SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
GENSET SIZING CALCULATION
TABLE OF CONTENT
1. SCOPE
2. REFERENCE
3. BASIC CALCULATION
4. GENSET SIZING CALCULATION - SEMBERAH STATION
5. GENSET SIZING CALCULATION - SAMBUTAN STATION
6. GENSET SIZING CALCULATION - BINANGAT JUNCTION
7. GENSET SIZING CALCULATION - TANJUNG BATU METERING STATION
8. CONCLUSION
ATTACHMENT-1 LOAD LIST CALCULATION - SEMBERAH STATION
ATTACHMENT-2 LOAD LIST CALCULATION - SAMBUTAN STATION
ATTACHMENT-3 LOAD LIST CALCULATION - BINANGAT JUNCTION
ATTACHMENT-4 LOAD LIST CALCULATION - TANJUNG BATU METERING STATION
PT. Semberani Persada Oil Page 3 of 13 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
PT. Semberani Persada Oil Page 3 of 13 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
1. SCOPE
This calculation covers the minimum of Gas Engine Genset ( GEG ) and Disel Engine Genset ( DEG )
capacity required for Surface Production Facility - Semberah Field Project at Semberah Station,
Sambutan Station, Binangat Junction and Tanjung Batu Metering Station, East Kalimantan, Indonesia.
2. REFERENCE
The calculation references is:
SMC-SEM-EL6-001-A3 Single Line Diagram - Semberah Station
SMC-SAM-EL6-001-A3 Single Line Diagram - Sambutan Station
SMC-BIN-EL6-001-A3 Single Line Diagram - Binangat Junction
SMC-TJB-EL6-001-A3 Single Line Diagram - Tanjung Batu Metering Station
SMC-ALL-EL3-004-A4 Calculation - Electrical Load List
3. BASIC CALCULATION
The calculation is carried out to verify :
- Required power for continuous operation of the normal load.
- Total required power at the time of the biggest motor start.
Following designation are used: S: Apparent power [ VA ]
P: Active power [ W ]
Cos Ø : Power factor
η: Efficiency
Pmts : Motor starting VA = Smotor x 6
SB : Total VA of base load
ST : Total required VA during motor group starting
4. GENSET SIZING CALCULATION - SEMBERAH STATION
4.1 GAS ENGINE GENERATOR
4.1.1 Maximum load after motor steady state Pmax = 33.66 kVA
4.1.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
Pbase = 14.78 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 14.78 x ( 0.8 + 0.6 )
PT. Semberani Persada Oil Page 4 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
SB = 11.83 + j 8.87
4.1.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
4.1.4 Total kVA is:
ST = SB + S M
= ( 13.23 + 35.00 ) + j ( 9.92 + 110.83 )
= 46.83 + j 119.70
ST = 128.53 kVA
4.1.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
128.53 / 1.5 = 85.69 kVA
4.2 DIESEL ENGINE GENERATOR
4.2.1 Maximum emergency load after motor steady state Pmax = 32.16 kVA
4.2.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
Pbase = 13.28 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
PT. Semberani Persada Oil Page 5 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
= 13.28 x ( 0.8 + 0.6 )
SB = 10.63 + j 7.97
4.1.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
4.1.4 Total kVA is:
ST = SB + S M
= ( 12.67 + 27.50 ) + j ( 9.50 + 87.08 )
= 45.63 + j 118.80
ST = 127.26 kVA
4.1.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
127.26 / 1.5 = 84.84 kVA
5. GENSET SIZING CALCULATION - SAMBUTAN STATION
5.1 GAS ENGINE GENERATOR
5.1.1 Maximum load after motor steady state Pmax = 36.06 kVA
5.1.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
Pbase = 17.19 kVA
Average value of power factor is assumed as :
PT. Semberani Persada Oil Page 6 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 17.19 x ( 0.8 + 0.6 )
SB = 13.75 + j 10.31
5.1.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
5.1.4 Total kVA is:
ST = SB + S M
= ( 13.75 + 35.00 ) + j ( 10.31 + 110.83 )
= 48.75 + j 121.15
ST = 130.59 kVA
5.1.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
130.59 / 1.5 = 87.06 kVA
5.2 DIESEL ENGINE GENERATOR
5.2.1 Maximum emergency load after motor steady state Pmax = 34.19 kVA
5.2.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
Pbase = 14.06 kVA
Average value of power factor is assumed as :
PT. Semberani Persada Oil Page 7 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 14.06 x ( 0.8 + 0.6 )
SB = 11.25 + j 8.44
5.2.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
5.2.4 Total kVA is:
ST = SB + S M
= ( 11.25 + 35.00 ) + j ( 8.44 + 110.83 )
= 46.25 + j 119.27
ST = 127.92 kVA
5.2.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
127.92 / 1.5 = 85.28 kVA
6. GENSET SIZING CALCULATION - BINANGATJUNCTION
6.1 GAS ENGINE GENERATOR
6.1.1 Maximum load after motor steady state Pmax = 41.72 kVA
6.1.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
PT. Semberani Persada Oil Page 8 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
Pbase = 19.38 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 19.38 x ( 0.8 + 0.6 )
SB = 15.50 + j 11.63
6.1.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
6.1.4 Total kVA is:
ST = SB + S M
= ( 18.28 + 35.00 ) + j ( 13.71 + 110.83 )
= 50.50 + j 122.46
ST = 132.46 kVA
6.1.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
132.46 / 1.5 = 88.31 kVA
6.2 DIESEL ENGINE GENERATOR
6.2.1 Maximum emergency load after motor steady state Pmax = 39.47 kVA
6.2.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
Pbase = Pmax - P motor
PT. Semberani Persada Oil Page 9 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
Pbase = 14.00 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 14.00 x ( 0.8 + 0.6 )
SB = 11.20 + j 8.40
6.2.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 14 x 6 / ( 0.8 x 0.90 )
= 116.67 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 116.7 x ( 0.3 + 0.95 )
SM = 35.00 + j 110.83
6.2.4 Total kVA is:
ST = SB + S M
= ( 13.58 + 35.00 ) + j ( 10.18 + 110.83 )
= 46.20 + j 119.23
ST = 127.87 kVA
6.2.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
127.87 / 1.5 = 85.25 kVA
7. GENSET SIZING CALCULATION - TANJUNG BATU METERING STATION
7.1 PLN TANJUNG BATU
7.1.1 Maximum load after motor steady state Pmax = 18.73 kVA
7.1.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
voltage dip of operating generator.
PT. Semberani Persada Oil Page 10 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
Pbase = Pmax - P motor
Pbase = 7.98 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 7.98 x ( 0.8 + 0.6 )
SB = 6.39 + j 4.79
7.1.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 7.5 x 6 / ( 0.8 x 0.90 )
= 62.50 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 62.50 x ( 0.3 + 0.95 )
SM = 18.75 + j 59.38
7.1.4 Total kVA is:
ST = SB + S M
= ( 6.39 + 27.50 ) + j ( 4.79 + 87.08 )
= 25.14 + j 64.16
ST = 68.91 kVA
7.1.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
68.91 / 1.5 = 45.94 kVA
7.2 DIESEL ENGINE GENERATOR
7.2.1 Maximum emergency load after motor steady state Pmax = 17.73 kVA
7.2.2 Before motor started, the load condition represents a base load.
This load can be defined from maximum load without biggest motor will contribute in
PT. Semberani Persada Oil Page 11 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
voltage dip of operating generator.
Pbase = Pmax - P motor
Pbase = 6.98 kVA
Average value of power factor is assumed as :
Cos Ø = 0.8 Sin Ø = 0.6
SB = P base x ( Cos Ø + Sin Ø )
= 6.98 x ( 0.8 + 0.6 )
SB = 5.59 + j 4.19
7.2.3 During motor starting
Starting power factor is assumed as :
Cos Ø = 0.3 Sin Ø = 0.95
Average value of full load power factor and efficiency are assumed as :
Cos Ø = 0.8
η = 0.90
Starting motor power :
Pmts = 7.5 x 6 / ( 0.8 x 0.90 )
= 62.50 kVA
SM = P mts x ( Cos Ø + Sin Ø )
= 62.50 x ( 0.3 + 0.95 )
SM = 18.75 + j 59.38
7.2.4 Total kVA is:
ST = SB + S M
= ( 5.59 + 27.50 ) + j (4.19 + 87.08 )
= 24.34 + j 63.56
ST = 68.06 kVA
7.2.5 Minimum required capacity
( with momentary exess factor 1.5 p.u., for 15 sec.)
68.06 / 1.5 = 45.38 kVA
8. CONCLUSION
From the calculation of genset sizing above, it can be conclude as follow :
8.1 Semberah Station
PT. Semberani Persada Oil Page 12 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
The minimum required of electrical power for normal operation at Gas field facility is 85.69 kVA.
The required of electrical power for normal operation at Oil field facility is 50 kVA.
