IQ-PQ-EQ Documents For FDC - IRN75
IQ-PQ-EQ Documents For FDC - IRN75
CONTENTS:
2. Operational Qualification
3. Performance Qualification
4. Handover Certificate
E Q U I P M E N T Q U A L I F I C AT I O N
3. After cooler Shell and tube type air 1 The Nirvana Oil-Free
cooled compressors are suited with
Aluminum tube coolers with
carbon steel shell. The coolers
are shell and tube design. To
protect the after-cooler from
damage due to compressed air
pulsations, the compressed air
is passed in the tubes, and
cooling water in the shell.
4. Inter cooler Shell and tube type air 1 The Nirvana Oil-Free
cooled compressors are suited with
Aluminum tube coolers with
carbon steel shell. The coolers
are shell and tube design. To
protect the intercooler from
damage due to compressed air
pulsations, the compressed air
is passed in the tubes, and
cooling water in the shell.
5. Moisture separator Moisture separator with 1 Moisture separator will
drain valve. condensate solenoid
values
6. Oil Cooler Shell and tube type air 1 The Nirvana Oil-Free
cooled compressors are suited with
admiralty Aluminum tubes
coolers with carbon steel shell
(oil cooler).In oil cooler, water
is in the tube / oil in the shell
7. Safety interlock Pressure switch suitable for 1 Inbuilt safety interlocks
pressure switch water and lubricating oil are available and
monitored in the control
panel
8. Control panel Control panel should have 1
switches for ON & OFF.
E Q U I P M E N T Q U A L I F I C AT I O N
Checked By:
Date:
E Q U I P M E N T Q U A L I F I C AT I O N
INSTALLATION QUALIFICATION
1. Purpose:
The purpose of Installation Qualification is to establish that the equipment and components
are as per the specifications, are checked, calibrated and are installed as per the approved
design.
1. Services to be provided
2.1 A process and instrument All instrument and components As per P&ID
diagram (P and ID) should are to be installed as per P and attached.
be available. ID.
2.2 Calibration of temperature All gauges should be calibrated As per
and pressure transmitters. as per respective SOP Manufacturer’s
global standards
2.3 Main unit assembly. a. The entire assembly of Entire package is
compressor, after cooler, inter mounted on a
cooler and motor shall be common skid
mounted on a common mild and enclosed in a
steel stand to form a compact sound
lay out (skid mounted). accentuated
enclosure
E Q U I P M E N T Q U A L I F I C AT I O N
3. Safety points
E Q U I P M E N T Q U A L I F I C AT I O N
3. References:
E Q U I P M E N T Q U A L I F I C AT I O N
4. Documents to be attached:
7. Recommendations:
OPERATION QUALIFICATION
E Q U I P M E N T Q U A L I F I C AT I O N
1. Purpose:
The purpose of operational Qualification is to establish that individual components and
machine i.e. the entire system as a whole is functioning as specified.
4. Documents to be attached:
7. Recommendations:
PERFORMANCE QUALIFICATION
1. Purpose:
The purpose of Performance Qualification is to confirm that the Air compressor is capable of
producing required moisture, oil free compressed air and is capable of consistently
performing as it is purposed to perform.
4. Documents to be attached:
7. Recommendations: