RSMQCM FJ3D503L
RSMQCM FJ3D503L
Page
COVER SHEET 1
INTRODUCTION 4
SECTION I – ORGANIZATION 10 - 17
SECTION I – INSPECTIONS 44 - 47
These manuals have been prepared in accordance with the current Code of Federal Regulation (CFR)
and the policies of Leach International North America and set forth the requirements and policies of this
Repair Station, which are to be observed by all employees. Observance of this procedure will assure
compliance with the requirements of 14 CFR Part 145 of the Code of Federal Regulation. This
compliance is required to obtain and retain a Federal Aviation Administration Repair Station Certificate.
Leach International North America is physically located at 6900 Orangethorpe Avenue in Buena Park,
CA 90620. The mailing address is 6900 Orangethorpe Ave, Buena Park CA 90620. The telephone
number is 714 739-0770.
Note: The corporate names of Leach International-North America (LINA), and Leach International
function as Leach International’s Repair Station No. FJ3D503L. These terms for the repair station are
all interchangeable as utilized in this document.
These manuals explain the operation of the Repair Station and the internal inspection system in detail,
including continuity of inspection responsibility.
The general repair, overhaul, or alteration of products will be performed in accordance with the current
CFR, manufacturer’s data, drawings, specifications, and bulletins, or other technical data approved or
accepted by the FAA for the particular product.
This repair station will not repair or alter any item for which it is not rated, and will not repair or alter
any article for which it is rated if it requires technical data, equipment, materials, facilities, or trained
personnel that are not available.
The technical library, this Repair Station Manual (RSM) and Quality Control Manual (QCM) are
required for the operation of this repair station, and will be maintained in a current status at all times.
All Repair Station Personnel on the RSM/QCM organizational chart, responsible for the repair station
effort, will be provided immediate intranet access to controlled electronic copy of these manuals. Repair
Station Management is responsible for seeing that all supervisory and inspection personnel have access
to and thoroughly understand the manuals’ contents, and adhere to their provisions.
The performance of any repair, alteration, or required inspections for an air carrier or commercial
operator having a continuous airworthiness program under 14 CFR, Part 121, 125, or 135 will be
performed in accordance with the requirements of 14 CFR Part 145.
Rev. No. Rev. Date Rev. No. Rev. Date Rev. No. Rev. Date
N/C 04-21-80
A 01-18-84
B 02-03-84
C 01-20-87
D 11-27-91
E 01-11-92
F 02-03-92
G 02-08-94
H 03-04-94
J 11-08-95
K 01-30-97
M 05-10-98
N 04-20-00
P 05-18-01
R 03-08-02
S 07-18-03
T 01-30-04
U 04-15-05
V 05-24-05
W 09-27-05
X 02-01-08
Y 09-02-08
AA 09-16-08
AB 10-30-09
AC 02-19-10
AD 04-25-11
AE 12-19-11
AF 04-10-13
AG 1/29/14
AH 09/26/14
AJ 09/02/15
The RSM and QCM will be available by access to the company intranet and on the company web site
(www.esterline.com). If the website copy is unattainable, please email [email protected] to
obtain a copy by email. Hard copies may be printed but are considered uncontrolled. Repair station
personnel must verify that any hard copy they are using is of the current revision before initiating any
repair station activities. This may be accomplished by verifying the revision available on the company
intranet. CHDO is provided by the hard copy. Obsolete hard copies shall be either destroyed or removed
from repair station to prevent usage.
RSM/QCM AUDITS
The Manager, MSC/Supervisor, Repair Station will perform an audit of the company intranet and
website monthly to verify that the posted manuals are current. A record of the audit will be made
documenting the revision posted on the intranet website, the revision available at Quality Management
Systems, the revision posted on the internet website, the name of the Manager, MSC/Supervisor, Repair
Station and the date performed will be documented on form MSC-032 (See Forms Manual 512-0010-
000-000). The audit record will be maintained in the RSM/QCM information binder retained in the MSC.
Records of these audits will be retained for minimum two years.
The RSM/QCM will be revised in its entirety under a single revision letter and date. All pages will carry
the same revision date. Asterisks or bars will be placed in the margins of changed paragraphs to identify
changes. Change notifications will be documented and stored to indicate the changes and nature of the
changes. In cases where the manuals and FAR undergoes major changes, requiring extensive changes to
the RSM/QCM, it is permissible to annotate “complete revision” and forego the asterisks or bars. A
change notification record should be documented to indicate the nature of the complete revision.
REFERENCED PROCEDURES
Procedures referenced in the RSM/QCM, and any procedures referenced in those procedures essential
to the operation of the repair station, shall be provided to the FSDO for review. Revisions to these
referenced procedures shall also be provided to the FSDO within 5 business days. Any revisions
determined to be noncompliant to the FARs by the FAA will require immediate revision to attain
compliance with the FARs.
SECTION I
ORGANIZATION
Solid lines represents the oversee relationship on directing the work performed under the repair
station/Dotted lines represent administrative reporting functions only.
The Manager, Quality Systems is responsible for providing adequate plant facilities, i.e., equipment,
material, and personnel for operation of the Repair Station in compliance with applicable Code of Federal
Regulation. This includes compliance with design requirements and the procedures specified herein, as
appropriate, to process items received, repaired, replaced or delivered by the repair station.
12. Submit proper reports of any serious failure, malfunction, or defect via web-site http://av-
info.faa.gov/sdrx/.) in accordance with 14 CFR Part 145 as referenced in the Forms
Manual.
The duties of the Manager, Quality Systems may be delegated to qualified individuals as necessary;
however, such delegation does not relieve the Manager, Quality Systems of these overall responsibilities.
The Manager, Quality Engineering is responsible to the Accountable Manager (Manager, Quality
Systems) for the overall operation of the Quality Engineering functions.
1. Review MRR (Material Rejection Report) and performs trend analysis to assure appropriate
corrective action is taken to resolve any system major product non-conformance.
2. Supervise the stamp control functions per QAP 1.8
The duties of the Manager, Quality Engineering may be delegated to qualified individuals as necessary;
however, such delegation does not relieve the Manager, Quality Engineering of the overall
responsibilities.
PERSONNEL/TECHNICIANS-(REPAIR STATION)
The Repair Station personnel/technicians are directly responsible to the Manager, MSC/Supervisor,
Repair Station for the following operations. Personnel consist of Operators, and support personnel. They
are responsible to:
1. Perform the repair functions and ascertain that all Repair Station work is performed in compliance
to established workmanship standards, and applicable specifications.
2. Provide continuity of repair sequence and assure completion of such when personnel shift or
assignment changes occur.
3. Ensure that no defective or un-airworthy piece parts are installed in any product or unit released by
the Repair Station.
4. Ensure proper identification of all products.
5. Ensure that rejected and unserviceable products are handled in such a way as to prevent their re-use
as serviceable products.
6. Utilize all practices, standards, and techniques, as approved the repair station, in performing
maintenance in accordance with approved data and the RSM/QCM.
INSPECTION PERSONNEL
The Inspection personnel are directly responsible to the Manager, Quality Engineering for the following
operations:
1. Perform the Inspection functions and ascertain that all Repair Station work is performed in
compliance to established workmanship standards, and applicable specifications.
2. Ascertain that all in-process and final inspections are properly performed on completed work before
it is released to service, and that the inspection and maintenance records, reports and forms, required
for such release, are properly executed.
3. Provide continuity of inspection, and assure completion of required inspections when personnel shift
or assignment changes occur.
4. Ensure that no defective or un-airworthy piece parts are installed in any product or unit released by
the Repair Station.
5. Ensure proper identification of all products.
6. Ensure that rejected and unserviceable products are handled in such a way as to prevent their re-use
as serviceable products.
7. Make monthly checks on all inspection tools and test equipment located in the In-Process Inspection
and Final Inspection areas to determine that the calibration due date has not been exceeded.
The Manager, MSC/Supervisor, Repair Station is responsible to the Accountable Manager, Manager,
Quality Systems for the operation of the MSC and supervises the repair or overhaul of repairable
components. The Manager, MSC/Supervisor, Repair Station duties and responsibilities are to:
1. Supervise and direct the activities of MSC through the personnel indicated on the organization chart.
Assure the maintenance of all records, supplies and services necessary to properly process MSC items.
2. Assure the proper maintenance of files of complete Material Service Center Routers in such a manner
that the file pertaining to a specific repaired item can be readily located for review.
3. Schedule and prioritize workflow in the Material Service Center.
4. Review and approve all repair and test data generated for the repair prior to approving 8130-3 tag.
5 Sign and stamp all required Repair Station documentation and Return to Service Tags per 14 CFR
Part 145.
6. Ensure that no defective or un-airworthy piece parts are installed in any product or unit released by
the Repair Station.
7. Ensure proper identification of all products.
8. Ensure that rejected and unserviceable products are handled in such a way as to prevent their re-use
as serviceable products
9. Supervise and direct repair station personnel performing the repair functions. Ascertain that all
Repair Station work is performed in compliance to established workmanship standards, applicable
specifications/approved data, and the requirements of the RSM/QCM/RSTM.
10. Provide continuity of repair sequence and assure completion of such when personnel shift or
assignment changes occur.
11. Act on behalf of the Manager RS/MSC as required supporting the repair station.
12. Perform Final Inspection of all parts being returned to service. Final Inspection Repair Station
personnel must be certified under 14 CFR Part 65.
13. Is responsible for controlling, bonding, issuing, and maintaining logs on the Operations stamps.
14. Responsible for maintaining the repair station roster. Changes to the roster will be incorporated
within 5 days.
15. Responsible for maintaining a historic record of RSM/QCM revisions.
16. The Manager, MSC/Supervisor, Repair Station has been delegated authorization to mark operations
as ‘N/A’ (not applicable) per OPR 017 for routers, on specific returns, when they are not required at
the discretion of the Accountable Manager.
