Completion Tools
Completion Tools
equipments
Sohail Nawab
Lecturer
Institute of Petroleum and Natural Gas Engineering
Mehran UET, Jamshoro
[email protected]
Well Profile
?
Tubing joint
Nipple
SSD
Bottom No-go nipple SPM
Top No-go nipple Expansion joint
Selective nipple Flow Coupling
Casing sub Blast joint
Size ranges:
2 3/8” to 20”
Length:
2,4,6,8,10 and12 ft
Different dimensions of pup joint
Cross Over
Cross over act as an intermediary between two dissimilar threads and are
used to connect the two.
Also known as X-over
selective-landing nipples
and ported or safety-valve nipples.
No go nipple
It is a crossover
Used to connect millout extension and spacer
tube/pipe
Connections ?
Mill out extension
PURPOSE:
Provide a larger ID below packers to protect the
seals
and to accept the packer retrieving sub of a milling
tool
The purpose of SSSV is to shut off flow from the well in the
event of a potentially catastrophic situation.
https://www.youtube.com/watch?v=BgWBXKtAFzQ
https://www.youtube.com/watch?v=2a5X-VCrOvg
Control Line
This equipment has got only sealing elements & allows the tubing to slide in
the packer.
PBR
SBE
TSR
Tubing joint
It’s a crossover
Used to connect/join tubing hanger
and first tubing
It is a completion component,
which sits inside the tubing Head
Spool & provides the following
functions:
Suspends the tubing.
Provides a seal b/w the tubing &
the tubing head spool.