Page 1 of 6
CONSULTANCY SERVICES FOR THE PROPOSED NEW CARGO PIPEL
Conoil Plc RFQ for consultancy services for the proposed 3nos new cargo pipelines from Waziri jetty to Conoil Apapa s
(i) 2nos x 12"diameter product pipeline each of 2.5km (for PMS/ATK and AGO)
(ii) 1no x 10"diameter product piggable(batch) pipeline of 2.5km (for BASE-OIL)
PROJECT PROJECT PROJECT DELIVERABLES
S/N MILESTONE SCOPE
Provision of Concept and FEED design services
(i) Prposed final pipelines routeselction and ROW,
(ii) Materials selection and wall thickness,
Concept and (iii) Pipelines linesizing,
1 Concept and FEED
FEED review
(iv) Final preliminary hydraulic simulation & pressure/velosity
assessment,
(v)Process requirements set against the minimumfunctional
and design specifications,
(vi) Concept Selection Report.
Obtain Permt To Allow for Application and obtain permit to survey for the
Survey(PTS) proposed pipeline route
(i) Allow for pipeline route survey report & maps
2 Survey
Detailed (ii) Allow for soil investigation and reports
Pipeline route
survey (iii) Built pipeline survey documents(reports,maps and drawings
(iv) Proposed road crossings
Necessary outcome of the Detailed Engineering Design shall
include;
(i) Pipeline process flow simulations to assess internal
flowconditions, pressure and velocity regimes for each
pipelines
(ii)Detailed engineering drawings, showing pipeline plan and
profile (alignment sheets)
Conduct
Detailed (iii) Pipeline mechanica ldesign, PIG alerts/traps, material
3 Engineering Design selection and wall thickness assessment
Engineering
Design (DED) (iv) Detailed road crossing design
(v) Pipeline externalprotection design and calculations
(vi)Detailed material take off (MTO) and specifications for proc
(vii) Pipeline protection design(Cathodicprotection) and
security(anti-theft) design SCADA
Page 2 of 6
Review the
integrity report
on the existing
pipelines from Review pipeline integrity report (pressure/leak test, UTM and
Integrity Report on
MOMAN any other available data) and confirm if they are suitable and
4 existing 5nos cargo
manifold at compactible with the overall integrity requirement of the new
pipelines
PPMC petroleum pipelines for the proposeddesign and servicecondition
jetty to Conoil
Apapa depot.
5 SUB TOTAL
6 ADD 5% V.A.T
7 GRAND TOTAL
CONDITIONS
All###
quotations with work duration should be submitted directly by the vendor/contractor to the office of the Procurement Office in a
sealed envelope.
### should write the following details on the sealed envelope:
Vendors
a. The nature of the Job.
b. The Contractor’s name and phone number(s).
###
Contractors are expected to visit the site to get acquainted to site condition prior to submittion of priced bids
Please Note:
Page 3 of 6
W CARGO PIPELINES FOR PRODUCT
ziri jetty to Conoil Apapa shore tankfarm
RESOURCES DURATION
AMOUNT
DESCRIPTION QTY RATE (DAYS)
(N)
Lead Consultant 1 48,000.00 14 672,000.00
Project Engineer 1 43,200.00 14 604,800.00
ProcessEngineer 1 36,000.00 14 504,000.00
Lead Consultant 1
48,000.00 5 240,000.00
Project Engineer 1 43,200.00 5 216,000.00
Lead Consultant 1
48,000.00 13 624,000.00
Project Engineer 1 43,200.00 13 561,600.00
Lead surveyor 1 43,200.00 14 604,800.00
Surveyor 1 36,000.00 13 468,000.00
Surveyor Assistance 1 28,800.00 13 374,400.00
Lead Consultant 1 48,000.00 40 1,920,000.00
Project Engineer
1 43,200.00 40 1,728,000.00
Process Engineer
1 36,000.00 30 1,080,000.00
Pipeline/Piping Engineer 1 36,000.00
40 1,440,000.00
36,000.00 1,080,000.00
Pipeline Integrity Engineer 1 30
CAD Designer 1 36 1,036,800.00
28,800.00
Page 4 of 6
Pipeline Integrity Engineer 1 36,000.00 14 504,000.00
###
682,920.00
###
ocurement Office in a
PROPOSED FLUID PROPERTIES
PRODUCT BASE-OIL
PMS AGO ATK SN150
PROPERTIES
Density (g/ml) 0.73 - 0.77 0.825 - 0.87 0.775 - 0.84 N/A
Viscosity (cs) N/A N/A N/A 28 - 32.5
Temperature(0C) Ambient temperaure range 24 - 33
Vessel receipt flow
rate @ shore
tanks(m3/hr)
400-500 150
Operating pressure
(Bar) 7.5 - 8
2015 Throughput
Volume (million
Liters)
300 58 65 17.5
OTHERS
Highest tank 22meters
Proposed distance 2.5km
BASE-OIL
SN500 BS150
N/A N/A
92 - 102.5 ˃ 420
range 24 - 33
150 100
17.5