17. The Manager, MSC/ Supervisor, Repair Station is responsible for assuring that the training schedule
is reviewed
and that training is conducted when required
18. Back-Up responsibility for control of Technical data and control of Calibration functions.
The duties of the Manager, MSC/Supervisor, Repair Station may be delegated to qualified individuals,
as deemed necessary; however, such delegation does not relieve the Manager MSC/Supervisor, Repair
Station of these overall responsibilities.
The Supervisor, Repair Administrative is responsible to the Manager, Quality Systems for the
administrative functions only and indirectly reports to Manager MSC/Supervisor, RS
The duties and responsibilities of, Supervisor, Repair admin. is strictly administrative
ENGINEER REPAIRS
The Engineer/RS is responsible to the Manager, MSC/Supervisor, Repair Station for the repair
engineering functions.
1. Defines the sequence of operations by creating, releasing and controlling Repair station routers.
2. Helps perform failure analysis, tolerance studies, and participates in the troubleshooting/root
cause/corrective action process for repair station.
3. Reviews and writes assembly and process procedures for product repair.
4. Documents repair process requirements by creating product repair specifications.
5. Provide engineering evaluation as required on the MSC-002 returned Goods Analysis sheet.
The, Supervisor Quality Control is responsible to the Manager, Quality Engineering for the
administrative Quality Control functions.
MSC COORDINATORS
The MSC Coordinators are directly responsible to Manager, MSC/Supervisor, Repair Station for the
following functions. They are responsible to:
1. Respond to customer e-mail, fax or telephone correspondence and review purchase orders.
2. Receive Repair Station return goods to repair station.
3. Issue returns authorization numbers and generate job orders.
4. Create and distribute for signature, 8130-3 Airworthiness Tags.
5. Ship repaired units back to the customer for Repair Station.
6. Communicate with customers regarding “Beyond Economic Repair” and part disposition issues for
Repair Station.
1. Receive and inspect packaging of all repair station returned products in the MSC department
2. Unpack repair station returned products and review any non-conformance information supplied
by the customer. Enter information related to new receipts into ERP system
3. Submit documentation and non-conformance information to MSC coordinator
4. Move repair station returned products to initial work stations for processing
5. Performs miscellaneous support functions for MSC department as needed.
SECTION II
EMPLOYMENT SUMMARIES
The employment summaries of all persons on the required repair station roster responsible for
compliance to this procedure are maintained by Manager, MSC/Supervisor, Repair Station and are
available for review upon request. The employment summary must contain enough information on
each individual listed on the repair station roster to show compliance with the experience requirement
of 14 CFR 145.151, which states that repair station personnel must have the training, knowledge, and
experience to perform maintenance, preventive maintenance, or alterations authorized by the repair
station certificate. As a minimum the employee summary must include: 1) present title, 2) total years’
experience and type of maintenance work performed, 3) past relevant employment with names of
employers and periods of employment, 4) scope of present employment, 5) type of mechanic or
repairman certificate held and the ratings on that certificate.
SECTION III
OPERATIONS
GENERAL OVERVIEW
The repair station tests, repairs, and overhauls products listed in the FAA approved Capability List. For
a complete list of repairable products see the capability list, 512-0006-001-000, maintained by Quality
Assurance. The document is available at the company web site (www.esterline.com) as a PDF file. The
center of repair station operations is located in the MSC. Parts initially received at the receiving dock
are brought to the MSC in their original packaging and placed on the receiving shelf. Items too large or
heavy to be placed on the receiving shelf may be placed next to the shelf on the floor. MSC personnel
open the packaging, check for identification and damage, review all accompanying paperwork, and enter
the parts into the system. Routers are generated for each receipt and the part(s) is (are) routed to the shop
floor for preliminary visual inspection, preliminary inspection (functional test), analysis, and repair.
Certified Repairmen perform final inspection by inspecting repaired parts and reviewing paperwork to
ensure parts are acceptable for return to service. A certified repairman will then approve the item for
return to service by signing a FAA form 8130-3, Authorized Release Certificate. The parts are returned
to the MSC for out-processing and then moved to the shipping area for packaging and shipment. The
instruction 512-0006-002-000 (Repair Procedure for Returned Goods requiring return to service tag
8130-3) details the repair station’s operations which describes how the maintenance is to be performed,
where it would start, and how it progresses through the entire repair cycle for an approval for return to
service.
Products in warranty, which can be economically repaired, will be authorized for repair and processing
in accordance with the router. The letter “R” will suffix date codes applied on the repaired products. The
suffix letter “T” will signify tested only and found acceptable upon return.
Products deemed not economically repairable, or out of warranty, will be withheld from further
processing pending MSC, and/or customer disposition.
Repair Station personnel will be trained to be familiar with the methods, procedures and equipment
required to assure conformance to requirements and airworthiness of articles processed.
OPERATIONS
WORK ORDER
The MSC will enter receipt by Returned Material Authorization Number (RMA) in the MSC Database.
