The document contains 25 multiple choice questions that appear to be part of an assessment test on quality processes and standards. It includes questions about roles and responsibilities, quality management tools, metrics, policies, and more. The assessment covers topics from ISO, CMMI, quality assurance, and Wipro's own quality framework called Veloci-Q.

Uploaded by

Krishna Swamy
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
732 views

SRT

The document contains 25 multiple choice questions that appear to be part of an assessment test on quality processes and standards. It includes questions about roles and responsibilities, quality management tools, metrics, policies, and more. The assessment covers topics from ISO, CMMI, quality assurance, and Wipro's own quality framework called Veloci-Q.

Uploaded by

Krishna Swamy
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 28

<?xml version="1.0" standalone="yes" ?

>
- <NewDataSet>
- <instxt>
<txt id="intro1">Assess Yourself!</txt>
<txt id="intro2">You have to answer 25 multiple choice questions.</txt>
<txt id="intro3">You need to score a minimum of 70% to pass the test.</txt>
<txt id="intro4">Click Enter to begin the test.</txt>
<txt id="intro5">All the Best!</txt>
<txt id="intro6">Assessment - Result</txt>
<txt id="intro7">Your score</txt>
<txt id="intro8" />
<txt id="intro9">VelociQ 101 Assessment</txt>
<txt id="intro10">Click the Correct Option.</txt>
<txt id="intro11">Click Get your certificate.</txt>
<txt id="intro12">Sorry! You have failed</txt>
<txt id="intro13">Congratulations!</txt>
</instxt>
- <Main>
<QUESTION1>1</QUESTION1>
<QUESTION>You are a Project Engineer who has just joined Wipro. You want to know
all your responsibilities as defined by veloci-Q for your role. Where would you
go?</QUESTION>
<OPTION1>Treasure House</OPTION1>
<OPTION2>Navigator</OPTION2>
<OPTION3>PDB</OPTION3>
<OPTION4>Guidelines</OPTION4>
<ANSWER>Navigator</ANSWER>
</Main>
- <Main>
<QUESTION1>2</QUESTION1>
<QUESTION>Which phases of SDLC can be sources for errors?</QUESTION>
<OPTION1>RS, Design, CUT & IT</OPTION1>
<OPTION2>RS, Design, CUT, IT, ST & AT</OPTION2>
<OPTION3>RS, Design, CUT, IT & ST</OPTION3>
<OPTION4>RS, Design & CUT</OPTION4>
<ANSWER>RS, Design & CUT</ANSWER>
</Main>
- <Main>
<QUESTION1>3</QUESTION1>
<QUESTION>The data and information of all previously executed projects are in
the:</QUESTION>
<OPTION1>PIP DB</OPTION1>
<OPTION2>Navigator</OPTION2>
<OPTION3>Project data bank</OPTION3>
<OPTION4>Treasure house</OPTION4>
<ANSWER>Project data bank</ANSWER>
</Main>
- <Main>
<QUESTION1>4</QUESTION1>
<QUESTION>As per veloci-Q, in a project following V process model – the activity to
define acceptance Test Plan is recommended as part of</QUESTION>
<OPTION1>Project Planning phase</OPTION1>
<OPTION2>RS phase</OPTION2>
<OPTION3>Design Phase</OPTION3>
<OPTION4>Acceptance Testing Phase</OPTION4>
<ANSWER>RS phase</ANSWER>
</Main>
- <Main>
<QUESTION1>5</QUESTION1>
<QUESTION>Which of the following is not a management review mechanism, where
senior management reviews performance of projects/ organization with respect to
Quality?</QUESTION>
<OPTION1>PMR</OPTION1>
<OPTION2>PIP board meeting</OPTION2>
<OPTION3>MRM</OPTION3>
<OPTION4>QIC</OPTION4>
<ANSWER>PIP board meeting</ANSWER>
</Main>
- <Main>
<QUESTION1>6</QUESTION1>
<QUESTION>The philosophy of "say what you do, do what you say" belongs
to</QUESTION>
<OPTION1>BS7799</OPTION1>
<OPTION2>The Project Manager</OPTION2>
<OPTION3>CMMI</OPTION3>
<OPTION4>ISO</OPTION4>
<ANSWER>ISO</ANSWER>
</Main>
- <Main>
<QUESTION1>7</QUESTION1>
<QUESTION>Which of these are used to identify the Risks in the project?</QUESTION>
<OPTION1>Past project data</OPTION1>
<OPTION2>Risk Identification checklist</OPTION2>
<OPTION3>Stake holder inputs</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>8</QUESTION1>
<QUESTION>Effort Deviation means</QUESTION>
<OPTION1>PM's effort allocated to the Team member</OPTION1>
<OPTION2>Projected effort and planned effort</OPTION2>
<OPTION3>Actually consumed effort only</OPTION3>
<OPTION4>Variation between planned effort and actual effort+effort to
go</OPTION4>
<ANSWER>Variation between planned effort and actual effort+effort to go</ANSWER>
</Main>
- <Main>
<QUESTION1>9</QUESTION1>
<QUESTION>What is the monthly mechanism to record and track metrics of the
project?</QUESTION>
<OPTION1>Work Plans</OPTION1>
<OPTION2>PMR</OPTION2>
<OPTION3>PDMR</OPTION3>
<OPTION4>ASR</OPTION4>
<ANSWER>PDMR</ANSWER>
</Main>
- <Main>
<QUESTION1>10</QUESTION1>
<QUESTION>ISO stands for</QUESTION>
<OPTION1>International Organization for Standardization</OPTION1>
<OPTION2>International Systems Organization</OPTION2>
<OPTION3>International Systems Orientation</OPTION3>
<OPTION4>International Systems for Organization</OPTION4>
<ANSWER>International Organization for Standardization</ANSWER>
</Main>
- <Main>
<QUESTION1>11</QUESTION1>
<QUESTION>Process improvements can be suggested by anyone in
Wipro</QUESTION>
<OPTION1>TRUE</OPTION1>
<OPTION2>FALSE</OPTION2>
<ANSWER>TRUE</ANSWER>
</Main>
- <Main>
<QUESTION1>12</QUESTION1>
<QUESTION>Quality is defined as</QUESTION>
<OPTION1>Use of checklists and templates</OPTION1>
<OPTION2>Ability of the product to meet stated or implicit needs of
customers</OPTION2>
<OPTION3>Set of process and procedures</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Ability of the product to meet stated or implicit needs of
customers</ANSWER>
</Main>
- <Main>
<QUESTION1>13</QUESTION1>
<QUESTION>An assessment consists of</QUESTION>
<OPTION1>Interview of customers</OPTION1>
<OPTION2>Questionnaire, Documents review and Interviews</OPTION2>
<OPTION3>Review of quality System</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Questionnaire, Documents review and Interviews</ANSWER>
</Main>
- <Main>
<QUESTION1>14</QUESTION1>
<QUESTION>Triggers for root cause analysis are documented in</QUESTION>
<OPTION1>Quality Plan</OPTION1>
<OPTION2>Master list of documents</OPTION2>
<OPTION3>Project Dashboard</OPTION3>
<OPTION4>Project Plan</OPTION4>
<ANSWER>Project Plan</ANSWER>
</Main>
- <Main>
<QUESTION1>15</QUESTION1>
<QUESTION>At organizational level, metrics are reviewed by management
in</QUESTION>
<OPTION1>Quality Improvement Council</OPTION1>
<OPTION2>Management Review Meeting</OPTION2>
<OPTION3>Quality Review Meeting</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Management Review Meeting</ANSWER>
</Main>
- <Main>
<QUESTION1>16</QUESTION1>
<QUESTION>Modification of the approved process to suit the requirements of a
project are documented in</QUESTION>
<OPTION1>Veloci-Q</OPTION1>
<OPTION2>Project Plan</OPTION2>
<OPTION3>Master List of Process</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Project Plan</ANSWER>
</Main>
- <Main>
<QUESTION1>17</QUESTION1>
<QUESTION>Planned and systematic activities performed to provide adequate
confidence that an item/product conforms to requirements is</QUESTION>
<OPTION1>Regression Testing</OPTION1>
<OPTION2>Unit Testing</OPTION2>
<OPTION3>Quality Assurance</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Quality Assurance</ANSWER>
</Main>
- <Main>
<QUESTION1>18</QUESTION1>
<QUESTION>Wipro’s quality policy is</QUESTION>
<OPTION1>Meet the needs and expectations of customers</OPTION1>
<OPTION2>Achieve customer satisfaction by providing defect free products and
services on time.</OPTION2>
<OPTION3>Attain CMMi Level 5 compliance</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Achieve customer satisfaction by providing defect free products and
services on time.</ANSWER>
</Main>
- <Main>
<QUESTION1>19</QUESTION1>
<QUESTION>Group that focus on the tools used by projects and the impact of using
tools is</QUESTION>
<OPTION1>SQA</OPTION1>
<OPTION2>SEPG</OPTION2>
<OPTION3>Tools group</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Tools group</ANSWER>
</Main>
- <Main>
<QUESTION1>20</QUESTION1>
<QUESTION>Configuration audits are verification mechanisms used to ensure that
deliverables are:</QUESTION>
<OPTION1>On schedule</OPTION1>
<OPTION2>Defect free</OPTION2>
<OPTION3>Consistent with requirements</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Consistent with requirements</ANSWER>
</Main>
- <Main>
<QUESTION1>21</QUESTION1>
<QUESTION>Which of this is not the intended use of Metrics?</QUESTION>
<OPTION1>To take appropriate decisions based on measured values</OPTION1>
<OPTION2>To monitor individual performance</OPTION2>
<OPTION3>To monitor the project performance</OPTION3>
<OPTION4>To revise plans</OPTION4>
<ANSWER>To monitor individual performance</ANSWER>
</Main>
- <Main>
<QUESTION1>22</QUESTION1>
<QUESTION>The effectiveness of the Quality Management System is continuously
improved through</QUESTION>
<OPTION1>Quality group recruitments</OPTION1>
<OPTION2>Audit results, corrective and preventive actions, CSATs, Management
Review</OPTION2>
<OPTION3>Sales reports, Balance sheets, Company audit reports</OPTION3>
<OPTION4>Individual Performance appraisals</OPTION4>
<ANSWER>Audit results, corrective and preventive actions, CSATs, Management
Review</ANSWER>
</Main>
- <Main>
<QUESTION1>23</QUESTION1>
<QUESTION>Quality Policy</QUESTION>
<OPTION1>Is prepared for the Mission Quality Group</OPTION1>
<OPTION2>Is used to rate the Mission Quality Group performance every
year</OPTION2>
<OPTION3>Should not be shown to the customer as it is very confidential</OPTION3>
<OPTION4>States a clear commitment to quality and consistent with organization
goals</OPTION4>
<ANSWER>States a clear commitment to quality and consistent with organization
goals</ANSWER>
</Main>
- <Main>
<QUESTION1>24</QUESTION1>
<QUESTION>Prototype helps in validating</QUESTION>
<OPTION1>Design</OPTION1>
<OPTION2>Technology</OPTION2>
<OPTION3>Requirements</OPTION3>
<OPTION4>Technical skills</OPTION4>
<ANSWER>Design</ANSWER>
</Main>
- <Main>
<QUESTION1>25</QUESTION1>
<QUESTION>Organizational learning enters Veloci-Q through</QUESTION>
<OPTION1>Queries and PIP</OPTION1>
<OPTION2>Project Performance Analysis</OPTION2>
<OPTION3>Audit findings</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>26</QUESTION1>
<QUESTION>______is an initiative that involves measuring and analyzing business
processes.</QUESTION>
<OPTION1>Six Sigma</OPTION1>
<OPTION2>Root Cause Analysis</OPTION2>
<OPTION3>Pugh Matrix</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Six Sigma</ANSWER>
</Main>
- <Main>
<QUESTION1>27</QUESTION1>
<QUESTION>In a six sigma project, the problem owner is</QUESTION>
<OPTION1>Black Belt</OPTION1>
<OPTION2>White Belt</OPTION2>
<OPTION3>DM</OPTION3>
<OPTION4>Green Belt</OPTION4>
<ANSWER>Green Belt</ANSWER>
</Main>
- <Main>
<QUESTION1>28</QUESTION1>
<QUESTION>A list of project documents, quality records and customer supplied
documents are recorded in</QUESTION>
<OPTION1>Master List of Documents</OPTION1>
<OPTION2>Project Folder</OPTION2>
<OPTION3>Document Bank</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Master List of Documents</ANSWER>
</Main>
- <Main>
<QUESTION1>29</QUESTION1>
<QUESTION>Schedule deviation, effort deviation, field error rate are some of the
metrics captured for</QUESTION>
<OPTION1>Service projects</OPTION1>
<OPTION2>Development projects</OPTION2>
<OPTION3>Maintenance projects</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Development projects</ANSWER>
</Main>
- <Main>
<QUESTION1>30</QUESTION1>
<QUESTION>Difference between actual end date and planned end date expressed as
a % of planned duration is</QUESTION>
<OPTION1>Requirements volatility</OPTION1>
<OPTION2>Schedule volatility</OPTION2>
