GUIDELINES IN STREAMLINING THE PROCESSES FOR THE ISSUANCE OF.
BUILDING PERMITS AND CERTIFICATES OF OCCUPANCY
4
orn,
»
OFFICIAL “,
Time Memory OU NO REE,
Joint Memorandum Circular No: 2018-01 — Signature Jy
qi Z, Date Oe Te
Date: January 4, 2018 ‘Stime_— oA
secron gS
“py naconos
1. BACKGROUND Won woo
1
1.2.
13)
14.
President Rodrigo Roa Duterte's 10-point socio-economic agenda includes
“increasing competitiveness and the ease of doing business”, objectives that
have been reiterated in the recently approved Philippine Development Plan
2017-2022, which espouses “people-centered, clean, efficient and effective
governance.” Specifically, the President wants government services to be
more accessible to the people through reduced documentary requirements,
processing time and signatories for transactions. To achieve this, the
administration is adopting a whole -of-government approach that promotes
simplification of government transactions, inter-operability of government
processes and strengthened linkages and coordination among agencies,
The President, in his 2017 State of the Nation Address, reiterated his
directive to all government agencies with frontline services for “speedy
reforms" that will further streamline their respective services to make these
truly efficient and people-friendly and “to ensure that the people receive the
quality services that they surely deserve minus the delays by the
bureaucratic red tape.”
By easing the cost of doing business in the Philippines, the government is also
aiming to raise the overall country’s current ranking of 114* out of 190
economies in the 2018 International Finance Corporation’s (IFC) Doing
Business Report. Specifically, in the criteria on “dealing with construction
permits", the country's rank deteriorated at 101°, still below most ASEAN
countries. The IFC report noted that in the Philippines, securing a
construction permit for a warehouse requires 23 procedures that took 123
days to complete.
In compliance with President Duterte's socio-economic agenda and to
improve the country’s ranking in global competitiveness surveys, the
Department of the Interior and Local Government (DILG), the Department of
Public Works and Highways (DPWH), the Department of Information and
Communications Technology (DICT), and the Department of Trade and
Industry (DT!) are pursuing the streamlining of processes in securing
building permits and certificates of occupancy.2
PURPOSE
‘The overall objectives of this circular are the following:
2. To set service standards in processing building permits and certificates of
occupancy by local government units (LGUs) as well as to provide guidelines
in the streamlining of relevant processes related thereto, consistent with the
provisions of the National Building Code of the Philippines (NBCP)
(Presidential Decree (PD) 1096, s. 1977), the Fire Code of the Philippines
(FCP) (Republic Act (RA) 9514) and the Anti-Red Tape Act of 2007 (ARTA)
(RA 9485) and their respective Implementing Rules and Regulations (IRR).
2.2 To clarify the roles and responsibilities of DILG, DPWH, DICT, DTI, the Bureau
of Fire Protection (BFP), and concerned offices and departments of
cities/municipalities in ensuring the implementation of the necessary
activities for the streamlining of subject processes.
3. LEGAL COMPLIANCE
3.1 Section 301 of the NBCP provides that “No person, firm or corporation,
including any agency, or instrumentality, of the government shall erect,
construct, alter, repair, move, convert or demolish any building or structure
or cause the same to be done without first obtaining a building permit
therefore from the Building Official assigned in the place where the subject,
building is located or the building work is to be done.” The NBCP also
specifies the documentary requirements to be submitted as well as the
general processes that local governments have to follow in approving the
building permit application.
3.2 Section 309 of the NBCP provides that “No building or structure shall be used
or occupied and no change in the existing use or occupancy classification of a
building or structure or portion thereof shall be made until the Building
Official has issued a Certificates of Occupancy therefor as provided...”
3.3 Section 5 paragraph (g) of the FCP provides that no occupancy permit,
business or permit to operate shall be issued without securing a Fire Safety
Inspection Certificate (FSIC) from the Chief, BFP or his/her duly authorized
representative. Furthermore, under Rule 9, Division 1 (¢) of the FCP, the
city/municipal Fire Marshall shall review, evaluate and assess plans, design
calculations and specifications, and issue the necessary building fire safety
evaluation clearance (FSEC) upon determination that the design and
specification is in accordance with the provision of the FCP and its IRR.
3.4 The DPWH National Building Code Development Office Memorandum
Circular No. 1, s. 2005 provides that, until a Building Official (BO) is fully
deputized by the Secretary of Public Works and Highways for a particular
local government, the official designated by the concerned local chief4.
5.
executive through a Special Order to be responsible for the enforcement of
the provisions of the NBCP as well as of its IRR shall serve as BO for said local
government.
3.5 The DILG, DPWH, BFP and LGUs as well as their various instrumentalities
have the authority and power to streamline the processes of securing
construction-related permits, clearances and certificates, consistent with and
supportive of the provisions of pertinent national and local policies to ensure
ease, comfort and convenience to applicants as well as for efficiency and
prompt delivery of services by the government, anchored on the overall
policy of the State to safeguard life, health, property and public welfare.
Scope/Coverage
This Joint Memorandum Circular covers all the Regional and Provincial Directors of
the DILG and DTI, Regional Directors and District Engineers of the DPWH, the DICT,
the BFP, the members of the Sangguniang Panglungsod and Sangguniang Bayan, and
Local Chief Executives of all cities and municipalities.
Definition of Terms
For purposes of this policy, the following definitions apply, unless otherwise stated:
5.1 Applicant Any person, firm, partnership, corporation, head of
government or private institution, organization of any
character applying for the issuance of permits and
certificates.
5.2 Application Form A preformatted prescribed form specified in this circular.
5.3 Backroom ‘A working arrangement among the Office of the Building
Operation Official (BO) and other concerned departments and
offices under the local government, and the BFP where
application and documentary requirements for building
permits and certificates of occupancy are transferred and
moved from one department to another for review,
evaluation and action without the physical interference of
the applicant.
5.4 Estimated Value Measures the value of the construction installed or
ofthe Building/ erected ata given location and may also be considered as
Structure the cost of construction including architectural and
ering work and labor cost as stipulated in the
n Form as duly notarized,5.5 Building Official
(BO)
5.6 Building Permit
5.7 Construction
5.8 Certificate of
Occupancy
5.9 Fire Safety
Evaluation
Clearance (FSEC)
5.10 Fire Safety
Inspection
Certificate (FSIC)
5.11 Notice of
Disapproval
(Nop)
5.12 Office of the
Building Official
5.13 One-Stop Shop
for Construction
Permits (OSCP)
The Executive Officer of the OBO appointed by the
Secretary of Public Works and Highways.
‘A document issued by the BO to an owner/applicant to
proceed with the construction, installation, addition,
alteration, renovation, conversion, repair, moving
demolition or other work activity of a specific
project/building/structure or portions thereof after the
accompanying principal plans, specifications and other
pertinent documents with the duly notarized application
are found satisfactory and substantially conforming with
the NBCP and its IRR.
All on-site work done in the site preparation, excavation,
foundation, assembly of all components and installation
of utilities, machineries and — equipment of
buildings/structures.
A document issued by the Building Official certifying that
the building/structure was completed and can be
occupied/used in accordance with the approved use.
‘A document issued by the BFP as_a pre-requisite for the
grant of Building Permit by the Office of Building Official
having jurisdiction upon determination that the
evaluated plans are compliant with RA 9514 and its IRR.
A document issued by the BFP upon determining that the
required fire safety construction are in place, and fire
protective and/or warning system are properly installed
in accordance with the approved plans and specifications
and in compliance with RA 9514 and its IRR.
A document issued by the BFP if the applicant fails to
comply with the required documents or fire safety
requirements of the RA 9514 and its IRR.
The Office authorized to enforce the provisions of the
NBCP and its IRR in the field as well as the enforcement
of orders and decisions made pursuant thereto.
A mechanism of coordination among the OBO, Zoning
Office, Assessor's Office, Treasurer’s Office, other
concerned departments or offices at the local
government, and the Office of the City/Municipal Fire
Marshall through co-location of related functions and
through a practical system of linkages.5.14 Simple
Refers to applications for any of the following structures,
Application for whose floor area shall not exceed 1,500 square meters:
Building Permits (1) single dwelling residential building of not more than
and Certificates three (3) floors/storeys; (2) commercial buildings of not
of Occupancy _ more than two (2) floors/storeys; (3) renoval
5.15 Step
n within a
mall with issued building permit; and (4) warehouse
storing non-hazardous substance.