The capacity of Gas Engine Generator will be installed is 150 kVA, it means that generator
can cover electrical load of Oil and Gas field facility.
The minimum required of electrical power for emergency operation is 84.84 kVA. The capacity
The capacity of existing Diesel Engine Generator should be not less than 84.84 kVA.
8.2 Sambutan Station
The minimum required of electrical power for normal operation is 87.06 kVA.
The capacity of Gas Engine Generator will be installed is 100 kVA, it means that generator
can cover electrical load.
The minimum required of electrical power for emergency operation is 85.28 kVA.
The capacity of Diesel Engine Generator chosen to be installed is 100 kVA.
8.3 Binangat Junction
The minimum required of electrical power for normal operation is 90.30 kVA.
The capacity of Gas Engine Generator will be installed is 100 kVA, it means that generator
can cover electrical load.
The minimum required of electrical power for emergency operation is 86.93 kVA.
The capacity of Diesel Engine Generator chosen to be installed is 100 kVA.
8.4 Tanjung Batu Metering Station
The minimum required of electrical power for normal operation is 45.94 kVA.
The capacity of electrical power supplied by PLN Tanjung Batu should not be less than 50 kVA.
The minimum required of electrical power for emergency operation is 45.38 kVA. The capacity
The capacity of Diesel Engine Generator chosen to be installed is 62.5 kVA.
PT. Semberani Persada Oil Page 13 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
sheet 1
PT. Semberani Persada Oil Page 14 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
sheet 2
PT. Semberani Persada Oil Page 15 of 24 Genset Sizing Calculation
439702829.xls
SURFACE PRODUCTION FACILITY - SEMBERAH FIELD
sheet 3
PT. Semberani Persada Oil Page 16 of 24 Genset Sizing Calculation
439702829.xls
ATTACHMENT - 1
LOAD LIST CALCULATION
SEMBERAH STATION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
1 PANEL SEM-LP-01 ( AIR COMPR. SHELTER )
LIGHTING 2 ( WORKSHOP & AIR COMPR. ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE ( WORKSHOP ) 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 5 1.0 0 0 0 0 5,000 6,250 0.1 500 625
2 PANEL SEM-LP-03 ( SLEEPING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
3 PANEL SEM-LP-04 ( DINING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
4 PANEL SEM-LP-06 ( OUTDOOR LIGHTING )
LIGHTING 0.8 250 313 5 1.0 0 0 1,250 1,563 0 0 0.5 625 781 625 781
SPARE 0.8 1,000 1,250 4 1.0 0 0 0 0 4,000 5,000 0.1 400 500 400 500
5 PANEL SEM-LP-07 ( GUARD HOUSE )
LIGHTING 0.8 80 100 1 1.0 80 100 0 0 0 0 1.0 80 100 80 100
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 1 1.0 0 0 0 0 1,000 1,250 0.1 100 125
6 PANEL FLARE IGNITION
FLARE IGNITION 0.8 2,000 2,500 1 1.0 2,000 2,500 0 0 0 0 1.0 2,000 2,500 2,000 2,500
Page 17 of 24 ktm, semberah
ATTACHMENT - 1
LOAD LIST CALCULATION
SEMBERAH STATION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
7 MOTOR
AIR COMPRESSOR SEM-C-01A 0.8 14,000 17,500 1 1.0 14,000 17,500 0 0 0 0 1.0 14,000 17,500
AIR COMPRESSOR SEM-C-01B 0.8 14,000 17,500 1 1.0 0 0 0 0 0 0 1.0 0 0 14,000 17,500
CLEAN WATER PUMP SEM-P-04 0.8 1,100 1,375 1 1.0 1,100 1,375 0 0 0 0 1.0 1,100 1,375 1,100 1,375
24,660 30,825 1,330 1,663 16,000 20,000 26,925 33,656 25,725 32,156
24,660 W 1,330 W 16,000 W
