JHA No. 06, Manual Excavation and Instalasi Formwork For Barier Pole Dan Concrete Slab Hydrant

The document is a job hazard analysis for manual excavation, formwork installation, wiremesh/rebar installation, and concrete pouring for a fire hydrant area. It identifies potential hazards such as misunderstandings, incomplete documents, tool failures, heat stress, damaged PPE, tripping, injuries, and being hit by equipment. To control risks, it requires reviewing documents, communicating work plans, using proper PPE, maintaining a safe work area, and paying attention during tasks. The analysis rates initial risks as medium and residual risks as low after implementing the listed control measures.

Uploaded by

Darmawan Onrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views4 pages

JHA No. 06, Manual Excavation and Instalasi Formwork For Barier Pole Dan Concrete Slab Hydrant

The document is a job hazard analysis for manual excavation, formwork installation, wiremesh/rebar installation, and concrete pouring for a fire hydrant area. It identifies potential hazards such as misunderstandings, incomplete documents, tool failures, heat stress, damaged PPE, tripping, injuries, and being hit by equipment. To control risks, it requires reviewing documents, communicating work plans, using proper PPE, maintaining a safe work area, and paying attention during tasks. The analysis rates initial risks as medium and residual risks as low after implementing the listed control measures.

Uploaded by

Darmawan Onrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

JHA No : 2019/01504JHA

JOB HAZARD ANALYSIS (JHA) Risk Assessment Tier (RAT 1) PREPARED BY : ANDRY SASTRAWAN
PTW REFERENCE : 2019/01504SWP DATE/TIME PREPARED : 03/05/2019 – 10:48
UNIT/EQUIPMENT : Palu Kuningan, Palu 5 kg, Gergaji, Gunting Besi, Linggis, Sekop, Pacul, Waterpass (Autolevel) APPROVED BY : ANDRI SASTRAWAN
LOCATION : PLANT OFFSITE DATE/TIME APPROVED : 03/05/2019 – 16:30
WORK : Manual Excavation, Instalasi Formwork, Wiremesh/Rebar and Pouring Concrete for barier pole and concrete PAGE 1 OF 4
slab Fire Hydrant Area Condensate Tank
Safety Representative Signature:

MACHINE/EQUIPMENT INITIAL RESIDUAL


NO JOB S TEP TOOL INVOLVED POTENTIAL HAZARD/LOSS RISK RISK CONTROL MEASURES RISK REMARKS
IN EACH STEP (H,M,L) (H,M,L)
1  P e r s i a p a n dokumen kerja, material  Penanganan secara  Kesalahpahaman/ M  Semua dokumen pekerjaan telah disetujui (CMS, L
dan peralatan kerja/ manual/Handling Misunderstanding Drawing & Plot, JHA, PTW ) dan harus berada di
Preparation of work documents, manually  Dokumen kurang lengkap/ lokasi kerja / All work documents have been approved
materials and work equipment Document incomplete (CMS, Drawing & Plot, JHA, PTW ) and must be on
 Kegagalan fungsi alat/ Tool failure the job site
 Terserang panas/dehidrasi/ Heat  Semua pekerja harus mengikuti TBM / All workers
stress / dehydration must attend Toolbox Meeting
 Alat pelindung diri tidak cukup dan  Laporkan dan deskripsikan pekerjaan yang akan
rusak/ Insufficient and damaged dilakukan / Report and describe the work to be done.
personal protective equipment  Komunikasikan segala sesuatunya dengan pengawas
 Tersandung, terpeleset dan dan pihak-pihak terkait / Communicate everything with
tergores/ Tripping, slipping and supervisors and related parties
scratching  Persiapkan dokumen pekerjaan dan safety sesuai
 Cidera pada tangan/ Hand injuries dengan aturan yang berlaku / Prepare work documents
 Cidera tulang belakang/ Back and safety in accordance with applicable rules.
bone injuries  Pelajari dan implementasikan semua aturan yang
 Terjepit/Pinched berlaku / Learn and implement all applicable rules.
 Tertabrak truk Krane /Hit by a  Pastikan alat sudah diinspeksi dan dalam kondisi
truck Mobile Crane (TMC) layak pakai / Ensure the tool has been inspected and
 Tertimpah Material / Downfall of is in good condition.
material  Pastikan kondisi tubuh fit / Ensure the body condition
is fit.
 Cukup minum dan ketersediaan air minum / Sufficient
drinking and availability of drinking water
 Pastikan APD cukup dan dalam kondisi layak pakai/
Ensure that PPE is sufficient and is in a condition
suitable for use
 Gunakan APD yang sesuai (Helm safety dengan tali
dagu, kacamata safety, sarung tangan dan sepatu
safety dan coverall) / Use the appropriate PPE (safety
helmet with chin strap, safety glasses, hand gloves
and safety shoes and coverall)
 Cek area kerja dan pastikan tidak licin dan tidak ada
benda atau material yang berserakan dan menjadi
bahaya sandungan / Check the work area and make
sure it is not slippery and there are no objects or
materials that are scattered and become a danger of
stumbling.
 Memperhatikan posisi tubuh yang baik saat bekerja /
Pay attention to good body position while working.

1
MACHINE/EQUIPMENT INITIAL RESIDUAL
NO JOB S TEP TOOL INVOLVED POTENTIAL HAZARD/LOSS RISK RISK CONTROL MEASURES RISK REMARKS
IN EACH STEP (H,M,L) (H,M,L)
 Pekerja perlu menjaga kewaspadaan yang konstan
akan kaki mereka sehubungan dengan benda yang
dipindahkan dan menghindari menempatkannya di
bawah bahan / W orkers need to maintain constant
awareness of their feet in relation to objects being
moved and avoid placing them under materials.
 Penanganan secara tidak melebihi 20 Kg/orang
/ handling not exceeding 20 kg / person.
 Pekerja yang lain dilarang mendekati mobil krane saat
melintas atau mundur / Other workers are prohibited
from approaching the crane when passing or retreating
 Hanya Operator T ruk Mobill krane yang bisa
mengoperasikan T r u k Mobile Kran / Only the Truck
Mobill Crane operator can operate the Truck Mobile
Crane.
2  Menggali manual dan  Linggis, Pacul, Sekop,  Cidera pada tangan/Hand injuries M  Semua peralatan yang digunakan harus layak dan L
mengangkut material galian/ Gerobak/Crowbar, Hoe,  Cidera tulang belakang/Back telah lolos inspeksi keselamatan / All equipment used
Manual Excavation and Hauling Shovel,and Cart bone injuries must be feasible and have passed safety inspection.
material excavation  Cidera kaki/ Foot injuries.  Perhatikan posisi tubuh yang baik saat bekerja/Pay
 Cidera Mata/ Eye injuries. attention to good body position while working.
 Terserang panas/ Heat stress  Memenuhi kebutuhan minum minimal 2 liter per
 Kerusakan pada layanan bawah hari/Meet the drinking needs of at least 2 liters per day
tanah / di atas tanah (seperti  Penggunaan APD yang sesuai (Kaca mata safety,
saluran kabel, kabel, dll) jika pelindung wajah, sarung tangan, helmet, dan sepatu
galian lebih dari 10 cm/ safety)/use of appropriate PPE (safety
 Damage to underground glasses,faceshield, gloves, helmet, and safety shoes).
/aboveground Services  Periksa layanan bawah tanah / atas tanah melalui
(suchpipeline, cables etc) if gambar dan detektor logam jika galian lebih dari 10
excavation is more than 10 cm. cm/Check for underground / aboveground services
throughmetal detectors amd drawing if excavation is
more than 10 cm.
 Penanganan secara tidak melebihi 20 Kg/orang/
handling not exceeding 20 kg / person
 Pekerja perlu menjaga kewaspadaan yang konstan
akan kaki mereka sehubungan dengan benda yang
dipindahkan dan menghindari menempatkannya di
bawah bahan./W orkers need to maintain constant
awareness of their feet in relation to objects being
moved and avoid placing them under materials.
3 Pekerjaan Bekisting / Formwork:  Palu Kuningan, Palu 5  Cidera pada tangan/Hand injuries M  Semua peralatan yang digunakan harus layak dan L
 P e n g u k u r a n Material Bekisting/ kg, Gergaji, Mistar  Cidera tulang belakang/Back telah lolos inspeksi keselamatan / All equipment used
Measurement of Formwork Material W aterpass, bone injuries must be feasible and have passed safety inspection.
 Pemotongan material sesuai Meteran/Brass hammer,  Cidera kaki/ Foot injuries  Pada Zona Merah harus menggunakan Palu kuningan
dengan kebutuhan/Cutting material hammer 5 kg, saw for  Tertusuk benda tajam/ Pierced saat menancapkan paku / In the Red Zone you have
according to needs wood, crossbar sharp objects. to use a brass hammer when you plug nails
 Memasang/merangkai waterpass, measure  Terserang panas/ Heat stress.  Semua pekerja harus kompeten dalam melakukan
bekisting/Instalation Formwork tape  Percikan Palu/Spark Hammer. pekerjaan ini / All workers must be competent in doing
 Cedera mata/Eye injuries this work
 Pekerja harus memperhatikan posisi dan
keseimbangan tubuh untuk menjaga ergonomic yang
baik/ W orkers must pay attention to the position and
balance of the body to maintain good ergonomics.