Any procedure taken by an applicant as part of the
process of applying for and/or processing permits and
licenses that triggers an interface, whether physical or
online/virtual, with an action on the part of the
office/unit to which the applicant has presented or
communicated with himself/herself leading to a result (a
document, certification, or decision) that is necessary to
secure a permit.
6. Standards for Processing Construction-related Permits
6.1 Standards in Processing Building Permit Applications
611
6.12
6.1.3
Application Form. A preformatted form for building permit
applications shall be prescribed in all cities and municipalities in the
Philippines (refer to Annex 1). Four (4) copies of the application form
for building permit, duly notarized, shall be submitted with the
required documents as described in Section 6.1.3, together with the
four (4) sets of the duly accomplished ancillary permit forms.
‘A modified format of the application form for building permits can be
adopted by cities/municipalities provided that the fields in the
prescribed uniform form in Annex 1 are maintained.
Documentary Requirements. Consistent Section 302 of the
NBCP and its IRR, the applicant, in applying for a building permit,
shall be required to submit the following documents together with
the application form:
a. Certified true copy of Original Certificate of Title (OCT)/Transfer
Certificate of Title (TCT) covering the subject lot and, in cases
where the applicant is not the registered owner of the said lot, a
duly notarized copy of the Contract of Lease, or Deed of Absolute
Sale; or, in lieu of the certified true copy of the OCT/TCT, a Lot
Location Plan generated thru the Parcel Verification Service of the
Land Registration Authority (LRA);
b. Four (4) sets of survey plans, design plans and other documents
prepared, signed and sealed over the printed names of duly
licensed and registered professionals, as stipulated under Section
302 (3) of the IRR of the NBC!6.14
615
6.1.6
Four (4) sets of the following:
(i) Architectural Documents
(i) Civil/Structural Documents
(iii) Electrical Documents
(iv) Mechanical Documents
(v) _ Sanitary Documents
(vi) Plumbing Documents
(vil) Electronics Documents
(viii) Geodetic Documents
(ix) Fire Protection Plan (if applicable)
c. Three (3) photocopies of valid licenses of all involved
professionals (e.g. Professional Tax Receipt and the Professional
Regulation Commission identification card);
d. Estimated value of the building or structure to be erected as
declared by the owner or applicant and duly notarized.
‘The owner/applicant/design professionals are enjoined to secure
required clearances from other agencies as stipulated under Section
302 (12) b of the IRR of the NBCP, and other documents or clearances
from local authorities as maybe provided by local ordinances. These
clearances shall no longer be submitted upfront to the OBO as part of
the requirements for the issuance of a building permit but shall
instead be submitted to the OBO thirty (30) calendar days after the
issuance of the building permit. Failure to submit these clearances
may delay the approval of the Certificate of Occupancy. Furthermore,
future complaints from agencies identified under Section 302 (12) b
of the IRR of the NBCP or inconsistencies from legal provisions on
any of the activities covered by the building permit shall be subject to
Section 207 (5) of the NBCP. On their part, the concerned national
government agencies shall endeavor to process such clearances
within the time frame specified in their Citizen's Charter as required
in the Anti-Red Tape Act (ARTA) and its IRR.
The Local Chief Executive (LCE) shall designate a representative from
the Assessor's Office who shall be detailed at the One-stop Shop for
Construction Permits (OSCP) provided for in section 7.2 below. The
assigned representative shall be responsible for (1) the issuance of a
tax declaration as required in the NBCP which shall be provided to
the OBO; and (2) assessment of new improvement to the land where
the structure will be constructed.
‘The LCE shall designate a representative from the Treasurer's Office
who shall be detailed at the OSCP, who shall be responsible for the
issuance of current tax receipt of the applicant as required by the
Zoning Officer and the collection of building permit fees as part of the
backroom operation at the OSCP.6.17
6.18
619
6.1.10
6.1.11
The LCE shall designate a representative from the Zoning
Office/Planning Development Office of cities/municipalities, who
shall be detailed at the OSCP and shall be responsible for the
verification/issuance of locational clearance as part of the OSCP
backroom operation. The representative shall provide a copy of the
said clearance to the OBO as a documentary requirement to the
building permit application.
‘The BFP shall detail staff, who shall be tasked to evaluate Fire Safety
Evaluation Certificates (FSEC), issue Order of Payment and receive
payments at the OSCP.