Total Continuous Load Total Intermittent Load Total Standby Load
30,825 VA 1,663 VA 20,000 VA
25,325 W
Normal load
31,656 VA
26,925 W
Peak load
33,656 VA
25,725 W
Emergency load
32,156 VA
Page 18 of 24 ktm, semberah
ATTACHMENT - 2
LOAD LIST CALCULATION
SAMBUTAN STATION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
1 PANEL SAM-LP-01 ( GENSET SHELTER )
LIGHTING 1 ( GENSET ROOM ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
LIGHTING 2 ( WORKSHOP & AIR COMPR. ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE ( WORKSHOP ) 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 5 1.0 0 0 0 0 5,000 6,250 0.1 500 625
2 PANEL SAM-LP-03 ( SLEEPING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
3 PANEL SAM-LP-04 ( DINING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
4 PANEL SAM-LP-05 ( GUARD HOUSE )
LIGHTING 0.8 80 100 1 1.0 80 100 0 0 0 0 1.0 80 100 80 100
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 1 1.0 0 0 0 0 1,000 1,250 0.1 100 125
5 PANEL SAM-LP-06 ( FIRE PUMP SHELTER )
LIGHTING 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
6 PANEL SAM-LP-07 ( OUTDOOR LIGHTING )
LIGHTING 0.8 250 313 10 1.0 0 0 2,500 3,125 0 0 0.5 1,250 1,563 1,250 1,563
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375 300 375
7 PANEL FLARE IGNITION
FLARE IGNITION 0.8 2,000 2,500 1 1.0 2,000 2,500 0 0 0 0 1.0 2,000 2,500 2,000 2,500
Page 19 of 24 ktm, sambutan
ATTACHMENT - 2
LOAD LIST CALCULATION
SAMBUTAN STATION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
8 MOTOR
AIR COMPRESSOR SAM-C-01A 0.8 14,000 17,500 1 1.0 14,000 17,500 0 0 0 0 1.0 14,000 17,500
AIR COMPRESSOR SAM-C-01B 0.8 14,000 17,500 1 1.0 0 0 0 0 0 0 1.0 0 0 14,000 17,500
POND WATER PUMP SAM-P-05 0.8 1,100 1,375 1 1.0 1,100 1,375 0 0 0 0 1.0 1,100 1,375 1,100 1,375
25,760 32,200 2,580 3,225 18,000 22,500 28,850 36,063 27,350 34,188
25,760 W 2,580 W 18,000 W
Total Continuous Load Total Intermittent Load Total Standby Load
32,200 VA 3,225 VA 22,500 VA
27,050 W
Normal load
33,813 VA
28,850 W
Peak load
36,063 VA
27,350 W
Emergency load
34,188 VA
Page 20 of 24 ktm, sambutan
ATTACHMENT - 3
LOAD LIST CALCULATION
BINANGAT JUNCTION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
1 PANEL BIN-LP-01 ( GENSET SHELTER )
LIGHTING 1 ( GENSET ROOM ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
LIGHTING 2 ( WORKSHOP & AIR COMPR. ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE ( WORKSHOP ) 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 5 1.0 0 0 0 0 5,000 6,250 0.1 500 625
2 PANEL BIN-LP-03 ( SLEEPING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
3 PANEL BIN-LP-04 ( DINING ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 3 1.0 240 300 0 0 0 0 1.0 240 300 240 300
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 1 1.0 0 0 40 50 0 0 0.5 20 25 20 25
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
4 PANEL BIN-LP-05 ( GUARD HOUSE )
LIGHTING 0.8 80 100 1 1.0 80 100 0 0 0 0 1.0 80 100 80 100
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 1 1.0 0 0 0 0 1,000 1,250 0.1 100 125
6 PANEL BIN-LP-06 ( FIRE PUMP SHELTER )
LIGHTING 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
5 PANEL BIN-LP-07 ( OUTDOOR LIGHTING )
LIGHTING 0.8 250 313 19 1.0 0 0 4,750 5,938 0 0 0.5 2,375 2,969 2,375 2,969
SPARE 0.8 1,000 1,250 4 1.0 0 0 0 0 4,000 5,000 0.1 400 500 400 500