<OPTION3>Schedule deviation</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Schedule deviation</ANSWER>
</Main>
- <Main>
<QUESTION1>31</QUESTION1>
<QUESTION>Ratio of product size to total project effort is</QUESTION>
<OPTION1>Effort Deviation</OPTION1>
<OPTION2>Overall Productivity</OPTION2>
<OPTION3>CUT productivity</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Overall Productivity</ANSWER>
</Main>
- <Main>
<QUESTION1>32</QUESTION1>
<QUESTION>Acceptance criteria should be part of Requirement Specification (RS)
document</QUESTION>
<OPTION1>FALSE</OPTION1>
<OPTION2>Can be part of RS if provided by customer</OPTION2>
<OPTION3>TRUE</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>TRUE</ANSWER>
</Main>
- <Main>
<QUESTION1>33</QUESTION1>
<QUESTION>__________are requests to make changes to baselined work
products.</QUESTION>
<OPTION1>Requirements</OPTION1>
<OPTION2>Maintenance Request (MR)</OPTION2>
<OPTION3>Change Request (CR)</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Change Request (CR)</ANSWER>
</Main>
- <Main>
<QUESTION1>34</QUESTION1>
<QUESTION>Wipro’s quality system is known as</QUESTION>
<OPTION1>K-net</OPTION1>
<OPTION2>WiqTree</OPTION2>
<OPTION3>Veloci-Q</OPTION3>
<OPTION4>Project Data Bank</OPTION4>
<ANSWER>Veloci-Q</ANSWER>
</Main>
- <Main>
<QUESTION1>35</QUESTION1>
<QUESTION>__________are the industry standards and benchmarks for
quality.</QUESTION>
<OPTION1>ChannelW</OPTION1>
<OPTION2>Quality Models</OPTION2>
<OPTION3>Six Sigma</OPTION3>
<OPTION4>Veloci-Q</OPTION4>
<ANSWER>Quality Models</ANSWER>
</Main>
- <Main>
<QUESTION1>36</QUESTION1>
<QUESTION>In Veloci-Q, intentions and directions for quality initiative are
documented in</QUESTION>
<OPTION1>Policies section</OPTION1>
<OPTION2>Procedure section</OPTION2>
<OPTION3>Guidelines section</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Policies section</ANSWER>
</Main>
- <Main>
<QUESTION1>37</QUESTION1>
<QUESTION>Process artifacts that help to perform project activities in a standard
manner are</QUESTION>
<OPTION1>Checklists and Templates</OPTION1>
<OPTION2>Policies</OPTION2>
<OPTION3>Procedures</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Checklists and Templates</ANSWER>
</Main>
- <Main>
<QUESTION1>38</QUESTION1>
<QUESTION>The extent to which a specific process is defined, managed, measured
and controlled within an organization is known as</QUESTION>
<OPTION1>Procedures Capacity</OPTION1>
<OPTION2>Software Process Maturity</OPTION2>
<OPTION3>Measurememt Maturity</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Software Process Maturity</ANSWER>
</Main>
- <Main>
<QUESTION1>39</QUESTION1>
<QUESTION>The two representations in the CMMI Framework are:</QUESTION>
<OPTION1>Integrated and Continuous</OPTION1>
<OPTION2>Integrated and Staged</OPTION2>
<OPTION3>Staged and Continuous</OPTION3>
<OPTION4>None of the Above</OPTION4>
<ANSWER>Staged and Continuous</ANSWER>
</Main>
- <Main>
<QUESTION1>40</QUESTION1>
<QUESTION>____________ documents all change requests to baselined
items.</QUESTION>
<OPTION1>Change Register</OPTION1>
<OPTION2>Configuration Register</OPTION2>
<OPTION3>Change Control Register</OPTION3>
<OPTION4>Change Request Register</OPTION4>
<ANSWER>Change Control Register</ANSWER>
</Main>
- <Main>
<QUESTION1>41</QUESTION1>
<QUESTION>_________is used to document the features/functionality to be tested,
test strategy and testing methods to be used.</QUESTION>
<OPTION1>Test Form</OPTION1>
<OPTION2>Test Plan</OPTION2>
<OPTION3>Test development</OPTION3>
<OPTION4>Test Design</OPTION4>
<ANSWER>Test Plan</ANSWER>
</Main>
- <Main>
<QUESTION1>42</QUESTION1>
<QUESTION>Project monitoring reviews are conducted to</QUESTION>
<OPTION1>Review project progress</OPTION1>
<OPTION2>Understand project requirements</OPTION2>
<OPTION3>Monitor requirements volatility</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Review project progress</ANSWER>
</Main>
- <Main>
<QUESTION1>43</QUESTION1>
<QUESTION>A Process basically defines :</QUESTION>
<OPTION1>A new procedure to be implemented</OPTION1>
<OPTION2>Who is doing what when and how to reach a specific goal</OPTION2>
<OPTION3>A running Program</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Who is doing what when and how to reach a specific goal</ANSWER>
</Main>
- <Main>
<QUESTION1>44</QUESTION1>
<QUESTION>The International Standard for Quality Assurance – ISO 9001
emphasizes on :</QUESTION>
<OPTION1>Critical Component quality</OPTION1>
<OPTION2>Product Quality</OPTION2>
<OPTION3>Both (a) and (b)</OPTION3>
<OPTION4>Process Quality</OPTION4>
<ANSWER>Process Quality</ANSWER>
</Main>
- <Main>
<QUESTION1>45</QUESTION1>
<QUESTION>Which Lifecycle model emphasizes preparation of plans for validation
during the early Life Cycle stages itself?</QUESTION>
<OPTION1>Rational Unified Process Model</OPTION1>
<OPTION2>Maintenance model</OPTION2>
<OPTION3>2I Process Model</OPTION3>
<OPTION4>V-Process Model</OPTION4>
<ANSWER>V-Process Model</ANSWER>
</Main>
- <Main>
<QUESTION1>46</QUESTION1>
<QUESTION>_______ is a monthly mechanism to track metric trends, exceptions of
metrics and ensure Process Improvements in the Business Unit</QUESTION>
<OPTION1>QICs</OPTION1>
<OPTION2>PIP Board meetings</OPTION2>
<OPTION3>Quality meet</OPTION3>
<OPTION4>Look Ahead Meetings</OPTION4>
<ANSWER>QICs</ANSWER>
</Main>
- <Main>
<QUESTION1>47</QUESTION1>
<QUESTION>Organisation’s Customer Focus should meet the needs and expectations
of:</QUESTION>
<OPTION1>Suppliers and partners</OPTION1>
<OPTION2>The customers and end users</OPTION2>
<OPTION3>People in the Organisation</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>48</QUESTION1>
<QUESTION>__________________ is a mechanism of maintaining the mapping
between requirements and products resulting from the requirements.</QUESTION>
<OPTION1>Design document</OPTION1>