In processing the locational clearance, the LCE and the barangays
under his/her jurisdiction shall work out an arrangement whereby
the city hall officials shall be allowed to collect barangay fees related
to building permit and locational clearance applications, which shall
be remitted to the concerned barangays at an agreed timetable.
‘Steps in Securing Building Permit. The OBOs are enjoined to consider
the applicants’ perspective in designing the procedures for securing a
building permit, bearing in mind the Duterte administration's
promotion of “people-centered” governance that espouses.
simplification of government transactions. Hence, the city/municipal
governments are directed to ensure that, from the perspective of an
applicant, a maximum of four (4) steps, shall be followed in secur
a building permit:
‘Step1: Submission of Application Forms and Documentary
Requirements;
Step 2: Receipt of the Order of Payment;
Step 3: Payment of Fees and Charges; and
Step 4: Claiming of the Building Permi
Annex 2 contains the flow chart for processing building permits
including the procedures followed by the BFP in processing FSEC
applications.
As part of the backroom operations, the BO shall evaluate, with the
BFP, the plans forwarded by the receiving officer at the OSCP, who
shall provide three sets (3) of said plans and specifications to the
Local City/Municipal Fire Marshall for review of the fire safety
requirements as contained in the FCP. Once evaluated/or approved,
the BFP shall return two sets of stamped plans to the BO - one set for
the owner and another set for the OBO.6.1.12 In order to facilitate the evaluation of the building permit application,
the BOs shall follow an evaluation checklist that conforms to the
requirements of the NBCP and its IRR (Annex 3). Similarly, the BFP
evaluators shall formulate and use an evaluation checklist for
assessing the proposed building's compliance with the Fire Code
provisions. Evaluation of submissions shall be in accordance with the
appropriate prescribed checklists and plan reading procedures.
6.1.13 To minimize face-to-face interaction between an applicant and any
entity of the government, cities and municipalities are encouraged to
automate/computerize systems, processes and/or procedures
related to the steps specified in Section 6.1.10. Cities and
municipalities are enjoined to develop an automated system for the
submission and processing of building permit applications.
6.1.14 Processing Time. The different offices at the OSCP, functioning as one
unit, shall evaluate simple building permit applications, as defined in
Section 5.11, with complete documentary requirements, jin a
maximum period of five (5) working days. The BFP shall process the
Fire Safety Evaluation Clearance (FSEC) within a maximum period of
three (3) working days and shall abide by the manual of operations
that will be developed in relation to the JMC and other supplemental
manuals that shall be separately prepared by individual OSCPs. For
easy compliance by the applicant, applications with deficiencies shall
be issued a comprehensive correction sheet and/or a notice of
disapproval by the Zoning Officer, OBO and the local BFP stating all
deficiencies. For applications that satisfy the requirements of the
Zoning Ordinance, Fire Code, the National Building Code and its
referral codes, the OSCP shall release the Building Permit, together
with the locational clearance, other ancillary permits and the FSEC,
after payment of appropriate fees and charges.
6.1.15 The OBO shall provide the local BFP and the Assessor's Office a list of
issued building permits on a monthly basis (every 5 day of the
month) for their reference, in anticipation of the applicant's future
application for a Certificate of Occupancy.
6.1.16 Assessment of Fees, After the evaluation of the building permit
application, the Zoning Officer, the BFP, and the OBO shall
simultaneously prepare an Order of Payment that will be issued to
the applicant at the same time, specifying the fees that the applicant
is obligated to pay in accordance with the provisions of the Zoning
Ordinance, NBCP, FCP and the local revenue code . The Zoning Officer,
the BFP and the OBO shall put in place the necessary measures to
implement a one-time assessment of building-related fees and
charges which shall include the local fees for securing the locational
clearance, barangay clearance, filing fees as described in Section
6.1.17, among othe6.1.17 The fire code fees for the issuance of FSEC shall be based on the
estimated value of the building or structure declared by the owner or
applicant duly notarized. In the event that there is substantial
difference between the estimated value of the building or structure as
declared by the owner or applicant from the amount indicated in the
application for the building permit, the higher value will be adopted.
6.1.18 The OBO and the BFP may collect a filing fee, in addition to the NBCP
and FCP prescribed fees/charges, to cover for the cost incurred in
assessing building permit and FSEC applications. Such fee shall be set
following the guidelines for setting fees and charges issued by the
Bureau of Local Government Finance under the Department of
Finance.
6.1.19 Payment of Fees. The OBO and the local BFP shall jointly implement a
‘one-time payment of fees and charges related to building permit
applications. All related fees shall be paid by the applicant in a
designated cashiering area, in the OSCP, where the city/municipal
governments and the BFP shall assign a cashier to receive payments
from applications for building permit and FSEC, respectively.
6.1.20 The OBO is enjoined to issue the building permit and other ancillary
permits, the Barangay Clearance, the Locational Clearance and FSEC
upon payment of the required fees by the applicant.
6.1.21 The BFP and concerned LGUs are enjoined to establish a system of
online payment of fees and related charges and other electronic
payment scheme to facilitate the one-time assessment and payment
of building permit-related fees and charges.
6.1.22 Signatories. The Building Official shall sign and issue the building
permit. Technical staff members are, however, enjoined to sign the
review or evaluation sheets of the technical documents they were
assigned to evaluate for reference of the Building Official.
6.1.23 Coordination within Local Government Departments and Barangays.
All cities and municipalities are encouraged to automate/computerize
their databases and ensure data and information sharing among
concerned departments and offices at the local government,
especially the Office of the Building Official, the City/Municipality
Planning and Development Office, the Assessor's Office, the Business
Permit and Licensing Office (BPLO) and the Treasurer's Office. All
0B0s are enjoined to provide all information on an issued building
permit to concerned departments or offices of the local government,
such as the BPLO, the local Assessor’s Office and the Treasurer's
Office, as maybe deemed necessary and appropriate, and to
concerned barangay, as soon as the building permit is released to the
applicant. All cities and municipalities are thus encouraged to
automate/computerize their databases and ensure capacities for dataand information sharing among concerned departments and offices at
the local government.
6.2 Standards in Securing Certificate of Occupancy
62.1
6.2.2
6.2.4
Application Form. A preformatted application form for certificates of
occupancy shall be prescribed in all cities and municipalities (refer to
Annex 4), Three (3) copies of the application form, duly notarized,
shall be submitted with the required documents as described in
Section 6.2.3 below.
A modified format of the application form for certificates of
occupancy can be adopted by cities /municipalities provided the same
fields found in the prescribed uniform form in Annex 4 shall be
maintained.
Documentary Requirements. In applying for a certificate of
occupancy, the applicant shall be required to submit the following
documents:
a. Three (3) copies of duly notarized Certificate of Completion
using the form in Annex 5, signed by the owner/applicant and
signed and sealed by the duly licensed Architect or Civil
Engineer in-charge of construction, together with approved
plan and specifications and one copy of the construction
logbook. If the construction was undertaken through a
contract, the Certificate of Completion shall be signed by the
contractor/Authorized Managing Officer;
b. One (1) copy of the
ancillary permits;
ued Building Permit and the issued
¢. One (1) copy of the issued locational clearance;
d. Owner's copy of Fire Safety Correction Sheet and its
corresponding FSEC;
e. Three (3) photocopies of the valid licenses of all involved
professionals (eg. Professional Tax Receipt and the
Professional Regulation Commission identification card); and
£ Photograph of the completed structure showing front, sides,
and rear areas.
In cases when there are changes in the approved building plans, three
(3) sets of As-Built Plan are required to be submitted to the OBO,
reflecting all the changes/modifications/alterations/amendments
made as an additional document.
10625
6.2.6
6.2.7
6.28
6.2.9
The applicant, if required, shall secure clearances or certificates from
utility companies, independently and after the issuance of the
Certificate of Occupancy. Such clearances therefore shall not be
considered requirements for the issuance of said certificate,
Steps in Securing a Certificate of Occupancy. The OBOs are enjoined
to consider the applicants’ perspective in designing the procedures
for securing certificates of occupancy, The following shall be
considered as the maximum steps in securing certificate of occupancy
by an applicant:
a, Step 1: Submission of the Application Forms and Documentary
Requirements as provided in Section 6.2.3;
b. Step 2: Receipt of the Order of Payment;
¢. Step 3: Payment of Fees and Charges; and
d. Step 4: Claiming of the Certificate of Occupancy.
Annex 6 contains the flow chart for processing the certificate of
occupancy including the process of the BFP in evaluating the FSIC for
occupancy permits.
As part of the backroom operations, the BO shall evaluate with the
BFP the documents forwarded by the receiving officer at the OSCP,
who shall provide three sets to the Local City/Municipal Fire Marshall
for the review of the fire safety requirements as required for the
issuance of the Fire Safety Inspection Certificate (FSIC). In addition,
the OBO, the local BFP and the Assessor's Office are required to form
a joint inspection team for the conduct of required inspection of the
structure. The city/municipal OBO shall take charge of organizing the
inspection team, preparing and synchronizing the schedules of the
spection team members and providing the logistics for the
inspection team. The BFP has prescribed standard forms for an
Inspection Order (Annex 7), After Inspection Report (Annex 8), of
Disapproval (Annex 9), and Notice to Comply (Annex 10).
The evaluation guidelines that BOs may use in the review and
processing of Certificate of Occupancy applications are attached in
Annex 11.
Pursuant to Section 309 (4)(a) of the IRR of the NBCP, a partial
Certificate of Occupancy may be issued for the use or occupancy of a
portion or portions of a building or structure prior to the completion
of the entire building or structure, through the proper phasing of its
major independent portions without posing hazards to its occupants,
the adjacent building residents and general public. Consistent with
16.2.10
6.2.11
6.2.12
6.2.13
6.2.14
this, the BFP may issue the appropriate FSIC consistent with the
portion or portions of a building or structure which is being applied
for the certificate of occupancy, provided that all the fire safety
requirements the IRR of RA 9514 and Fire Safety Checklist are
already installed and operational on the subject application for the
Partial Certificate of Occupancy.
To minimize face-to-face interaction between an applicant and any
entity of the government, cities and municipalities are encouraged to
develop an automated /computerized application system that allow
online application for certificate of occupancy, further streamlining
the steps in Section 6.2.6.
Signatories. The Building Official shall be the signatory to the
Certificate of Occupancy. Technical staff members are, however,
enjoined to sign the review or evaluation sheets of the technical
documents they were assigned to evaluate for reference of the
Building Official.
Processing Time. The different offices at the OSCP, functioning as one
unit, shall evaluate all simple applications for Certificate of
Occupancy, which includes applications for Certificate of Final
Electrical Inspection (CFEI) and other related certificates, within a
maximum period of five (5) working days from receipt of an
application form with complete documentary requirements. The BFP
shall process the Fire Safety Inspection Certificate (FSIC) within a
maximum period of three (3) working days and shall abide by the
manual of operations that will be developed in relation to the JMC
and other supplemental manuals that shall be separately prepared by
individual OSCPs. Applications with deficiencies shall be issued a
comprehensive correction sheet and/or notice of disapproval stating
all deficiencies.
Assessment of Fees. After final inspection by the OBO and receipt of
the BFP status report, the OBO and the local BFP shall simultaneously
prepare an Order of Payment for applications that pass their
‘fying the fees that the applicant is obligated to
pay in accordance with the provisions of the NBCP and the FCP. The
two orders of payment shall be issued to the applicant at the same
time. For this purpose, the local BFP shall assign a staff who shall be
co-located with the city/municipal assessor within the OBO or
designated OSCP.
‘The OBO and the BFP may collect a filing fee, in addition to the NBCP
and FCP prescribed fees/charges, to cover for the cost incurred in
evaluating applications for certificates of occupancy and FSIC, the
setting of which shall follow the guidelines for setting fees and
charges issued by the BLGF.
126.2.15 Payment of Fees. The OBO and the local BFP shall jointly implement
a one-time payment of fees and charges related to applications for
certificates of occupancy. All related fees shall be paid by the
applicant in a designated cashiering area, ideally near or within the
OBO or in the OSCP. As provided under Section 6.1.20 above, all
and municipalities and the BFP are also encouraged to establish a
system of online payment of fees and related charges and other
electronic payment schemes.
6.2.16 The OBO shall issue the certificate of occupancy together with the
CFEI, the FSIC and other related certificates/clearances upon
payment of the required fees by the applicant.
6.2.17 Information Sharing. All OBOs are enjoined to provide all
information on approved certificates of occupancy to concerned
departments or offices of the local government, such as the BPLO and
the local Assessor's Office, as maybe deemed necessary and
appropriate, and to the BFP, on a monthly basis as discussed in
Section 6.1.14. All cities and municipalities are thus encouraged to
automate/computerize their databases and ensure capacities for data
and information sharing among concerned departments and offices
at the local government and concerned national government
agencies.