A file containing customer documentation received will also be established. All available information
about the returned goods are entered into the MSC database. This includes the FAA Repair Station
number, RMA number, customer name, date of receipt, Purchase Order number (if applicable), part and
model numbers, warranty information, etc. The MSC database is used to generate a MSC Analysis form,
MSC-010 (See Forms Manual), which accompanies the parts throughout processing. A MSC Router or
Overhaul Router is prepared by the MSC that identifies the progressive steps necessary to verify the
reason for return and to perform any repair necessary to repair the part. As a supplement to the routers,
detailed repair instructions are contained in the FAA approved document 512-0006-002-000, Repair
Procedure. Generic MSC Routers are available for each product line and a specific Overhaul Router is
available for the 9207-10296 primary trim relay. Repair Station routers are printed on light green paper
stock to facilitate identification. The returned goods and associated paperwork are issued to the
appropriate work center to begin processing.
RECORD OF WORK
The MSC Analysis form, MSC Router or Overhaul Router (as applicable), and all other documentation,
generated to provide a record of all work performed by the repair station, will be maintained for a period
of at least ten years in accordance with QAP 2.3. The records are maintained in the MSC onsite two
years minimum. Thereafter records will be archived and stored at a commercial offsite document storage
facility for the remainder of the required years.
PRELIMINARY INSPECTION
Products received in the MSC for repair will be given a preliminary inspection per section I of the QCM.
PROGRESSIVE INSPECTION
Progressive Inspection of products received in the MSC for repair will be performed per section I of the
QCM.
OPERATIONS
HANDLING OF PARTS/PRODUCTS
All items or products undergoing repair or alteration in the repair station shall have the product parts
segregated and in containers in order to assure that all parts of the same unit(s) are kept together. Suitable
trays, bags, and protective covers (as required) are to be provided to the shop areas to assure maximum
protection of all products. During handling of parts, if for any reason, a person believes any part is not
an approved part, (SUP - suspected unapproved part), it should be reported to
management/supervision for reporting per section III of the RSM. Reasons for suspicion of non-approval
may include findings such as a different finish, size, color, improper (or lack of) identification,
incomplete or altered paperwork, or any other questionable indication. Personnel handling aviation
articles always need to exercise caution not to damage the articles. Parts labeled as ESD sensitive shall
be handled in accordance with 550-0006-000-000, Electrostatic Discharge (ESD) Control Procedure.
PRODUCT FINISHING
Plating, painting, and finishing are accomplished in areas segregated from the assembly areas.
PRESERVATION OF PRODUCTS
Products are preserved in accordance with acceptable industry standards. To afford suitable protection
against humidity, extreme temperature, dust, rough handling or other damage, product will be preserved
by wrapping in suitable containers, plastic bags, and/or rigid boxes containing suitable shock absorption
materials.
OPERATIONS
SHELF LIFE
The Manager, Quality Systems is responsible for Shelf Life Control and the Repairman are back-up for
this function. Age sensitive material shall be inspected and processed in accordance with the material
specification temperature storage requirements and QAI 303, Control of Age Sensitive Materials.
Material shall be received, verified, logged, labeled and properly stored and monitored as documented
in QAI 303 Control of Age Sensitive Materials. First-In-First-Out (F.I.F.O.) system for issuance of all
age-sensitive material shall be used. When material is issued to the Repair Station, the Repair Station
personnel shall monitor the age sensitive material for correct storage and expiration date. Stores and
Repair Station personnel shall assure that any age sensitive material being transferred from the original
container and distributed into smaller quantities, has a shelf life label installed on the smaller container.
Quality Control inspection shall verify the accuracy of the age sensitive label being transferred.
Repairman/designee shall contact QC personnel for inspection acceptance stamp. The shelf life label
shall contain the following information as a minimum:
a) Part number
b) Trace number
c) Shelf Life expiration date
d) Inspection Acceptance Stamp
For action on purging and proper disposition of expired age-sensitive material, QAI 303 Control of Age-
Sensitive Material procedure shall be followed.
Materials, parts and supplies shall be stored in a restricted warehouse area and issued only upon a
properly executed material requisition.
OPERATIONS
RELEASE TO SERVICE
The MSC Analysis Form will be completed by Repair Station personnel as listed on Repair Station
roster. The product shipping documentation, identified as repaired and serviceable, will be processed
and forwarded together with the MSC Router or Overhaul Router, a completed 8130-3 Airworthiness
Approval Tag (See Forms Manual) signed by an FAA Certified Repairman for each item and a copy of
the MSC Analysis form to Shipping Inspection for acceptance and delivery.
The MSC Router or Overhaul Router, together with the MSC Analysis Form, Shipping, and Customer
documentation, will be maintained on file in this Repair Station for a period of not less than two (2) year
onsite (see section IX for off-site storage requirements).
PARTS SUBSTITUTIONS
An unapproved part is any part that does not meet the requirements of an “approved part” as defined
in FAA Advisory Circular 21-29 (as revised). This term also includes parts that have been improperly
returned to service (contrary to 14 CFR Parts 43 or 145).
When a suspected unapproved part is discovered, this repair station will immediately notify the FAA by
calling the FAA Aviation Hotline at 1-800-255-1111 or 1-866-835-5322 by email to 9-AWA-ASY-
[email protected] or to the physical address shown below. All suspected unapproved
parts reported will be identified and quarantined in the repair station pending further investigation by
FAA Personnel. The complete electronic copy of FAA Form 8120-11 may be sent electronically via
internet site.
The FAA Certified Repair Station No. FJ3D503L shares facilities with Leach International, which is
completely housed in a two bay concrete tip-up building of approximately 100,000 square feet. The area
is divided as follows:
45,000 square feet of Electronics manufacturing, including fabrication, assembly and test.
Products manufactured include relays, printed circuit board assemblies, hybrid microcircuits and
mechanical assemblies. Approximately 20,000 square feet of this is shared with the repair station.
The shared areas (see figure on next page) are the MSC area (1) , the Subminiature group A
screening and electrical test areas (2) , the entire Power & Control manufacturing and test areas
(3) , the entire Equipment area (4) , the Hybrid electro-mechanical assembly and electrical test
areas (5) Environment and Burn-in test area (6) .
8,000 square feet of material handling area including receiving inspection and calibration (7),
stores (8), receiving and shipping (9) and maintenance (10). These areas (less shipping and
receiving) provide indirect support to the repair facility. PDA (Power Distribution Area)/ LIE
(Leach International Europe) Product Repair Area and LIE (Leach International Europe)
Consignment Stock (11).
34,000 square feet of offices, including administration, accounting, engineering and sales, and
cafeteria.
The building is heated by natural gas and air conditioned by approximately 400 tons of air conditioning
package units. Lighting in the assembly areas is maintained at 100 monitored foot-candles at the bench
level. The building is fully sprinkler equipped and remotely monitored. Security guards provide 100%
coverage. Facility power is supplemented by 934 KVA of 400 Hz generators and 4000 amps of 28vdc
power for testing and evaluation. Additional services routed throughout the manufacturing area include
Nitrogen, CO2, compressed air and chilled water.
A class 100,000 Clean Room supports Hybrid manufacturing and a class 100 Clean Room supports relay
Millipore Inspection. Numerous Laminar flow benches are utilized for relay adjustment prior to sealing.
Hazardous materials are identified as required by regulation and flammable substances are retained in
fire safe cabinets until required. Painting is performed in an isolated room (see Facility Floor Plan).
Repair station work orders are identifiable (segregated) by the utilization of a unique light green paper.
Airworthy components are identified (segregated) by the attached 8130-3 tag. Non-repairable parts
remain on the receiving shelf in MSC until return to the customer or until they are identified as scrap
and rendered inoperable.
The repair station shall not change location of its housing without written approval from the FAA.
The repair station shall not make any changes to its housing or facilities required by 14 CFR Part 145.103
that could have a significant effect on its ability to perform maintenance, preventive maintenance,
overhaul, or alterations under its repair station certificate and operations specifications without written
approval from the FAA.
If the repair station does change its location, housing, or facilities, it will adhere to any FAA prescribed
conditions, including any limitations, under which a certified repair station must operate during the
change.
DESCRIPTION OF EQUIPMENT
The equipment utilized by the repair station encompasses a wide variety ranging from standard hand
tools (screwdrivers, wrenches, calipers, etc.) to custom designed welding fixtures. Examples of tooling
include modified hand tools used for adjusting relays, vacuum and standard ovens, environmental
chambers (hot/cold), custom assembly tooling, custom holding fixtures for assembly and destructive
testing, aqueous and solvent cleaning systems, laser sealing systems, scales, power supplies, volt and
current meters oscilloscopes, custom electronic test equipment, microscopes, soldering equipment,
automated wire cutting devices, paint guns and compressors, labeling machines, plating tanks and racks,
etc.
EQUIPMENT LISTINGS
Equipment required to support the ratings held are listed in the various process specifications utilized to
perform the repair functions. A list of calibrated equipment is available at the Calibration department. It
is maintained as an electronic recall system and can be printed if required. Operators are required to
verify the currency of all calibration labels prior to using any calibrated equipment.
LEASED EQUIPMENT
At this time there is no intent to rent or lease any equipment necessary for the repair of product.
PREVENTIVE MAINTENANCE
Equipment requiring preventive maintenance is listed on the Facilities computerized preventive
maintenance system. Similar to the automated calibration recall system, this system generates reports of
equipment coming due for preventive maintenance. New equipment requiring preventive maintenance
is entered into the system and obsolete equipment is deleted as necessary. A list of equipment requiring
preventive maintenance is available from the Facilities department computerized preventive
maintenance system as described in FAC 000, Preventive Maintenance.
SECTION IV
CAPABILITY LIST
CAPABILITY LIST
The capability list includes all products currently repaired and overhauled by Leach International North
America known to be used on type certificated (TC) vehicles. This list is maintained by Quality
Assurance. The list includes both Parts Manufacturer Approval (PMA) parts and non-PMA parts with
identified TC use. The list is formulated from information provided by the Sales department and review
of the MSC repair station database. It is posted to the intranet and at the company web site
(www.esterline.com) as a PDF file and is under revision control. The list shall be revised as new TC
usage product is identified. Upon revision, a new revision is posted in both the company intranet and the
company web site under Product Support. The FAA Flight Standards District Office (FSDO) is notified
of revisions to the capabilities list by e-mail (cover letter) that lists the revisions and the new revision is
available to the FSDO through the company web site. If the website copy is unattainable, please email
[email protected] to obtain a copy by email.
Record the name of the person performing the self-evaluation, the product model number, and the source
of the request on the checklist. Verify the repair station is rated to perform maintenance on the product.
If the model number is a current production product, then the repair station has adequate housing and
facilities, necessary the special tools and test equipment recommended by the manufacturer, and the
equipment, materials, and qualified personnel necessary to perform maintenance on the product. Verify
that approved repair data either exists for the product family or has been submitted for approval.
Once the self-evaluation checklist is completed and indicates that the repair station has the capability
and resources necessary to perform the repair, the Manager, MSC/Supervisor, Repair Station, or her/his
designee forwards the self-evaluation form to the Manager, Quality Systems by either hard copy or e-
mail. The self-evaluation checklist is reviewed and approved by Manager, Quality Systems. If the self-
evaluation is found to be unacceptable, the item under consideration will not be added to the capability
list and the customer will be notified.
SECTION V
SECTION VI
All work associated with the repair, alteration, and overhaul of products by this repair station is
performed at Leach International North America in Buena Park. Should the need arise to perform the
repair, alteration, and overhaul of products at other locations, Leach International North America shall
make the appropriate Operations Specification change request to the FAA-FSDO and will revise this
manual to meet the requirements of FAR 145.203 prior to performing any such activity.
SECTION VII
MAINTENANCE OF 14 CFR PART 121, 125, AND 135 AIRCRAFT AND FOREIGN
CARRIERS OR PERSONS UNDER 14 CFR PART 129
This repair station will perform this work in accordance per the operator’s purchase/repair order and in
compliance with each air carrier or operator’s continuous airworthiness maintenance program and
applicable sections of maintenance manuals, where existing. The repair station shall also follow the
operator’s FAA approved inspection program, when specified. If the operator’s purchase/repair order
reference specifications, orders, manuals are other than Leach specifications; the Repair Station will
contact the operator prior to any work. Correspondences with each operator will be maintained in the
Repair Station when specific manuals or other instructions are not available/applicable. This repair
station will maintain a current copy of the applicable section of each operator’s manual, when required
by the operator’s purchase/repair order that contracts with this repair station for the performance of that
operator’s maintenance. The Manager, MSC/Supervisor, Repair Station will be responsible for keeping
current repair documents and/or manuals as required by the operator’s purchase/repair order available in
the Repair Station. In the absence of specific instruction, the repair station will not perform maintenance
until such instruction is provided. MSC and Overhaul routers will be issued upon compliance with
operator’s requirements.
SECTION VIII
CONTRACT MAINTENANCE
All work associated with the repair and alteration of products by this repair station is performed at Leach
International North America in Buena Park. This section is not applicable for the repair station as no
work is contracted out. At this time there is no intent to contract out repair station work. Should the need
arise for contracted maintenance functions, Leach International North America will revise this manual
to document the procedures for controlling contracted maintenance and shall submit a list of contractors
per the requirements of 14 CFR Part 145.217. The contract maintenance functions must be approved by
the FAA prior to their use.
SECTION IX
RECORDS
All documentation generated during product repair is maintained in hard copy format and filed by RMA
number. This data is maintained in the MSC files for at least two years. After two years the data can be
transferred off site to a contracted data storage facility for retention and retrieval per QAP 2.3, Data
Retention/Data Control. The minimum retention period for all data is ten years from return to service.
SECTION I
INSPECTIONS
GENERAL
This section documents the procedure for establishing and maintaining the inspection of raw materials
to ensure acceptable quality, performing preliminary inspection of all product that are maintained or
modified, the inspection of all products involved in an accident for hidden damage, and performance of
the final inspection and approval for return to service for maintained product.
In process inspections, function test(s), and or calibration(s) will be accomplished in accordance with
applicable drawings and specifications identified on the current technical data. The individual
performing the task will record each inspection and test at the appropriate sequence and block on the
MSC Router. Operator is responsible for completion status of each prior operation; if a discrepancy is
identified the operator shall notify the area leader. In the event there is work turned over from one shift
to another the area leader is responsible to communicate and assign the specific job. The leader or
Supervisor will take appropriate action per OPR 017 (Production Handling for work-in process).
Product non-conforming conditions will be documented on the MSC Router or Overhaul Router per
QAP 6.1, Control and Review of Nonconforming Material, and either re-worked to applicable drawings
and specifications or will be withheld from further processing pending MSC, and/or customer
disposition.
The MSC Analysis Form MSC-010 will be completed by Repair Station personnel as listed on Repair
Station roster and reviewed by Certified Repairman. The product shipping documentation, identified as
repaired and serviceable, will be processed and forwarded together with the MSC Router or Overhaul
Router, a completed 8130-3 tag (See Forms Manual) signed by an FAA Certified Repairman for each
item and a copy of the MSC Analysis form to Shipping Inspection for acceptance and delivery.
The MSC Router or Overhaul Router, together with the MSC Analysis Form, Shipping, and Customer
documentation, will be maintained on file in this Repair Station for a period of not less than two (2)
years.
SECTION II
At Final Inspection, the Repair Station Inspection personnel shall assure that the MSC Router or
Overhaul Router is complete and correct as the first step of Final Inspection. The Repairman shall review
all paperwork for completeness and correctness prior to preparation of release to service documentation.
In this manner, for each repair/alteration performed, it shall be assured that all necessary operations are
performed and that a record of those responsible is maintained.
STAMPS
Acceptance of work performed by the repair station shall be signified by stamping the appropriate box
on the MSC Router or inspection form along with the date the work is accepted. The Manager, Quality
Systems or his delegates are responsible for assuring that this procedure is adhered to and that Repair
Station stamps for different functions shall be clearly distinct from one another and shall not resemble
the stamps of customers or regulatory agencies. Manager,, Quality Engineering/Designee is responsible
for controlling, bonding, issuing, and maintaining logs on the test and inspection stamps as described in
QAP 1.8, Stamp Control. The Supervisor, Repair Station is responsible for controlling, bonding, issuing,
and maintaining logs on the Operations stamps. Stamp Issue Logs will be maintained to ascertain the
status of any inspection and test stamp in existence at Leach International. Revisions of the Stamp Issue
Logs shall be dated and archival copies maintained for a period of ten years. The Stamp Issue Logs shall
contain the following information as a minimum: date of revision, stamp number issued, the status of
stamp issued, name of stamp holder, department number of stamp holder, stamp issued date, bond date,
comments (condition of bonded stamps, reason for return). Stamps shall be bonded for a minimum of
six (6) months prior to re-issue. Lost stamps are to be reported immediately to the responsible
Department designee. Stamps shall be bonded for a minimum of two (2) years prior to re-issue where
the stamp has been reported as misplaced. Relocated stamps may be removed from two (2) year bond.
AUDITS
Leach Repair Station (FJ3D503L) maintains the audit system that is independent of the components
maintenance repair process and their release to service inspections. The Annual Repair Station Audit is
performed as described in the Quality Assurance System section of the EASA Supplement.
SECTION III
GENERAL
This section documents the procedure for establishing and maintaining proficiency of Repair Station
inspection personnel to assure that they are thoroughly familiar with the applicable regulations and the
inspection methods, techniques, practices, aids, equipment and tools used to determine the airworthiness
of a product.
REQUIREMENTS OF REPAIR STATION INSPECTION PERSONNEL
Inspectors must demonstrate proficiency in using the various types of inspection equipment and visual
aids required prior to performing repair station work. They must pass a written (English) general
examination and must understand, read, and write English. Classroom training examination in English
is considered equivalent to written English examination. The course examination pass/fail criteria shall
follow the requirements listed in 512-0006-003-000 FAA Approved Repair Station Training Program
Manual. The Supervisor Repair Station and or qualified delegate is responsible for assessing the
capability of the inspectors and assuring that only capable persons are issued inspection stamps.
Repair Station inspection personnel require access to and proper knowledge of current technical data to
perform their tasks. They need to be familiar with the RSM and QCM for the repair station, as well as
the applicable federal aviation requirements. The Manager, MSC/Supervisor, Repair Station or designee,
is responsible for assuring that repair station inspection personnel have received training to become
familiar with these documents and assuring that training records are maintained as described in 512-
0006-003-000 Repair Station Training Program Manual.
The Document Control group of the Engineering Services department at Leach controls technical data
utilized for Leach OEM repairs listed on Leach capability list. Current technical data is maintained in
Adept (Engineering Document Control) as described in QAP 2.1, Documentation Control. Manager,
MSC/Supervisor, Repair station is responsible for reviewing Air Carrier Websites as described in MSC
(Material Service Center) procedure 512-0024-000-000 and internal documentation changes,
determining if they significantly affect operations in their area, and performing training if determined to
be of significant effect.
LIE, as OEM, controls technical data utilized for LIE OEM repairs listed on Leach capability list
through LIE controlled Portal(See detailed Instructions in section IV of Quality Control Manual)
The Final Inspection must be conducted by an authorized repairman certificated under 14 CFR Part 65,
and listed on the Repair Station Roster as having such authority. Only certified repairmen may approve
articles for return to service.
Manager, MSC/Supervisor, Repair Station is responsible for monitoring the proficiency of Repair
Station inspection personnel working in their areas and assuring that proficiency is maintained.
Proficiency shall be monitored through observation of work quality and during yearly training. Loss of
proficiency observed as increased repair and rejections shall require immediate retraining.
Repair station management is responsible for assuring that all repair station Inspection Personnel have
employment summary documented as required in the RSM section II.
SECTION IV
TECHNICAL DATA
GENERAL
This section documents the procedure for ensuring that current technical data is available for the scope
of work the repair station is performing. Approval for return to service requires approved technical data
that is acceptable to the FAA. The Manager, Quality Engineering is responsible for Technical Data and
the Manager, MSC/Supervisor, Repair Station is back-up for this function.
CURRENCY OF DATA
Current technical data shall be available to all Repair Station personnel. For performing maintenance,
preventive maintenance, or alterations for an air carrier that has continuous airworthiness maintenance
program under part 121 or part 135, Leach International Repair Station follows the air carrier's
instructions. The latest instructions will be obtained according to process defined in 512-0024-000-000
(Material Service Center Procedure) prior to repair. This is accomplished thru the generation and
maintenance of repair routers. These repair/overhaul routers shall be available for each product family
identified on the capabilities list. These repair/overhaul routers are generated and maintained per OPR
015, Router and Operation Maintenance and bill of materials are maintained per QAP 7.5.1.004.
Examples of repair and overhaul routers are available in section VII of this QCM. The remaining
technical data shall consist of the current revisions of the referenced product control specifications,
manufacturing specifications, and process specifications as specified in the Repair Procedure, 512-0006-
002-000.
For Leach OEM (Original Equipment Manufacturer) product repair at Leach repair station;
1. QAP 2.1, Document Control, controls the currency and availability of this technical data.
2. ENG 003, Document and Data Control, is used to control revisions of this technical data.
For LIE (Leach International Europe) OEM product Repair at Leach Repair Station;
1. LIE is responsible for translating the latest technical data into English and uploading to the LIE
Portal. LIE is responsible to ensure translation is accurate, current and complete. Leach Repair
Engineer is responsible to contact LIE for any discrepancy in translation identified during the
repair process.
2. Leach Repair Station Management/Designee is responsible to ensure all Repair Station
personnel on having access the technical data for repair.
3. LIE is responsible for revision control of Technical Data and notifies Leach Repair Station
management for any technical data revision changes.
4. Leach Information Technology Department is responsible to maintain portal security and issue
the repair station personnel access to the LIE Portal.
5. Leach Repair Station Management is responsible to instruct and ensure the Repair Station
personnel to use the latest revision of technical data.
SECTION V
TOOLS/EQUIPMENT CALIBRATION
All repair station personnel, before using M&TE, are responsible to check that the equipment has a
current calibration label attached. Any piece of M&TE found in the repair station without a current
calibration label attached shall be reported to Calibration and red tagged to prevent use.
Notification of out of tolerance conditions shall be provided by the calibration source. The “Out of
Tolerance Notification Form”, QAF-036 (See Forms Manual) shall be filled out by Leach’s Calibration
Coordinator. Equipment that was identified as out of tolerance shall be immediately brought to the
Manager, Quality Systems’ attention via an “Out of Tolerance Notification Form” for evaluation. The
evaluation shall determine if the out of tolerance condition had any possible detrimental effect on
accepted products and if the equipment requires an interval adjustment. The “Out of Tolerance
Notification Form” shall state the current calibration status, current as found condition including details
of the problem, prior as found condition, previous calibration date, current calibration date and identify
for interval review equipment found out of tolerance during the current and last calibration. All out of
tolerance evaluations shall be completed and returned within 30 days of finding unless required earlier
by Leach’s Calibration Coordinator and kept in each individual instrument’s history file in the calibration
laboratory. When the calibration source supplies its own “Out of Tolerance Notification Form” that form
may be used in lieu of Leach’s form, provided the requirements of QAF-036 are met. Note that Leach
International does not allow personal MT&E tools to be used.
The contracted calibration service certifies the use of standards, traceable to the National Institute of
Standards and Technology, for all calibrations performed.
SECTION VI
DISCREPANCIES/CORRECTIVE ACTION
POLICY/PROCEDURE
Corrective action (C/A) performed to resolve deficiencies is applicable in as least four situations: C/A
as the result of deficiencies noted during the repair/release process, C/A as the result of the analysis of
returned product and C/A to resolve Internal and External audit findings.
Deficiencies noted during the repair/release process are recorded per QAP 6.1, Control and Review of
Nonconforming Processes. The scrap parts control for Repair station is processed according to QAP
6.1.3 Control of Scrap Material and Material Service Center Procedure 512-0024-000-000. Immediate
C/A is the simple repair of the product to a compliant condition for continued processing. Repetitive
noncompliance during the repair/release process indicated the need for review of housing, facilities,
equipment, personnel qualifications, and procedures to ensure that the noncompliance is not a systematic
problem. QAP 6.1, Control and Review of Nonconforming Processes, requires C/A for repetitive
occurrences of any noncompliant condition. QAP 6.3, Corrective/Preventive Action, documents the
formal C/A process on QAF-024 Corrective/Preventive Action Request form.
Repetitive deficiencies, attributed to poor design, poor processing, or inadequate workmanship
conditions, noted during troubleshooting of returned product, require corrective action to preclude the
release of other product with similar deficiencies. QAP 6.3, Corrective and Preventive Action,
documents the C/A process for external returns. In the event that Failure Analysis identifies any evidence
of potential violations of the regulations, the repair station should avail itself of the self-disclosure
program addressed by AC-00-58. Any Failure Analysis identifying manufactured defects that may affect
other released product requires the notification of customers of the possible deficiencies.
See QAP 6.3, Corrective and Preventive Action, for description of the Failure Analysis, C/A process.