<OPTION2>Requirements Traceability</OPTION2>
<OPTION3>Test cases</OPTION3>
<OPTION4>Functional design</OPTION4>
<ANSWER>Requirements Traceability</ANSWER>
</Main>
- <Main>
<QUESTION1>49</QUESTION1>
<QUESTION>Voice Of Customer (VOC) can be used to</QUESTION>
<OPTION1>Select requirements</OPTION1>
<OPTION2>Requirements traceability</OPTION2>
<OPTION3>Prioritize customer requirements</OPTION3>
<OPTION4>Analyze customer requirements</OPTION4>
<ANSWER>Analyze customer requirements</ANSWER>
</Main>
- <Main>
<QUESTION1>50</QUESTION1>
<QUESTION>The CMMI level 5 stage is termed as a :</QUESTION>
<OPTION1>Iterative stage</OPTION1>
<OPTION2>Repeatable stage</OPTION2>
<OPTION3>Optimizing stage</OPTION3>
<OPTION4>Defined stage</OPTION4>
<ANSWER>Optimizing stage</ANSWER>
</Main>
- <Main>
<QUESTION1>51</QUESTION1>
<QUESTION>Project Performance Analysis (PPA) is an exercise which examines
:</QUESTION>
<OPTION1>Lessons learnt and best practices</OPTION1>
<OPTION2>Conformance of requirements</OPTION2>
<OPTION3>Individual performance</OPTION3>
<OPTION4>Process Improvement Proposals</OPTION4>
<ANSWER>Lessons learnt and best practices</ANSWER>
</Main>
- <Main>
<QUESTION1>52</QUESTION1>
<QUESTION>A NCR (Non Conformance Report) signifies :</QUESTION>
<OPTION1>Deviation from a stated process</OPTION1>
<OPTION2>Failure of ISO certification</OPTION2>
<OPTION3>Observation</OPTION3>
<OPTION4>Deviation of coding standard</OPTION4>
<ANSWER>Deviation from a stated process</ANSWER>
</Main>
- <Main>
<QUESTION1>53</QUESTION1>
<QUESTION>The Assessment methodology defined by SEI for the CMMI model
is</QUESTION>
<OPTION1>PVPD</OPTION1>
<OPTION2>CAQ</OPTION2>
<OPTION3>CBAIPI</OPTION3>
<OPTION4>SCAMPI</OPTION4>
<ANSWER>SCAMPI</ANSWER>
</Main>
- <Main>
<QUESTION1>54</QUESTION1>
<QUESTION>How many Process Areas are there in CMMI:</QUESTION>
<OPTION1>24</OPTION1>
<OPTION2>28</OPTION2>
<OPTION3>23</OPTION3>
<OPTION4>18</OPTION4>
<ANSWER>24</ANSWER>
</Main>
- <Main>
<QUESTION1>55</QUESTION1>
<QUESTION>What is the 3rd level in CMMI called?</QUESTION>
<OPTION1>Optimized</OPTION1>
<OPTION2>Controlled</OPTION2>
<OPTION3>Managed</OPTION3>
<OPTION4>Defined</OPTION4>
<ANSWER>Defined</ANSWER>
</Main>
- <Main>
<QUESTION1>56</QUESTION1>
<QUESTION>In the execution of maintenance projects each trigger from the customer
is recorded in a:</QUESTION>
<OPTION1>Change Request</OPTION1>
<OPTION2>MR</OPTION2>
<OPTION3>PMR</OPTION3>
<OPTION4>Change control Register</OPTION4>
<ANSWER>MR</ANSWER>
</Main>
- <Main>
<QUESTION1>57</QUESTION1>
<QUESTION>In CMMI the Level 2 stage is described as</QUESTION>
<OPTION1>Optimized</OPTION1>
<OPTION2>defined</OPTION2>
<OPTION3>Managed</OPTION3>
<OPTION4>Repeatable</OPTION4>
<ANSWER>Managed</ANSWER>
</Main>
- <Main>
<QUESTION1>58</QUESTION1>
<QUESTION>Project monitoring reviews are conducted :</QUESTION>
<OPTION1>On a monthly basis</OPTION1>
<OPTION2>By the SQA Team periodically</OPTION2>
<OPTION3>Whenever we have a client release</OPTION3>
<OPTION4>In the external audit meeting</OPTION4>
<ANSWER>On a monthly basis</ANSWER>
</Main>
- <Main>
<QUESTION1>59</QUESTION1>
<QUESTION>Which of these is not true regarding an Observation recorded during an
audit</QUESTION>
<OPTION1>This is a suggestion for improvement</OPTION1>
<OPTION2>This is a deviation from the stated process</OPTION2>
<OPTION3>This does not need closure</OPTION3>
<OPTION4>It could be a potential for non-conformance in future</OPTION4>
<ANSWER>This is a deviation from the stated process</ANSWER>
</Main>
- <Main>
<QUESTION1>60</QUESTION1>
<QUESTION>The different categories of Lifecycle models are</QUESTION>
<OPTION1>V-process model, 2i, RUP</OPTION1>
<OPTION2>iPAT, veloci-Q, Six Sigma</OPTION2>
<OPTION3>Development, maintenance, service, testing etc</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>V-process model, 2i, RUP</ANSWER>
</Main>
- <Main>
<QUESTION1>61</QUESTION1>
<QUESTION>In order to achieve customer satsifaction, the team should</QUESTION>
<OPTION1>Elicit parameters that are critical to quality from customers</OPTION1>
<OPTION2>Collect data and metrics</OPTION2>
<OPTION3>Track project performance</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>62</QUESTION1>
<QUESTION>The mechanism for obtaining customer feedback at project closure as
per veloci-Q is:</QUESTION>
<OPTION1>Call the customer and obtain feedback</OPTION1>
<OPTION2>Create a feedback form and send it</OPTION2>
<OPTION3>Use template in veloci-Q as a feedback form, tailor the feedback form by
including project specific questions</OPTION3>
<OPTION4>An acceptance mail from the customer post project completion will
suffice</OPTION4>
<ANSWER>Use template in veloci-Q as a feedback form, tailor the feedback form by
including project specific questions</ANSWER>
</Main>
- <Main>
<QUESTION1>63</QUESTION1>
<QUESTION>Customer Satisfaction survey is conducted to</QUESTION>
<OPTION1>Obtain feedback on delivery by Wipro</OPTION1>
<OPTION2>Obtain feedback on the engagement with Wipro</OPTION2>
<OPTION3>A and B</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>A and B</ANSWER>
</Main>
- <Main>
<QUESTION1>64</QUESTION1>
<QUESTION>ISO, CMM, Six Sigma are_______</QUESTION>
<OPTION1>Coding Standards</OPTION1>
<OPTION2>Quality models</OPTION2>
<OPTION3>Tools</OPTION3>
<OPTION4>Programming Languages</OPTION4>
<ANSWER>Quality models</ANSWER>
</Main>
- <Main>
<QUESTION1>65</QUESTION1>
<QUESTION>The process followed in the software development project should
be:</QUESTION>
<OPTION1>Processes as described in velociQ.</OPTION1>
<OPTION2>Client specified processes</OPTION2>
<OPTION3>Tailored ODC specific processes</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>66</QUESTION1>
<QUESTION>Which of this is a planned mechanism for Defect
Prevention?</QUESTION>
<OPTION1>Look Ahead Meetings</OPTION1>
