This document lists 98 recommended practices documents published by AACE International related to project cost estimating, project scheduling, risk analysis, and earned value management. Each document provides guidance on processes and methods within those disciplines and includes a product number and option to purchase the document. The recommended practices cover a wide range of industries including construction, engineering, mining, and transportation infrastructure.

Uploaded by

enfrspit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views5 pages

List of AACE Documents

This document lists 98 recommended practices documents published by AACE International related to project cost estimating, project scheduling, risk analysis, and earned value management. Each document provides guidance on processes and methods within those disciplines and includes a product number and option to purchase the document. The recommended practices cover a wide range of industries including construction, engineering, mining, and transportation infrastructure.

Uploaded by

enfrspit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

https://online.aacei.org/aacessa/ecssashop.show_category?

p_category_id=RP&p_cust_id=&p_order_ser
no=&p_promo_cd=&p_price_cd=&p_session_serno=&p_trans_ty=

http://web.aacei.org/resources/publications/recommended-practices

o 101R-19: Roles and Responsibilities of a Project Cost Estimator


Item #:101R-19 ADD TO CART

o 10S-90: Cost Engineering Terminology
Item #:RP10S-90 ADD TO CART

o 11R-88: Required Skills and Knowledge of Cost Engineering
Item #:RP11R-88 ADD TO CART

o 13S-90: Recommended Method for Determining Building Area
Item #:RP13S-90 ADD TO CART

o 14R-90: Responsibility and Required Skills for a Project Planning and Scheduling Professional
Item #:RP14R-90 ADD TO CART

o 15R-81: Profitability Methods
Item #:RP15R-81 ADD TO CART

o 16R-90: Conducting Technical and Economic Evaluations - Process and Utility Industries
Item #:RP16R-90 ADD TO CART

o 17R-97: Cost Estimate Classification System
Item #:RP17R-97 ADD TO CART

o 18R-97: Cost Estimate Classification System - EPC for the Process Industries
Item #:RP18R-97 ADD TO CART

o 19R-97: Estimate Preparation Costs – As Applied for the Process Industries
Item #:RP19R-97 ADD TO CART

o 20R-98: Project Code of Accounts
Item #:RP20R-98 ADD TO CART

o 21R-98: Project Code of Accounts – EPC for the Process Industries
Item #:RP21R-98 ADD TO CART

o 22R-01: Direct Labor Productivity Measurement - Construction and Major Maintenance Projects
Item #:RP22R-01 ADD TO CART

o 23R-02: Identification of Activities
Item #:RP23R-02 ADD TO CART

o 24R-03: Developing Activity Logic
Item #:RP24R-03 ADD TO CART

o 25R-03: Estimating Lost Labor Productivity in Construction Claims
Item #:RP25R-03 ADD TO CART

o 27R-03: Schedule Classification System
Item #:RP27R-03 ADD TO CART

o 28R-03: Developing Location Factors by Factoring - Architecture, EPC
Item #:RP28R-03 ADD TO CART

o 29R-03: Forensic Schedule Analysis
Item #:RP29R-03 ADD TO CART

o 30R-03: Implementing Project Constructability
Item #:RP30R-03 ADD TO CART

o 31R-03: Reviewing, Validating, and Documenting the Estimate
Item #:RP31R-03 ADD TO CART

o 32R-04: Determining Activity Durations
Item #:RP32R-04 ADD TO CART

o 33R-15: Developing the Work Breakdown Structure
Item #:RP33R-15 ADD TO CART

o 34R-05: Basis of Estimate
Item #:RP34R-05 ADD TO CART

o 35R-09: Development of Cost Estimate Plans - Building and General Construction Industries
Item #:RP35R-09 ADD TO CART

o 36R-08: Development of Cost Estimate Plans - EPC for the Process Industries
Item #:RP36R-08 ADD TO CART

o 37R-06: Schedule Levels of Detail - As Applied in Engineering, Procurement, and Construction
Item #:RP37R-06 ADD TO CART

o 38R-06: Documenting the Schedule Basis
Item #:RP38R-06 ADD TO CART

o 39R-06: Project Planning - As Applied in Engineering and Construction for Capital Projects
Item #:RP39R-06 ADD TO CART

o 40R-08: Contingency Estimating - General Principles
Item #:RP40R-08 ADD TO CART

o 41R-08: Risk Analysis and Contingency Determination Using Range Estimating
Item #:RP41R-08 ADD TO CART

o 42R-08: Risk Analysis and Contingency Determination Using Parametric Estimating
Item #:RP42R-08 ADD TO CART

o 43R-08: Risk Analysis and Contingency Determination Using Parametric Estimating - Example Models
Item #:RP43R-08 ADD TO CART

o 44R-08: Risk Analysis and Contingency Determination Using Expected Value
Item #:RP44R-08 ADD TO CART

o 45R-08: Scheduling Claims Protection Methods
Item #:RP45R-08 ADD TO CART

o 46R-11: Required Skills and Knowledge of Project Cost Estimating
Item #:RP46R-11 ADD TO CART

o 47R-11: Cost Estimate Classification System - Mining and Mineral Processing Industries
Item #:RP47R-11 ADD TO CART

o 48R-06: Schedule Constructability Review
Item #:RP48R-06 ADD TO CART

o 49R-06: Identifying the Critical Path
Item #:RP49R-06 ADD TO CART

o 50R-16: Trending and Forecasting of CPM Schedules
Item #:RP50R-16 ADD TO CART

o 52R-06: Prospective Time Impact Analysis - As Applied in Construction
Item #:RP52R-06 ADD TO CART

o 53R-06: Schedule Update Review - As Applied In Engineering, Procurement and Construction
Item #:RP53R-06 ADD TO CART

o 54R-07: Recovery Scheduling - As Applied in Engineering, Procurement, and Construction
Item #:RP54R-07 ADD TO CART

o 55R-09: Analyzing S-Curves
Item #:RP55R-09 ADD TO CART

o 56R-08: Cost Estimate Classification System - Building and General Construction Industries
Item #:RP56R-08 ADD TO CART

o 57R-09: Integrated Cost and Schedule Risk Analysis Using Monte Carlo Simulation of a CPM Model
Item #:RP57R-09 ADD TO CART

o 58R-10: Escalation Estimating Principles and Methods Using Indices
Item #:RP58R-10 ADD TO CART

o 59R-10: Development of Factored Cost Estimates - EPC for the Process Industries
Item #:RP59R-10 ADD TO CART

o 60R-10: Developing the Project Controls Plan
Item #:RP60R-10 ADD TO CART

o 61R-10: Schedule Design - As Applied in Engineering, Procurement, and Construction
Item #:RP61R-10 ADD TO CART

o 62R-11: Risk Assessment: Identification and Qualitative Analysis
Item #:RP62R-11 ADD TO CART

o 63R-11: Risk Treatment
Item #:RP63R-11 ADD TO CART

o 64R-11: CPM Schedule Risk Modeling and Analysis: Special Considerations
Item #:RP64R-11 ADD TO CART

o 65R-11: Integrated Cost & Schedule Risk Analysis and Contingency Determination Using Expected Value
Item #:RP65R-11 ADD TO CART

o 66R-11: Selecting Probability Distribution Functions for Cost and Schedule Risk Simulation Models
Item #:RP66R-11 ADD TO CART

o 67R-11: Contract Risk Allocation - As Applied in Engineering, Procurement, and Construction
Item #:RP67R-11 ADD TO CART

o 68R-11: Escalation Estimating Using Indices and Monte Carlo Simulation
Item #:RP68R-11 ADD TO CART

o 69R-12: Cost Estimate Classification System - EPC for the Hydropower Industry
Item #:RP69R-12 ADD TO CART

o 70R-12: Principles of Schedule Contingency Management - Engineering, Procurement and Construction
Item #:RP70R-12 ADD TO CART

o 71R-12: Required Skills and Knowledge of Decision and Risk Management
Item #:RP71R-12 ADD TO CART

o 72R-12: Developing a Project Risk Management Plan
Item #:RP72R-12 ADD TO CART

o 73R-13: Establishing Labor Productivity Norms
Item #:RP73R-13 ADD TO CART

o 74R-13: Basis of Estimate - As Applied for the Software Services Industries
Item #:RP74R-13 ADD TO CART

o 75R-13: Schedule and Cost Reserves within the Framework of ANSI EIA-748
Item #:RP75R-13 ADD TO CART

o 77R-15: Quality Control/Quality Assurance for Risk Management
Item #:RP77R-15 ADD TO CART

o 78R-13: Original Baseline Schedule Review - As Applied in Engineering, Procurement, and Construction
Item #:RP78R-13 ADD TO CART

o 79R-13: Level of Effort Planning and Execution on Earned Value Projects - Within ANSI EIA-748
Item #:RP79R-13 ADD TO CART

o 80R-13: Estimate at Completion (EAC)
Item #:RP80R-13 ADD TO CART

o 81R-13: Required Skills and Knowledge of Earned Value Management
Item #:RP81R-13 ADD TO CART

o 82R-13: Earned Value Management Overview and Recommended Practices Consistent with EIA-748-C
Item #:RP82R-13 ADD TO CART

o 83R-13: Organizational Breakdown Structure and Responsibility Assignment Matrix
Item #:RP83R-13 ADD TO CART

o 84R-13: Planning and Accounting for Adverse Weather
Item #:RP84R-13 ADD TO CART

o 85R-14: Use of Decision Trees in Decision Making
Item #:RP85R-14 ADD TO CART

o 86R-14: Variance Analysis and Reporting
Item #:RP86R-14 ADD TO CART

o 87R-14: Cost Estimate Classification System - Petroleum Exploration and Production Industry
Item #:RP87R-14 ADD TO CART

o 88R-15: Tracking the Procurement Process using a CPM Schedule – As Applied in Construction
Item #:RP88R-15 ADD TO CART

o 89R-16: Management Summary Schedule
Item #:RP89R-16 ADD TO CART

o 90R-17: Statusing the CPM Schedule – As Applied in Construction
Item #:RP90R-17 ADD TO CART

o 91R-16: Schedule Development
Item #:RP91R-16 ADD TO CART

o 92R-17: Analyzing Near-Critical Paths
Item #:RP92R-17 ADD TO CART

o 93R-17: Schedule Logs
Item #:RP93R-17 ADD TO CART

o 94R-18: Cost Control Software Requirements
Item #:RP94R-18 ADD TO CART

o 95R-18: Construction Photography to Document Project Status
Item #:RP95R-18 ADD TO CART

o 96R-18: Cost Estimate Classification System – As Applied in Power Transmission Line Infrastructure Projects
Item #:RP96R-18 ADD TO CART

o 97R-18: Cost Estimate Classification System – As Applied in Pipeline Transportation Infrastructure Projects
Item #:RP97R-18 ADD TO CART

o 98R-18: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the
Road and Rail Transportation Infrastructure Industries
Item #:RP98R-18 ADD TO CART