Commissioning Handbook

This document provides guidance on commissioning methodology for oil and gas plants. It defines commissioning as the process of ensuring a new facility operates as designed through testing, inspection and verification. The document outlines pre-commissioning and commissioning activities to ensure schedule adherence, quality installation, health and safety compliance, and regulatory standards are met before the facility becomes operational. Key steps include preparing systems for testing, verifying controls, starting up equipment, and validating overall performance meets targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
2K views8 pages

Commissioning Handbook

This document provides guidance on commissioning methodology for oil and gas plants. It defines commissioning as the process of ensuring a new facility operates as designed through testing, inspection and verification. The document outlines pre-commissioning and commissioning activities to ensure schedule adherence, quality installation, health and safety compliance, and regulatory standards are met before the facility becomes operational. Key steps include preparing systems for testing, verifying controls, starting up equipment, and validating overall performance meets targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

COMMISSIONING METHODOLOGY

HANDBOOK

Mohamed Ridha. KHALDI


Oil & Gas plants commissioning Process trainer
SUMMARY

1. COMMISSIONING DEFINITION

2. Pre-COMMISSIONING & COMMISSIONING FLOWCHART

3. Pre-COMMISSIONING ACTIVITIES

4. COMMISSIONING ACTIVITIES

5. PROJECT PHASES BREAKDOWN

6. INTERFACES W/OTHER DEPARTMENTS


1. COMMISSIONING DEFINITION

A new facility must operate as it was designed  

Any new facility is considered incomplete until it has been successfully


commissioned and is operating satisfactorily. Programme of testing,
inspection and commissioning will ensure:

Compliance with schedule 

Managing your commissioning can help meet your project targets and
minimise any potential problems during the crucial implementation stage or
once the facility is operational

Quality

Ensuring installation of the facility is completed to high standards so it


works first time, every time

Health and safety

Setting procedures and processes to ensure that commissioning is


undertaken safely

Statutory and regulatory compliance

Validation gives you assurance that your facility has been specified,
designed, installed, commissioned and is operating to standards acceptable to
your requirements and any inspecting authorities.

We can verify facilities through the planning, supervision and


implementation of commissioning activity, including:

 Preparing and cleaning of systems ready for testing


 Initial testing of systems with power, water and air
 Verifying control systems
 Start up of equipment
 Verifying the whole operational process against performance targets.