2
MACHINE/EQUIPMENT INITIAL RESIDUAL
NO JOB S TEP TOOL INVOLVED POTENTIAL HAZARD/LOSS RISK RISK CONTROL MEASURES RISK REMARKS
IN EACH STEP (H,M,L) (H,M,L)
 Kerusakan pada layanan bawah M  Jauhkan penempatan kaki disaat menggergaji/Keep L
tanah / di atas tanah (seperti the foot placement when sawing.
saluran kabel, kabel, dll) jika  Pekerja yang lain dilarang berada didepan pekerja
menancapkan patok lebih dari 10 yang sedang memaku / Other workers are prohibited
cm/ from being in front of workers who are nailing.
Damage to underground  Paku harus di tempatkan pada satu wadah agar tidak
/aboveground Services berserakan / The nail must be placed in one container
(suchpipeline, cables etc) if stick so that it is not scattered.
the stake is more than 10 cm.  Periksa layanan bawah tanah / atas tanah melalui
gambar dan detektor logam jika galian lebih dari 10
cm / Check for underground / aboveground services
throughmetal detectors amd drawing if excavation is
more than 10 cm.
 Penanganan secara tidak melebihi 20
Kg/orang/handling not exceeding 20 kg / person
 Pekerja perlu menjaga kewaspadaan yang konstan
akan kaki mereka sehubungan dengan benda yang
dipindahkan dan menghindari menempatkannya di
bawah bahan / W orkers need to maintain constant
awareness of their feet in relation to objects being
moved and avoid placing them under materials.
 Gunakan APD yang sesuai (Helm safety dengan tali
dagu, kacamata safety, sarung tangan dan sepatu
safety, coverall) / Use the appropriate PPE (safety
helmet with chin strap, safety glasses, hand gloves
and safety shoes)
4 Pekerjaan pembesian:  Pengikat besi dan  Cidera pada tangan/Hand injuries M  Semua peralatan yang digunakan harus layak dan L
 Perakitan besi / Iron Installation, gunting besi / Iron  Cidera tulang belakang/Back telah lolos inspeksi keselamatan dengan tagging
 Pemotongan besi / Iron cutting binder and iron scissors bone injuries biru/All equipment used must be feasible and have
 Cidera kaki/ Foot injuries passed safety inspection with blue tagging.
 Tertusuk benda tajam/ Pierced  Memperhatikan posisi tubuh yang baik saat
sharp objects. bekerja/Pay attention to good body position while
 Terserang panas/ Heat stress. working.
 Terjepit Gunting/ Pinched  Memposisikan anggota tubuh dengan baik saat
Scissors memotong rebar/Position the limbs well when cutting
rebar.
 Memenuhi kebutuhan minum minimal 2 liter per
hari/Meet the drinking needs of at least 2 liters per
day
 Gunakan APD yang sesuai (Helm safety dengan tali
dagu, kacamata safety, sarung tangan dan sepatu
safety)/ Use the appropriate PPE (safety helmet with
chin strap, safety glasses, hand gloves and safety
shoes)

3
MACHINE/EQUIPMENT INITIAL RESIDUAL
NO JOB S TEP TOOL INVOLVED POTENTIAL HAZARD/LOSS RISK RISK CONTROL MEASURES RISK REMARKS
IN EACH STEP (H,M,L) (H,M,L)
5 Pengecoran/ Pouring Concrete :  Mixer truck, peralatan  Cidera tangan/ Hand injuries M  Pekerja yang terlibat dalam pekerjaan ini harus L
 Concrete mixer truk di kawal masuk tangan (Sekop, cangkul,  Cidera tulang belakang/ Back kompeten/W orkers involved in this work must be
menggunakan Mobil Hilux Double sendok semen) dan bone injuries competent
cabin DN 8891 RF/Concrete mixer penanganan manual  Terjepit/ Pinched  Pekerja harus fokus dan komunikasi dengan baik
truck on escort in uses Hilux Double lainnya/Mixer truck,  Tertabrak truk mixer/Hit by a antara pekerja yang terlibat dalam pekerjaan
cabin Car DN 8891 RF hand tools (Shovels, mixer truck ini/W orkers must focus and good communication
 Memposisikan mixer truck/ Position hoes, cement spoons)  Terkena percikan semen/ between workers involved in this work.
the mixer truck and other manual Exposed to sparks of cement  Sopir truk mixer harus mengikuti instruksi flagman
 Membuka shalow mixer truck/Open handling. saat memposisikan mundur/The mixer truck driver
the shalow mixer truck must follow the flagman instructions when
 Penuangan semen cor ke titik repositioning
pengecoran/Cast cement to the  Flagman harus fokus dan memberi instruksi yang
point casting. aman kepada sopir mixer truk/Flagman must focus
 Menutup shalow mixer truck/Close and give safe instructions to the truck mixer driver.
shalow mixer truck.  Mixer truk harus 100% parkir sebelum menuangkan
 Concrete Mixer truck meninggalkan pengecoran/The truck mixer must be 100% parking
tempat / Concrete Mixer trucks before pouring casting.
leave the place  Pekerja yang lain dilarang mendekat disaat
 Concrete mixer truk di kawal keluar pembukaan shalow semen dan penuangan
menggunakan Mobil Hilux Double pengecoran/Other workers are prohibited from
cabin DN 8891 RF/Concrete mixer approaching when opening cement shalls and casting
truck on escort out uses Hilux concreting
Double cabin Car DN 8891 RF  Titik tumpah penuangan pengecoran harus tepat agar
 Penanganan setelah pengecoran/ tidak terjadi tumpahan kemana-mana dari semen
Handling after casting tersebut/The pouring point of the casting pouring
must be right so that there is no spill everywhere from
the cement
 Hanya menggunakan peralatan manual yang tepat
disaat meratakan tuangan pengecoran/Only use the
right manual equipment when casting casting leveling
 Menghindari terkena percikan semen/Avoid being
exposed to sparks of cement,
 Gunakan APD yang sesuai (Helm safety dengan tali
dagu, kacamata safety, sarung tangan dan sepatu
safety, dan coverall) / Use the appropriate PPE
(safety helmet with chin strap, safety glasses, hand
gloves and safety shoes dan coverall)

6  Pembersihan lokasi Kerja /  Penanganan secara  Terpeleset dan tersandung/ M  Membersihkan dan merapikan peralatan kerja setelah L
Housekeeping manual/ Slipping and tripping aktivitas kerja/ Clean and tidy up work equipment
Manual handling after work activities

7  Keadaan darurat/ Emergency  N/A  Tertimpah material, terjepit M  Tidak panik, matikan semua perlatan mesin, lakukan L Emergency contact number
peralatan, dan tertusuk benda pertolongan pertama sementara secepatnya, ikuti (5555/0461 3120000)
runcing / Material is abundant, rute darurat yang telah di setujui/Don't panic, turn off Muster Point 3
pinched of hand tool, punctured all engine equipment, do first aid as soon as possible,
by pointed objects follow the emergency route that has been approved.
 Memberikan pertolongan pertama dan Evakuasi atau
Hubungi kontak emergency jika terjadi kecelakaan
kerja/Provide first aid and evacuation or contact
emergency contacts in the event of a work accident.

Note : As a guideline to JHA RAT1 Risk Levels the following definitions apply :
H = High Risk : the likely outcome is one or more Fatalities or Property Damage could exceed 5 to 20 MM USD
M = Medium Risk : the likely outcome is one or more Days Away From Work Cases or Property Damage could exceed 500k to 5 MM USD 4
L = Low Risk : the likely outcome is one or more First Aid Cases or Property Damage would not exceed 500k USD