Serial Job No Date Machine No Line Limit Day Description: Job Control 2011 Priorit Y

The document is a job control log listing various cleaning and maintenance tasks to be completed by January 29, 2011 at a plant. It includes 16 jobs with details of the date, machine, line, priority level, completion deadline, craft needed, and brief description of the work. The jobs involve cleaning accumulated dust, material and debris from various areas of the plant to prevent issues like belt damage, clogging, and decreased efficiency. Tasks also include relining an area, replacing nozzles, and removing blocked material.

Uploaded by

AmR Zaki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views2 pages

Serial Job No Date Machine No Line Limit Day Description: Job Control 2011 Priorit Y

The document is a job control log listing various cleaning and maintenance tasks to be completed by January 29, 2011 at a plant. It includes 16 jobs with details of the date, machine, line, priority level, completion deadline, craft needed, and brief description of the work. The jobs involve cleaning accumulated dust, material and debris from various areas of the plant to prevent issues like belt damage, clogging, and decreased efficiency. Tasks also include relining an area, replacing nozzles, and removing blocked material.

Uploaded by

AmR Zaki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB CONTROL 2011

PRIORIT
SERIAL JOB NO DATE MACHINE NO LINE LIMIT DAY CRAFT DESCRIPTION
Y

1/1/2011 1/7/2011 Clean out the accumelated dust and material beside blower also old
4 4 361.070 Line'I' B P belt and wood on the room.

6 6 1/1/2011 361.080 Line'I' B 1/7/2011 P Clean out the accumelated material under fan for air slide.

1/1/2011 1/7/2011 Remove the accumelated material over CF Silo and around the
7 7 361.030 Line'I' B P filter 361.020 .

clean out the material accumelated between the belt convayor and
43 43 1/5/2011 481.300 Line'I' A 1/5/2011 P the concrete building of additives hopper to prevent the belt
damage.
Clean out the accumelated material around the belt and under the
66 66 1/8/2011 481BC610 Line'II' B 14/1/2011 P feeding chutes to prevent material accumelation and stacking at the
iddlers.

1/16/2011 1/20/2011 Relining the exposed area front roller No 1,3 also under air seal
116 116 341.020 Line'I' B P tube by denist casting.

1/16/2011 1/22/2011 Clean and remove all the accumelated and participated
128 128 481SL100 Line'II' B P materialabove the clinker silo.

Clean and remove the accumelated and participated material and


133 133 1/16/2011 761.010 Line'I' B 1/22/2011 P mud which serrounding and over the external grill causes
decreases in Cooling efficiency.

1/20/2011 1/26/2011 Clean out the accumelated material between ladder for sand
173 173 312BC200 Line'II' B P 312BC200,312BC300

191 191 1/21/2011 133.060 Line'I' B 1/23/2011 P Remove material at that Bc 5m after the chute that block the way

1/23/2011 1/29/2011 10 gas nozzles for PC with hoses and connection to replace the oil
206 206 431.100 Line'I' B P nozzle in both line I,II .
STATUS

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished