CALIBRATION (Control Valve) PDF
CALIBRATION (Control Valve) PDF
a) Air Instrument.
b) Loop Calibrator (4 – 20 mA).
c) Connector.
d) Tubing and ferrule sets.
Example calculation:
A: Max travel from stem = 70mm
B: Scale plate = 50mm
New open adjustment should be (50/70) × 100 = 71.48%
Equipments required
Data sheet,
Hart communicator.
Ask panel man to put the controller in manual mode for control loop.
Isolate the Valve from the process.
WARNING: The Isolation of control valve from the process shall be
done by field operator. Careful step shall be done to
ensure no upset to the operation.
Hook up HART Communicator and verify some parameters by refer to
data sheet such as Tag Number, OP and etc.
Change from normal mode to setup mode.
Select auto find stop (wait some minute).
If full open is more than 100% select open adjustment and put new
number as per calculation.
Make an auto calibration (wait some minute).
Verify the linearity by increasing and decreasing the travel (0%, 25%,
50%, 75%, 100%, 75%, 50%, 25% and 0% of range).
After completion of the job ask panel operator to put loops back in
normal mode.
Fill the calibration form and file it for future reference.
Equipments required:
positioner,
Control valve.
Pressure source.