Checklistfor Earthwork

1) The document is an inspection checklist for a final fill inspection of the Haradh & Hawiyah Highway Improvements project in Saudi Arabia. 2) It lists 5 acceptance criteria for structural backfill and common fill compaction, including achieving a minimum dry density percentage as determined by specific testing methods. 3) Upon passing inspection, as-built survey data must be provided to verify grade requirements are met according to design specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views1 page

Checklistfor Earthwork

1) The document is an inspection checklist for a final fill inspection of the Haradh & Hawiyah Highway Improvements project in Saudi Arabia. 2) It lists 5 acceptance criteria for structural backfill and common fill compaction, including achieving a minimum dry density percentage as determined by specific testing methods. 3) Upon passing inspection, as-built survey data must be provided to verify grade requirements are met according to design specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

HHHI-IC NUMBER DATE APPROVED RFI NUMBER

HHHI INSPECTION CHECKLIST


Final Fill Inspection HHHI-IC-0105 Civil
Rev. 0_2017

PROJECT TITLE WER No. CONTRACTOR / SUBCONTRACTOR

Haradh & Hawiyah Highway Improvements - Interchanges &


Airstrip
LOCATION

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME

TIP NUMBER ACTIVITY NUMBER WORK PERMIT REQUIRED?


CHEC-HHHI-TIP-Civ-01-0, Rev.0_2017
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W I

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No.

Structural backfill shall be compacted to a dry density not less than 95%
of the maximum density determined from MRDTM 212 for cohesive MOT Sec 2.09.5,
A1
materials or 74% of relative density determined from MRDTM 214 for 2.05.4.3
cohesiveless materials when compactible material is used.

When materials such as concrete coarse aggregate is used, it shall be


A2 consolidated with 2 passes of mechanical vibratory or plate compaction MOT Sec 2.09.5
equipment.

All layers of bedding material and trench backfill material shall be


MOT Sec
compacted to a dry density not less than 90% of the maximum density
A3 2.10.2.5,
determined from MRDTM 212 for cohesive materials or 70% of relative
2.05.4.3
density determined from MRDTM 214 for cohesiveless materials.

Compacted density of the common fill shall be equal or greater than


ninety percent (90%) of Maximum Density determined from MRDTM 212
A4 MOT 2.05.4.3
for cohesive materials or seventy percent (70%) of Relative Density
determined from MRDTM 214 for cohesiveless materials

Backfilling shall extend to the original ground or to the top elevation of


A5 MOT Sec 2.09.4
any embankment, in-place or to be placed.

REMARKS:
Provide final survey report showing compliance to applicable design final grade requirements.

REFERENCE DOCUMENTS:
1- MOT General Specifications Section 2.05 Embankment

2- MOT General Specifications Section 2.09 Structual Excavation and Backfill

3- MOT General Specifications Section 2.10 Trench Excavation and Backfill

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Name, Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1