Project Plan Template
Project Plan Template
Team Name:
Team Member 1:
Team Member 2:
Team Member 3:
Team Member 4:
Team Member 5:
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
ii
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
PREFACE
This Project Management Plan (PMP) is intended to provide guidance on the management of the [[Project
Name]].
The template conforms to the Institute of Electrical and Electronics Engineers (IEEE) Standard for
Software Project Management Plans, IEEE Std 1058-1998, for format and content. The template and its
standard were selected as they are flexible enough to be applied to any type of project. The management,
technical, and supporting processes comply with the guidance provided by Standard for Information
Technology - Software Life Cycle Processes, IEEE/Electronic Industries Association (EIA) 12207 Series;
Systems Engineering – System Life Cycle Processes, International Organization for Standardization
(ISO)/International Electrotechnical Commission (IEC) 15288; or the Processes for Engineering a
System, Electronic Industries Alliance (EIA) Standard 632.
DOCUMENT CONVENTIONS
The outline of this Project Management Plan (PMP) has been tailored from the Institute of Electrical and
Electronics Engineers (IEEE) Standard for Software Project Management Plans, IEEE Std 1058-1998.
Standard conventions are used within this document to direct the reader to specific sections of the text.
These sections provide instructions and explanations and require users to insert their own project-specific
information. The conventions used in this document are shown below.
[[text]] Global changes. Items that appear in regular text and are surrounded by double brackets
represent changes that can be made globally throughout the document.
Italics Instructions and explanations. Each section of the template has been annotated with a
guidance box, derived from the IEEE 1058-1998 standard, to assist the reader in drafting
the content. For example:
IEEE Std 1058-1998 Guidance
The guidance box provides instructions and explanations from the IEEE 1058-1998
Standard, in italics, as required to assist the user in drafting their own information.
Guidance boxes should be deleted from the final PMP.
iii
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
RECORD OF CHANGES
*A - ADDED M - MODIFIED D – DELETED
NUMBER OF A* CHANGE
VERSION
DATE FIGURE, TABLE OR M TITLE OR BRIEF DESCRIPTION REQUEST
NUMBER
PARAGRAPH D NUMBER
iv
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
TABLE OF CONTENTS
Section Page
SECTION 1. OVERVIEW..........................................................................................................................1
1.1 Project Summary.........................................................................................................................1
1.1.1 Purpose, Scope, and Objectives...........................................................................................1
1.1.2 Assumptions and Constraints...............................................................................................1
1.1.3 Project Deliverables.............................................................................................................1
1.1.4 Master Schedule and Budget Summary................................................................................1
1.2 Evolution of the Plan...................................................................................................................2
1.3 Document Structure.....................................................................................................................2
SECTION 2. REFERENCES......................................................................................................................4
2.1 Standards and Documents............................................................................................................4
SECTION 3. DEFINITIONS......................................................................................................................5
SECTION 4. PROJECT ORGANIZATION...............................................................................................6
4.1 External Interfaces.......................................................................................................................6
4.2 Internal Structure.........................................................................................................................6
4.2.1 The Project Manager............................................................................................................6
4.3 Project Roles and Responsibilities...............................................................................................6
SECTION 5. MANAGEMENT PROCESS................................................................................................7
5.1 Start-up........................................................................................................................................7
5.1.1 Estimation............................................................................................................................7
5.1.2 Staffing.................................................................................................................................7
5.1.3 Resource Acquisition...........................................................................................................7
5.1.4 Staff Training.......................................................................................................................8
5.2 Work Planning.............................................................................................................................8
5.2.1 Work Activities....................................................................................................................8
5.2.2 Schedule Allocation.............................................................................................................8
5.2.3 Resource Allocation.............................................................................................................9
5.2.4 Budget Allocation................................................................................................................9
5.3 Project Controls...........................................................................................................................9
5.3.1 Requirements Control..........................................................................................................9
5.3.2 Schedule Control................................................................................................................10
5.3.3 Budget Control...................................................................................................................10
5.3.4 Quality Control...................................................................................................................11
5.3.5 Project Reporting and Communication...............................................................................11
5.3.6 Metrics Collection..............................................................................................................11
5.4 Risk Management......................................................................................................................12
5.5 Project Closeout.........................................................................................................................12
SECTION 6. TECHNICAL PROCESS....................................................................................................13
6.1 Process Model...........................................................................................................................13
6.2 Methods, Tools and Techniques.................................................................................................13
6.3 Project Infrastructure.................................................................................................................13
6.4 Product Acceptance...................................................................................................................13
v
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
LIST OF FIGURES
Figure Page
LIST OF TABLES
Table Page
Table 7-1. [[Project Name]] Documentation.............................................................................................16
vi
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
SECTION 1. OVERVIEW
1.1 PROJECT SUMMARY
IEEE Std 1058-1998 Guidance
The IEEE Std 1058-1998 provides no specific guidance on Project Summary (Subclause1.1). This section
may be tailored as needed to provide additional subsections in which a project may be more fully
described. For example, 1.1 Project Summary, 1.1.1 System Overview, 1.1.2 Purpose, Scope, and
Objectives, etc.