<OPTION2>Customer feedback</OPTION2>
<OPTION3>PDMR and PMR reviews</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Look Ahead Meetings</ANSWER>
</Main>
- <Main>
<QUESTION1>67</QUESTION1>
<QUESTION>Deviations from the stated processes that are identified during the audit
are recorded as</QUESTION>
<OPTION1>Process Improvement Proposal</OPTION1>
<OPTION2>Creation of Work Plans</OPTION2>
<OPTION3>Non-Conformances</OPTION3>
<OPTION4>Process Improvement and Process Development</OPTION4>
<ANSWER>Non-Conformances</ANSWER>
</Main>
- <Main>
<QUESTION1>68</QUESTION1>
<QUESTION>veloci-Q has a ____ -tier architecture</QUESTION>
<OPTION1>Multi-dimensional</OPTION1>
<OPTION2>3</OPTION2>
<OPTION3>2</OPTION3>
<OPTION4>4</OPTION4>
<ANSWER>3</ANSWER>
</Main>
- <Main>
<QUESTION1>69</QUESTION1>
<QUESTION>A “Surveillance audit “is conducted by:</QUESTION>
<OPTION1>SQA and SEPG</OPTION1>
<OPTION2>Delivery Manager</OPTION2>
<OPTION3>Project Managers coordinated by SEPG</OPTION3>
<OPTION4>External certification agency</OPTION4>
<ANSWER>External certification agency</ANSWER>
</Main>
- <Main>
<QUESTION1>70</QUESTION1>
<QUESTION>Wipro Technologies is assessed as a CMMI
_____Organization</QUESTION>
<OPTION1>4</OPTION1>
<OPTION2>5</OPTION2>
<OPTION3>It is assessed at CMM only, but no level of CMMi</OPTION3>
<OPTION4>3</OPTION4>
<ANSWER>5</ANSWER>
</Main>
- <Main>
<QUESTION1>71</QUESTION1>
<QUESTION>Release note is prepared :</QUESTION>
<OPTION1>To explain the project closure norms</OPTION1>
<OPTION2>Prior to the release , contains the list of software items</OPTION2>
<OPTION3>After the final test case is executed</OPTION3>
<OPTION4>On acceptance of the release</OPTION4>
<ANSWER>Prior to the release , contains the list of software items</ANSWER>
</Main>
- <Main>
<QUESTION1>72</QUESTION1>
<QUESTION>A project can be initiated based on</QUESTION>
<OPTION1>DM’s preference to develop his favorite application</OPTION1>
<OPTION2>The contract signed by the customer</OPTION2>
<OPTION3>DM wanting his team to understand a technology</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>The contract signed by the customer</ANSWER>
</Main>
- <Main>
<QUESTION1>73</QUESTION1>
<QUESTION>Which of the following would help us in deriving the projects specific
process from the organization’s standard process?</QUESTION>
<OPTION1>Process guidelines</OPTION1>
<OPTION2>Life Cycle models</OPTION2>
<OPTION3>Project Procedures</OPTION3>
<OPTION4>Tailoring Guidelines</OPTION4>
<ANSWER>Tailoring Guidelines</ANSWER>
</Main>
- <Main>
<QUESTION1>74</QUESTION1>
<QUESTION>We take customer complaint seriously</QUESTION>
<OPTION1>TRUE</OPTION1>
<OPTION2>FALSE</OPTION2>
<ANSWER>TRUE</ANSWER>
</Main>
- <Main>
<QUESTION1>75</QUESTION1>
<QUESTION>Corrective and Preventive Action Plan should be drawn for:</QUESTION>
<OPTION1>Customer feedback ratings</OPTION1>
<OPTION2>Customer complaints received</OPTION2>
<OPTION3>Actions from Customer Satisfaction surveys</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>76</QUESTION1>
<QUESTION>The Six Sigma technique/tool recommended for use of Risk Analysis
is</QUESTION>
<OPTION1>FMEA</OPTION1>
<OPTION2>Pugh Matrix</OPTION2>
<OPTION3>Voice of Customer</OPTION3>
<OPTION4>RCA</OPTION4>
<ANSWER>FMEA</ANSWER>
</Main>
- <Main>
<QUESTION1>77</QUESTION1>
<QUESTION>Which metric is used for tracking change in requirements?</QUESTION>
<OPTION1>Requirements Volatility</OPTION1>
<OPTION2>CRs Index</OPTION2>
<OPTION3>Requirements Change Index</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Requirements Volatility</ANSWER>
</Main>
- <Main>
<QUESTION1>78</QUESTION1>
<QUESTION>Purpose of Project performance report is to</QUESTION>
<OPTION1>Compute average time it takes for screens to load</OPTION1>
<OPTION2>Restart the project again at a future date</OPTION2>
<OPTION3>Provide the project team appropriate reward</OPTION3>
<OPTION4>Record the learning’s from the project for future reference</OPTION4>
<ANSWER>Record the learning’s from the project for future reference</ANSWER>
</Main>
- <Main>
<QUESTION1>79</QUESTION1>
<QUESTION>It is mandatory to take corrective and preventive actions
for</QUESTION>
<OPTION1>Observations</OPTION1>
<OPTION2>Customer complaints</OPTION2>
<OPTION3>Non-conformances</OPTION3>
<OPTION4>Both (b) and (c )</OPTION4>
<ANSWER>Both (b) and (c )</ANSWER>
</Main>
- <Main>
<QUESTION1>80</QUESTION1>
<QUESTION>____is a cluster of related practices that are performed collectively to
achieve a set of objectives.</QUESTION>
<OPTION1>Channel W</OPTION1>
<OPTION2>Quality System</OPTION2>
<OPTION3>Process Area</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Process Area</ANSWER>
</Main>
- <Main>
<QUESTION1>81</QUESTION1>
<QUESTION>In CMMi context ____is a collaborative effort to find strengths and
improvement areas.</QUESTION>
<OPTION1>Appraisal</OPTION1>
<OPTION2>Audit</OPTION2>
<OPTION3>Assessment</OPTION3>
<OPTION4>Observation</OPTION4>
<ANSWER>Assessment</ANSWER>
</Main>
- <Main>
<QUESTION1>82</QUESTION1>
<QUESTION>DPMO stands for_____</QUESTION>
<OPTION1>Defects per million opportunities</OPTION1>
<OPTION2>Derivations per million opportunities</OPTION2>
<OPTION3>Defects per million occasions</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Defects per million opportunities</ANSWER>
</Main>
- <Main>
<QUESTION1>83</QUESTION1>
<QUESTION>DSSS, DMAIC and TQSS are six sigma methodologies used
for</QUESTION>
<OPTION1>Defect Reduction</OPTION1>
<OPTION2>Reduction of cycle time</OPTION2>
<OPTION3>Cost calculations</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Defect Reduction</ANSWER>
</Main>
- <Main>
<QUESTION1>84</QUESTION1>
<QUESTION>_____is a repository of data and learning from closed
projects.</QUESTION>
<OPTION1>Six Sigma</OPTION1>
<OPTION2>Project Data Bank</OPTION2>
