTERFACE MANAGER
Develops and implements the Interface Management Procedure.
Ensures consistency in the project wide application of the Interface Management Procedure.
Oversees and monitors project wide internal and external interface management activity.
Maintains the master Interface Request Register.
Regularly reports on status of key interface activity.
4.2 INTERFACE COORDINATOR
Participate in Interface Meetings with affected/involved parties as required to manage
interfaces.
Review outgoing interface requests and serve as interface request approver
Ensure resolution of inbound interface requests
Actively monitor interface request register to: expediting requests and open/update/close
requests on behalf of their team
Provide collaborative interface resolution support.
Serve as PMT liaison between contractor and operating plant point of contact.
Inform Interface Manager of potential impacts due to unsatisfactory resolution response.
4.3 REQUESTING PARTY
The requesting party is the Individual submitting an Interface Request for a response. The requesting
party should raise the request in WIMS to ensure proper visibility (See Section 5.5). This will send the
request to their team’s IC for approval while notifying the IM team of the new request.
4.4 RESPONSIBLE PARTY
The responsible party is the Individual responsible for responding to an Interface Request. Once a
request has been sent to a responsible party, they should provide their response and any supporting
documents in WIMS (See Section 5.8). This will begin the closeout process for the interface request.
5 INTERFACE PROCEDURE
5.1 General
The Interface Management Process for {PROJECT} shall follow these steps:
Identify the Interface Manager for {PROJECT}
Develop Interface Management Plan and Procedures.
Identify the various teams that will interact with one another to resolve interfaces
Identify the individual or individuals that will act as Interface Coordinator for each team
Select the workflow that each interface request will follow
Implement Interface Management training to all relevant interface personnel
Organize interface workshops with project entities to Identify Key Interfaces and required dates
Execute Interface Requests with involved parties as needed using WIMS
Monitor, Track and Report on Performance and Progress to completion. The key activity at each
of these steps is to conduct collaborative interface coordination meetings and elevate any
conflicts or non-performing interfaces to the PIM for resolution.
5.2 Team Structure
[INSERT PROJECT TEAM STRUCTURE HERE]
5.3 Workflow
5.4 Access
Each team member will have access to the interface system by going to the following URL:
{WIMS PROJECT URL HERE}
5.5 Raising a Request
Interfaces may arise from:
Interface Meetings
Review of Contractor Document Registers
Documentation Review
Interface planning/workshop sessions
Interface requests arise as project progresses
Once an interface has been identified, the request must be logged into WIMS, either by the requesting
party, or the requesting party's interface coordinator. The user should log into the WIMS, and click
the NEW REQ button.
This will show the new request input form. Fill all required fields, and click SAVE. This will send email
notifications to all appropriate parties, and start the workflow process for the interface request. The
request will have an initial status of PENDING IC APPROVAL.
5.6 Validating a Request
The new request will send an email notification to the requesting team's interface coordinator. The
interface coordinator should review the request to ensure:
The request description is coherent, and free from errors.
The select due date is reasonable.
The description of the request represents a single issue. Since each request has a single
responsible party and due date, the request should be able to be approved, responded to, and
closed independently of all other requests.
The request is not a duplicate of a previous request.
The request does not violate any confidentiality agreements dictated by the project contract.
5.7 Approving a Request
Once the validity of a request has been confirmed, the requesting interface coordinator should approve
the request. Upon this approval, the request will have a status of PENDING RESPONSE, and an email
notification will be sent to the responsible party, indicating a response is required.
5.8 Responding to a Request
Once a response has been determine, the responsible party, or responsible party's interface coordinator
should enter the response into the RESPONSE field, and click the RESPOND action. The request will
send an email notification to the requesting party and have a status of PENDING ACCEPTANCE.
5.9 Closing a Request
Upon determining that a response is satisfactory, either the requesting party or the requesting team's
interface coordinator can click the ACCEPT action. When the request has been accepted, it will be
closed.
5.10 Request Revisions
If a response does not satisfactorily resolve the request, the requesting party can reject the response
and send it back to the responding party for revision.
5.11 Cancelling an Interface Request
Once an Interface Request has been raised, a request number has been assigned and relevant parties
have notified. At this point, to cancel the request, the interface manager, or requesting Interface
Coordinator will have access to void the request:
6 INTERFACE MEETINGS
The Interface Manager (IM) is responsible for holding interface meetings every 1- 2 weeks as needed.
All interface coordinators and key parties should attend. During these meetings:
The IM will have a copy of the most recent interface register
High priority and overdue items will be addressed and discussed to expedite close-out
The remaining open items can be discussed for status updates and clarifications
Any new interface requests that have not already been logged into the interface register should
be entered into WIMS at this point
7 IM SYSTEM
Project interfaces will be managed using WIMS. WIMS is a web based system that CONTRACTORS and
COMPANY can access to view the current interface register. WIMS will have the project organizational
chart, project layout, and interface workflow defined for {PROJECT}. Each team in the organizational
chart should have at least one interface coordinator defined. The team IC will be responsible for
ensuring that their team members raise and respond to interface requests into WIMS in a timely
manner. WIMS will send email notifications to relevant parties as interface requests are raised and
modified.
The IM will provide access to training sessions to instruct all parties how to access WIMS, raise, respond,
and audit interfaces on {PROJECT} (See Section 5).
8 REPORTING
Reports will be accessible and generated in WIMS. The standard reports are as follows:
Interface Register – Accessible in WIMS, or exportable to excel (Appendix 1)
o Includes the following fields
Request #
Title
Description
Component
Requester
Responsible
Status
Required Date
Response
Interface Request Report – Accessible in WIMS, or exportable to excel (Appendix 2)
o Includes all information stored with an individual interface Request
Project Interface Overview – Accessible in WIMS, or exportable to PNG (Appendix 3)
o Team and request status count summarized data
Contact Report – Accessible in WIMS, or exportable to excel (Appendix 4)
o Name, contact info, team, and position information for all project team members
Appendix 1 – Interface Register
Appendix 2 – Interface Request Report
Appendix 3 – Project Interface Overview
Appendix 4 – Contact Report