1
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
This subclause shall provide a summary of the schedule and budget for the project. The level of detail
should be restricted to an itemization of the major work activities and supporting processes as, for
example, those depicted by the top level of the work breakdown structure.
2
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
3
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
SECTION 2. REFERENCES
IEEE Std 1058-1998 Guidance
(Clause 2) References
This clause shall provide a complete list of all documents and other sources of information referenced in
the document. Each document should be identified by title, report number, date, author, path/name for
electronic access, and publishing organization. Other sources of information, such as electronic files,
shall be identified using unique identifiers such as date and version number. Any deviations from
referenced standards or policies shall be identified and justifications shall be provided.
4
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
SECTION 3. DEFINITIONS
IEEE Std 1058-1998 Guidance
(Clause 3) Definitions
This clause shall define, or provide references to, documents containing the definition of all terms and
acronyms required to properly understand this planning document.
5
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
6
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
5.1.2 Staffing
IEEE Std 1058-1998 Guidance
(Subclause 5.1.2) Staffing plan
This subclause shall specify the number of staff required by skill level, the project phases in which the
numbers of personnel and types of skills are needed, the source of personnel and the duration of need.
Resource Gantt charts, resource histograms, spreadsheets, and tables may be used to depict the staffing
plan by skill level, by project phase, and by aggregations of skill levels and project phases.
7
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
8
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
9
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
10
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
5.3.5.2 Meetings.
5.3.5.4 Reviews.
11
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
12
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
13
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
tools required for product acceptance shall be specified in the product acceptance plan. Methods such as
testing, demonstration, analysis, and inspection should be specified in this plan.
14
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
7.3 DOCUMENTATION
IEEE Std 1058-1998 Guidance
(Subclause 7.3) Documentation plan
This subclause shall contain the documentation plan for the project, to include plans for generating non-
deliverable and deliverable work products. Organizational entities responsible for providing input
information, generating, and reviewing the various documents shall be specified in the documentation
plan. The documentation plan should include a list of documents to be prepared, the controlling template
or standard for each document, who will prepare it, who will review it, due dates for review copy and
initial baseline version, and a distribution list for review copies and baseline versions.
15
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
16
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
plan. Additional topics should be added as needed to ensure successful completion of the subcontract. A
reference to the official subcontract and prime contractor/subcontractor points of contact shall be
specified.
17
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
18
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
APPENDICES
IEEE Std 1058-1998 Guidance
Annexes may be included, either directly or by reference to other documents, to provide supporting
details that could detract from the document if included in the body.
General Guidance
In this template, the following appendices are used for reference purposes only. It should not be assumed
that the referenced documents exist as an example.
Appendices -1
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -2
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -3
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -4
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -5
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -6
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -7
[[Project Name]] PMP
[[Document Configuration Identifier]]
[[Date]]
Appendices -8
DOCUMENT CHANGE REQUEST (DCR)
Mailing Address:
Change Location:
(use section #, figure #, table #, etc.)
Proposed change:
Note: For the appropriate authority to take appropriate action on a change request, please provide a clear
description of the recommended change along with supporting rationale.
Send to: Commanding Officer, Space and Naval Warfare Systems Center, Code [[xxx]], 53560 Hull Street, San
Diego, CA 92152-5001
Fax to: indicate appropriate fax number
Email to: indicate appropriate email
Submit online: indicate appropriate URL
DCR Form 1/2009