<OPTION3>Veloci-Q</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Project Data Bank</ANSWER>
</Main>
- <Main>
<QUESTION1>85</QUESTION1>
<QUESTION>_____is used for tracking and monitoring risks.</QUESTION>
<OPTION1>Risk Management plan</OPTION1>
<OPTION2>Risk Identification checklist</OPTION2>
<OPTION3>Project plan</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Risk Management plan</ANSWER>
</Main>
- <Main>
<QUESTION1>86</QUESTION1>
<QUESTION>The CMMi model was developed by</QUESTION>
<OPTION1>Motorola</OPTION1>
<OPTION2>Software Engineering Institute</OPTION2>
<OPTION3>Wipro</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Software Engineering Institute</ANSWER>
</Main>
- <Main>
<QUESTION1>87</QUESTION1>
<QUESTION>Work items that would undergo changes during product life cycle are
known as</QUESTION>
<OPTION1>Configuration Items</OPTION1>
<OPTION2>Change Items</OPTION2>
<OPTION3>Product Items</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Configuration Items</ANSWER>
</Main>
- <Main>
<QUESTION1>88</QUESTION1>
<QUESTION>Practitioners working on projects can suggest process improvements
through a</QUESTION>
<OPTION1>Process Improvement Proposal</OPTION1>
<OPTION2>Change Request</OPTION2>
<OPTION3>Email/Phone</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Process Improvement Proposal</ANSWER>
</Main>
- <Main>
<QUESTION1>89</QUESTION1>
<QUESTION>Bureau of India Standards emphasizes on</QUESTION>
<OPTION1>Project Quality</OPTION1>
<OPTION2>Process Quality</OPTION2>
<OPTION3>Quality Models</OPTION3>
<OPTION4>Product Quality</OPTION4>
<ANSWER>Product Quality</ANSWER>
</Main>
- <Main>
<QUESTION1>90</QUESTION1>
<QUESTION>In a project context, who needs to do what is documented
in</QUESTION>
<OPTION1>Guidelines section</OPTION1>
<OPTION2>Policies section</OPTION2>
<OPTION3>Procedure section</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Procedure section</ANSWER>
</Main>
- <Main>
<QUESTION1>91</QUESTION1>
<QUESTION>The philosophy of ISO is based on the key principles like:</QUESTION>
<OPTION1>Act upon the findings</OPTION1>
<OPTION2>Say what you do, do what you say</OPTION2>
<OPTION3>Record what you did and check the results</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>92</QUESTION1>
<QUESTION>__________ matrix is an aid to trace requirements across different
phases of development.</QUESTION>
<OPTION1>Change request</OPTION1>
<OPTION2>Requirements</OPTION2>
<OPTION3>Traceability</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Traceability</ANSWER>
</Main>
- <Main>
<QUESTION1>93</QUESTION1>
<QUESTION>________ is defined as any adverse event that is likely to
occur.</QUESTION>
<OPTION1>Disaster recovery</OPTION1>
<OPTION2>Change request</OPTION2>
<OPTION3>Risk</OPTION3>
<OPTION4>Maintenance request</OPTION4>
<ANSWER>Risk</ANSWER>
</Main>
- <Main>
<QUESTION1>94</QUESTION1>
<QUESTION>The process model applicable to projects that involve development of
new products or major enhancements to existing products is</QUESTION>
<OPTION1>Iterative process model</OPTION1>
<OPTION2>V-process model</OPTION2>
<OPTION3>Waterfall process model</OPTION3>
<OPTION4>None of the above.</OPTION4>
<ANSWER>Iterative process model</ANSWER>
</Main>
- <Main>
<QUESTION1>95</QUESTION1>
<QUESTION>The role of a person who facilitates the six sigma team project to align
with the methodology is:</QUESTION>
<OPTION1>Green Belt</OPTION1>
<OPTION2>Champion</OPTION2>
<OPTION3>Yellow Belt</OPTION3>
<OPTION4>Black Belt</OPTION4>
<ANSWER>Black Belt</ANSWER>
</Main>
- <Main>
<QUESTION1>96</QUESTION1>
<QUESTION>______________ in the Configuration Management (CM) process
represents the snapshot of a set of deliverables at a given point in
time.</QUESTION>
<OPTION1>Configuration Audits</OPTION1>
<OPTION2>Baselines</OPTION2>
<OPTION3>Configuration Items</OPTION3>
<OPTION4>CCB</OPTION4>
<ANSWER>Baselines</ANSWER>
</Main>
- <Main>
<QUESTION1>97</QUESTION1>
<QUESTION>In Wipro, a quality group is</QUESTION>
<OPTION1>Part of project team</OPTION1>
<OPTION2>Part of a vertical</OPTION2>
<OPTION3>Separate group headed by Chief Quality Officer</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Separate group headed by Chief Quality Officer</ANSWER>
</Main>
- <Main>
<QUESTION1>98</QUESTION1>
<QUESTION>CMMi model outlines _____levels of maturity.</QUESTION>
<OPTION1>3</OPTION1>
<OPTION2>5</OPTION2>
<OPTION3>6</OPTION3>
<OPTION4>8</OPTION4>
<ANSWER>5</ANSWER>
</Main>
- <Main>
<QUESTION1>99</QUESTION1>
<QUESTION>Statistical term that describes the amount of variation in
data</QUESTION>
<OPTION1>Standard Deviation</OPTION1>
<OPTION2>Six Sigma</OPTION2>
<OPTION3>Normal Distribution</OPTION3>
<OPTION4>Median</OPTION4>
<ANSWER>Standard Deviation</ANSWER>
</Main>
- <Main>
<QUESTION1>100</QUESTION1>
<QUESTION>The quality group responsible for process definition, metrics analysis
and quality assurance activities at vertical/group vertical level is</QUESTION>
<OPTION1>Tools Group</OPTION1>
<OPTION2>SQA</OPTION2>
<OPTION3>SEPG</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>SQA</ANSWER>
</Main>
- <Main>
<QUESTION1>101</QUESTION1>
<QUESTION>Modification of the approved process to suit the requirements of a
project is known as</QUESTION>
<OPTION1>Process Tailoring</OPTION1>
<OPTION2>Process Approval</OPTION2>
<OPTION3>Process Deviation</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Process Tailoring</ANSWER>
</Main>
- <Main>
<QUESTION1>102</QUESTION1>
<QUESTION>_________ serves as an important verification activity to ensure the
completeness of testing in order to ensure product quality.</QUESTION>
<OPTION1>Test Audit</OPTION1>
<OPTION2>Integration Testing</OPTION2>
<OPTION3>Unit Testing</OPTION3>
<OPTION4>System testing</OPTION4>
<ANSWER>Test Audit</ANSWER>
</Main>
- <Main>
<QUESTION1>103</QUESTION1>