6 PANEL BIN-LP-08 ( GAS COMPR. SHELTER )
LIGHTING 0.8 150 188 8 1.0 1,200 1,500 0 0 0 0 1.0 1,200 1,500 1,200 1,500
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 2 1.0 0 0 0 0 2,000 2,500 0.1 200 250
Page 21 of 24 ktm, binangat
ATTACHMENT - 3
LOAD LIST CALCULATION
BINANGAT JUNCTION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
7 PANEL BIN-LP-09 ( WAREHOUSE )
LIGHTING 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE 0.8 500 625 1 1.0 500 625 0 0 0 0 1.0 500 625 500 625
SPARE 0.8 1,000 1,250 1 1.0 0 0 0 0 1,000 1,250 0.1 100 125
8 PANEL FLARE IGNITION
FLARE IGNITION 0.8 2,000 2,500 1 1.0 2,000 2,500 0 0 0 0 1.0 2,000 2,500 2,000 2,500
9 MOTOR CONTROL CENTER
AIR COMPRESSOR BIN-C-02A 0.8 14,000 17,500 1 1.0 14,000 17,500 0 0 0 0 1.0 14,000 17,500
AIR COMPRESSOR BIN-C-02B 0.8 14,000 17,500 1 1.0 0 0 0 0 0 0 1.0 0 0 14,000 17,500
POND WATER PUMP BIN-P-06 0.8 1,100 1,375 1 1.0 1,100 1,375 0 0 0 0 1.0 1,100 1,375 1,100 1,375
28,760 35,950 4,830 6,038 22,000 27,500 33,375 41,719 31,575 39,469
28,760 W 4,830 W 22,000 W
Total Continuous Load Total Intermittent Load Total Standby Load
35,950 VA 6,038 VA 27,500 VA
31,175 W
Normal load
38,969 VA
33,375 W
Peak load
41,719 VA
31,575 W
Emergency load
39,469 VA
Page 22 of 24 ktm, binangat
ATTACHMENT - 4
LOAD LIST CALCULATION
TANJUNG BATU METERING STATION
PROJECT : SURFACE PRODUCTION FACILITY - SEMBERAH FIELD REVISION : 1
OWNER : PT. SEMBERANI PERSADA OIL ( SEMCO ) BY : KTM
CLIENT : PT. JAYA WIJAYA RAYA
LOCATION : EAST KALIMANTAN
TOTAL CONNECTED LOAD CAPACITY TOTAL EMERGENCY
LOAD CAPACITY QTY EFF. TOTAL LOAD DEMAND
NO DESCRIPTION PF CONTINUOUS INTERMITTENT STAND BY DF LOAD
W VA EA W VA W VA W VA W VA W VA
1 PANEL TJB-LP-01 ( GENSET SHELTER )
LIGHTING 1 ( GENSET ROOM ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
LIGHTING 2 ( WORKSHOP & AIR COMPR. ) 0.8 150 188 2 1.0 300 375 0 0 0 0 1.0 300 375 300 375
RECEPTACLE ( WORKSHOP ) 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 5 1.0 0 0 0 0 5,000 6,250 0.1 500 625
2 PANEL TJB-LP-02 ( CONTROL / OFFICE ROOM )
AIR CONDITIONER 0.8 750 938 2 1.0 1,500 1,875 0 0 0 0 1.0 1,500 1,875 1,500 1,875
EXHAUST FAN 0.8 100 125 1 1.0 100 125 0 0 0 0 1.0 100 125 100 125
LIGHTING 1 0.8 80 100 4 1.0 320 400 0 0 0 0 1.0 320 400 320 400
LIGHTING 2 ( OUTSIDE ) 0.8 40 50 2 1.0 0 0 80 100 0 0 0.5 40 50 40 50
RECEPTACLE 0.8 500 625 2 1.0 1,000 1,250 0 0 0 0 1.0 1,000 1,250 1,000 1,250
SPARE 0.8 1,000 1,250 3 1.0 0 0 0 0 3,000 3,750 0.1 300 375
3 PANEL TJB-LP-03 ( OUTDOOR LIGHTING )
LIGHTING 0.8 250 313 5 1.0 0 0 1,250 1,563 0 0 0.5 625 781 625 781
SPARE 0.8 1,000 1,250 4 1.0 0 0 0 0 4,000 5,000 0.1 400 500 400 500
4 MOTOR CONTROL CENTER
AIR COMPRESSOR TJB-C-01A 0.8 7,500 9,375 1 1.0 7,500 9,375 0 0 0 0 1.0 7,500 9,375
AIR COMPRESSOR TJB-C-01B 0.8 7,500 9,375 1 1.0 0 0 0 0 0 0 1.0 0 0 7,500 9,375
POND WATER PUMP BIN-P-06 0.8 1,100 1,375 1 1.0 1,100 1,375 0 0 0 0 1.0 1,100 1,375 1,100 1,375
13,120 16,400 1,330 1,663 12,000 15,000 14,985 18,731 14,185 17,731
13,120 W 1,330 W 12,000 W
Total Continuous Load Total Intermittent Load Total Standby Load
16,400 VA 1,663 VA 15,000 VA
13,785 W
Normal load
17,231 VA
14,985 W
Peak load
18,731 VA
14,185 W
Emergency load
17,731 VA
Page 23 of 24 ktm, tanjungbatu
555.5556 694.4444
3.625
3.222222 27.5
24.44444
49.67