<QUESTION>Achieving the goal of Six Sigma means your product will be defect free
to an extent of:</QUESTION>
<OPTION1>13.5 defects per million opportunities</OPTION1>
<OPTION2>4.3 defects per million opportunities</OPTION2>
<OPTION3>3.4 defects per million opportunities</OPTION3>
<OPTION4>4.4 defects per million opportunities</OPTION4>
<ANSWER>3.4 defects per million opportunities</ANSWER>
</Main>
- <Main>
<QUESTION1>104</QUESTION1>
<QUESTION>_______ is a process of examining whether the process conforms to the
defined quality system:</QUESTION>
<OPTION1>Review</OPTION1>
<OPTION2>Audit</OPTION2>
<OPTION3>Assessment</OPTION3>
<OPTION4>Testing</OPTION4>
<ANSWER>Audit</ANSWER>
</Main>
- <Main>
<QUESTION1>105</QUESTION1>
<QUESTION>Maintenance Process Model is best suited for</QUESTION>
<OPTION1>Minor functional enhancements or performance improvement of the
existing software</OPTION1>
<OPTION2>Problem resolution on existing software products</OPTION2>
<OPTION3>Interface modification due to changes in hardware or software
environment</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>106</QUESTION1>
<QUESTION>You are a Project Engineer who has just joined Wipro. You want to know
best practices from projects executed in Wipro. Where would you go?</QUESTION>
<OPTION1>Treasure House</OPTION1>
<OPTION2>Navigator</OPTION2>
<OPTION3>PDB</OPTION3>
<OPTION4>Guidelines</OPTION4>
<ANSWER>Treasure House</ANSWER>
</Main>
- <Main>
<QUESTION1>107</QUESTION1>
<QUESTION>Which feature of velociQ helps in getting Activity Based
views?</QUESTION>
<OPTION1>PIP DB</OPTION1>
<OPTION2>Navigator</OPTION2>
<OPTION3>Project data bank</OPTION3>
<OPTION4>Treasure house</OPTION4>
<ANSWER>Navigator</ANSWER>
</Main>
- <Main>
<QUESTION1>108</QUESTION1>
<QUESTION>Which of the following is review mechanism, where senior management
reviews performance of projects with respect to Quality?</QUESTION>
<OPTION1>PMR</OPTION1>
<OPTION2>MRM</OPTION2>
<OPTION3>QIC</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>109</QUESTION1>
<QUESTION>Which of the following provides details on metrics performance for
project :</QUESTION>
<OPTION1>Execution Process Plan</OPTION1>
<OPTION2>PDMR</OPTION2>
<OPTION3>Project Vision</OPTION3>
<OPTION4>Resource Plan</OPTION4>
<ANSWER>PDMR</ANSWER>
</Main>
- <Main>
<QUESTION1>110</QUESTION1>
<QUESTION>_____is the monthly mechanism to record and track metrics of the
projects</QUESTION>
<OPTION1>Work Plans</OPTION1>
<OPTION2>PMR</OPTION2>
<OPTION3>PDMR</OPTION3>
<OPTION4>ASR</OPTION4>
<ANSWER>PDMR</ANSWER>
</Main>
- <Main>
<QUESTION1>111</QUESTION1>
<QUESTION>Process improvements cannot be suggested by anyone in
Wipro</QUESTION>
<OPTION1>TRUE</OPTION1>
<OPTION2>FALSE</OPTION2>
<ANSWER>FALSE</ANSWER>
</Main>
- <Main>
<QUESTION1>112</QUESTION1>
<QUESTION>At vertical level, metrics are reviewed by management in</QUESTION>
<OPTION1>Quality Improvement Council</OPTION1>
<OPTION2>Management Review Meeting</OPTION2>
<OPTION3>Quality Review Meeting</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Quality Improvement Council</ANSWER>
</Main>
- <Main>
<QUESTION1>113</QUESTION1>
<QUESTION>Group that works on the definition of the procedures and guidelines
used by projects is</QUESTION>
<OPTION1>SQA</OPTION1>
<OPTION2>SEPG</OPTION2>
<OPTION3>Tools group</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>SEPG</ANSWER>
</Main>
- <Main>
<QUESTION1>114</QUESTION1>
<QUESTION>Testing helps in validating__________</QUESTION>
<OPTION1>Design</OPTION1>
<OPTION2>Technology</OPTION2>
<OPTION3>Requirements</OPTION3>
<OPTION4>Technical skills</OPTION4>
<ANSWER>Requirements</ANSWER>
</Main>
- <Main>
<QUESTION1>115</QUESTION1>
<QUESTION>New process enters velociQ through</QUESTION>
<OPTION1>Queries and PIP</OPTION1>
<OPTION2>Project Performance Analysis</OPTION2>
<OPTION3>Audit findings</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>116</QUESTION1>
<QUESTION>In a six sigma project, the mentor / facilitator is a
__________</QUESTION>
<OPTION1>Black Belt</OPTION1>
<OPTION2>White Belt</OPTION2>
<OPTION3>DM</OPTION3>
<OPTION4>Green Belt</OPTION4>
<ANSWER>Black Belt</ANSWER>
</Main>
- <Main>
<QUESTION1>117</QUESTION1>
<QUESTION>Difference between actual effort and planned effort expressed as a % of
planned effort is</QUESTION>
<OPTION1>Requirements volatility</OPTION1>
<OPTION2>Schedule volatility</OPTION2>
<OPTION3>Effort deviation</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Effort deviation</ANSWER>
</Main>
- <Main>
<QUESTION1>118</QUESTION1>
<QUESTION>Ratio of product size to effort in coding and unit testing phase
is</QUESTION>
<OPTION1>Effort Deviation</OPTION1>
<OPTION2>Overall Productivity</OPTION2>
<OPTION3>CUT productivity</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>CUT productivity</ANSWER>
</Main>
- <Main>
<QUESTION1>119</QUESTION1>
<QUESTION>Which model is not used for new product development?</QUESTION>
<OPTION1>V-Process model</OPTION1>
<OPTION2>Iterative Process model</OPTION2>
<OPTION3>Production Support process model</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Production Support process model</ANSWER>
</Main>
- <Main>
<QUESTION1>120</QUESTION1>
<QUESTION>In Veloci-Q, three tier structures consist of which section?</QUESTION>
<OPTION1>Policies section</OPTION1>
<OPTION2>Procedure section</OPTION2>
<OPTION3>Guidelines section</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>121</QUESTION1>
<QUESTION>Checklists & templates are process artifacts that help to perform project
activities in a standard manner</QUESTION>
<OPTION1>TRUE</OPTION1>
<OPTION2>FALSE</OPTION2>
<OPTION3>Checklist & template are not mandatory</OPTION3>
<OPTION4>Checklist & template are not process artifacts</OPTION4>
<ANSWER>TRUE</ANSWER>
</Main>
- <Main>
<QUESTION1>122</QUESTION1>
<QUESTION>Change Control Register documents all change requests to baselined
items</QUESTION>
<OPTION1>TRUE</OPTION1>
<OPTION2>FALSE</OPTION2>
<ANSWER>TRUE</ANSWER>
</Main>
- <Main>
<QUESTION1>123</QUESTION1>
<QUESTION>_________ is a technique used for capturing and analyzing customer
requirements.</QUESTION>
<OPTION1>Quality Function Deployment (QFD)</OPTION1>
<OPTION2>Pugh matrix</OPTION2>
<OPTION3>Voice Of Customer (VOC)</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>Voice Of Customer (VOC)</ANSWER>
</Main>
- <Main>
<QUESTION1>124</QUESTION1>
<QUESTION>Which of the following can be used to validate customer
requirements</QUESTION>
<OPTION1>LOC</OPTION1>
<OPTION2>Testing</OPTION2>
<OPTION3>Function points</OPTION3>
<OPTION4>Voice Of Customer (VOC)</OPTION4>
<ANSWER>Testing</ANSWER>
</Main>
- <Main>
<QUESTION1>125</QUESTION1>
<QUESTION>What is the 5th level in CMMI called?</QUESTION>
<OPTION1>Optimized</OPTION1>
<OPTION2>Controlled</OPTION2>
<OPTION3>Managed</OPTION3>
<OPTION4>Defined</OPTION4>
<ANSWER>Optimized</ANSWER>
</Main>
- <Main>
<QUESTION1>126</QUESTION1>
<QUESTION>In CMMI Level 4 stage is described as?</QUESTION>
<OPTION1>Optimized</OPTION1>
<OPTION2>Defined</OPTION2>
<OPTION3>Managed</OPTION3>
<OPTION4>Repeatable</OPTION4>
<ANSWER>Repeatable</ANSWER>
</Main>
- <Main>
<QUESTION1>127</QUESTION1>
<QUESTION>The different categories of development Lifecycle models
are</QUESTION>
<OPTION1>V-process model, 2i, RUP</OPTION1>
<OPTION2>iPAT, veloci-Q, Six Sigma</OPTION2>
<OPTION3>Development, maintenance, service, testing etc</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>V-process model, 2i, RUP</ANSWER>
</Main>
- <Main>
<QUESTION1>128</QUESTION1>
<QUESTION>Who is responsible for preparing the estimate?</QUESTION>
<OPTION1>Business Development Manager</OPTION1>
<OPTION2>Presales staff</OPTION2>
<OPTION3>Delivery Manager</OPTION3>
<OPTION4>Project Manager</OPTION4>
<ANSWER>Project Manager</ANSWER>
</Main>
- <Main>
<QUESTION1>129</QUESTION1>
<QUESTION>Which of this is planned mechanism for progress reviews?</QUESTION>
<OPTION1>Look Ahead Meetings</OPTION1>
<OPTION2>Customer feedback</OPTION2>
<OPTION3>PDMR and PMR reviews</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>PDMR and PMR reviews</ANSWER>
</Main>
- <Main>
<QUESTION1>130</QUESTION1>
<QUESTION>Choose the right one: Process model suitable for development
project.</QUESTION>
<OPTION1>Waterfall Development model</OPTION1>
<OPTION2>Iterative model</OPTION2>
<OPTION3>V-Process model</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>All of the above</ANSWER>
</Main>
- <Main>
<QUESTION1>131</QUESTION1>
<QUESTION>The set of actions to be taken when the probable risks occur ; are
documented as a part of</QUESTION>
<OPTION1>Defect Prevention Report</OPTION1>
<OPTION2>Risk Tracker</OPTION2>
<OPTION3>Mitigation Plan</OPTION3>
<OPTION4>Contingency plan</OPTION4>
<ANSWER>Mitigation Plan</ANSWER>
</Main>
- <Main>
<QUESTION1>132</QUESTION1>
<QUESTION>The Six Sigma technique/tool recommended for Analyzing Requirements
is</QUESTION>
<OPTION1>FMEA</OPTION1>
<OPTION2>Pugh Matrix</OPTION2>
<OPTION3>Voice of Customer</OPTION3>
<OPTION4>RCA</OPTION4>
<ANSWER>Voice of Customer</ANSWER>
</Main>
- <Main>
<QUESTION1>133</QUESTION1>
<QUESTION>DMAIC stands for</QUESTION>
<OPTION1>Do, Measure , Add, Improve, Control</OPTION1>
<OPTION2>Define, Measure , Add, Improve, Control</OPTION2>
<OPTION3>Define, Measure , Analyze, Improve, Control</OPTION3>
<OPTION4>Define, Measure , Add, Improve, Check</OPTION4>
<ANSWER>Define, Measure , Analyze, Improve, Control</ANSWER>
</Main>
- <Main>
<QUESTION1>134</QUESTION1>
<QUESTION>In project context what is to be done how is documented in</QUESTION>
<OPTION1>Guidelines section</OPTION1>
<OPTION2>Policies section</OPTION2>
<OPTION3>Procedure section</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Guidelines section</ANSWER>
</Main>
- <Main>
<QUESTION1>135</QUESTION1>
<QUESTION>__________ is a method to track changes in requirements across
different phases of development.</QUESTION>
<OPTION1>Change request</OPTION1>
<OPTION2>Requirements</OPTION2>
<OPTION3>Traceability</OPTION3>
<OPTION4>All of the above</OPTION4>
<ANSWER>Change request</ANSWER>
</Main>
- <Main>
<QUESTION1>136</QUESTION1>
<QUESTION>The managed services framework in Wipro Technologies is governed by
__________ standard.</QUESTION>
<OPTION1>ISO 9001</OPTION1>
<OPTION2>ISO 14001</OPTION2>
<OPTION3>ISO 20000</OPTION3>
<OPTION4>None of the above</OPTION4>
<ANSWER>ISO 20000</ANSWER>
</Main>
- <Main>
<QUESTION1>137</QUESTION1>
<QUESTION>Which of the following is not a valid phase of managed services life cycle
in Wipro Technologies?</QUESTION>
<OPTION1>Design</OPTION1>
<OPTION2>Transition</OPTION2>
<OPTION3>Due Diligence</OPTION3>
<OPTION4>Reverse Transition</OPTION4>
<ANSWER>Design</ANSWER>
</Main>
- <Main>
<QUESTION1>138</QUESTION1>
<QUESTION>OLA in Managed Services stands for</QUESTION>
<OPTION1>Operational Level Contract</OPTION1>
<OPTION2>Operational Level Agreement</OPTION2>
<OPTION3>opportunity Lost Analysis</OPTION3>
<OPTION4>None of the Above</OPTION4>
<ANSWER>Operational Level Agreement</ANSWER>
</Main>
- <Main>
<QUESTION1>139</QUESTION1>
<QUESTION>Outcome based agreements typically include</QUESTION>
<OPTION1>SLA</OPTION1>
<OPTION2>OLA</OPTION2>
<OPTION3>UC</OPTION3>
<OPTION4>All of the Above</OPTION4>
<ANSWER>All of the Above</ANSWER>
</Main>
- <Main>
<QUESTION1>140</QUESTION1>
<QUESTION>Managed Services engagements typically</QUESTION>
<OPTION1>Don't need any governance</OPTION1>
<OPTION2>Are governed by a contract as desired by the customer</OPTION2>
<OPTION3>Are governed by outcome based agreement</OPTION3>
<OPTION4>None of the Above</OPTION4>
<ANSWER>Are governed by outcome based agreement</ANSWER>
</Main>
</NewDataSet>