7. Complementary Reforms
7.1. Complete Checklists of Procedures and Requirements. All cities and
municipalities shall make available in conspicuous places in the Municipal or
City Hall a complete checklist of procedures and requirements in securing
bui
ing permits and certificates of occupancy and process flow chart for
processing construction-related processes consistent with this JMC.
Cities/municipalities shall ensure that said checklists may also be
downloaded from their websites.
7.2.One-Stop Shop for Construction-Related Applications. All cities and
municipalities are encouraged to set up a One-stop Shop for Construction
Permits (OSCP), preferably at the OBO that will provide frontline services to
applicants related to building permits and certificates of occupancy
application. Specifically, the OSCP shall have the following functions:
a
Receive applications and documents for building permits and
certificates of occupancy, either through on-line or physical
submission;
Coordinate and facilitate the conduct of technical reviews by the
concerned departments of cities/municipalities (e.g. Zoning Office,
Barangay Official) and the local BFP;
13c. Facilitate the retrieval of documentary requirements for building
permit and certificate of occupancy that will be part of the OSCP
backroom operation, such as the tax declaration, current receipt of
real property tax payments in coordination with concerned
city/municipal departments;
d. Implement a one-time assessment of fees and charges related to
applications for building permits and certificates of occupancy in
coordination with the BFP, the Zoning Officer, the Assessor's Office,
the Treasurer's Office and the OBO;
e, Coordinate the conduct of joint inspections by the OBO, the Assessor's
Office and the BFP;
Receive payment of all related fees and charges, either through on-line
or physical payment, in coordination with the BFP and the OBO; and
g. Release building permit or certificate of occupancy, either through on-
line or physical release.
7.3 The physical layout of the OSCP is envisioned to allow a four-step process
for both applications for building permit and certificates of occupancy. It
shall include a backroom operation with space provided for co-locating
agencies like the local BFP and departments/offices of the city/municipality
concerned with evaluation of construction-related permits. A proposed lay-
out of the OSS is attached as Annex 11. The Local Chief Executives of cities
and municipalities are expected to provide the necessary budgetary and
logistical support for the setting up and operations of the OSCP.
7.4 Integration of LRA processes in the One-Stop Shop for Construction Permits.
Cities/municipalities are encouraged to explore with Land Registration
Authority (LRA) the option of setting up LRA extension offices in the OSCP
that will generate OCT/TCT as part of their backroom operation as a service
to the public.
7.5 Automation/Computerization_of Processes. For efficient and effective
implementation of this JMC, all concerned entities of the government - both
national and local - are enjoined to automate/computerize related
processes in the issuance of building permits and certificates of occupancy
which may include, among others, the following:
a. Filing of application;
b. Storage and retrieval of application forms and documents;
Payment of fees and charges; and
4, Issuance of permits and certificates;
14e. Database sharing among the OBO and other involved entities of the
local government, i.e,, Local Planning and Development Office (LPDO),
Zoning Office (ZO), Local Treasurer's Office (LTO), Local Assessor's
Office (LAO), Business Permit and Licensing Office (BPLO), and with
the BFP.
7.6 Cities and municipalities, especially the highly urbanized cities, are enjoined
to develop a web-based Building Permit Application System that would
allow online application and processing of building permits and certificates
of occupancy. The online application shall be reviewed and approved by the
DICT and then be integrated in the National government Portal. The LGUs
may also avail of the Government Web Hosting Services from DICT.
7.7 Continuing Professional E for Design P Ent BO
and Practitioners). The BOs are encouraged to utilize part of the 15% of the
OBO fund, as mandated in the DPWH-DILG Joint Memorandum Circular No.
001 dated July 4, 2013, in their attendance to trainings/capacity building
programs related to the standards set in this JMC.
8. Implementation of the Standards
8.1. All cities and municipalities are enjoined to implement the standards for the
issuance of building permit and certificate of occupancy, as presented in
Sections 6.1 and 6.2, respectively. They are encouraged to set up procedures
that will further improve these service standards in partnership with national
government agencies.
8.2. An Oversight Committee on Construction Permit Reforms shall be created with
the Secretaries of the DPWH as Chair and the Secretary of the DILG as Vice-
Chair. The committee shall have as members the heads of the following entities:
(1) DICT; (2) the BFP; (3) the National Competitiveness Council under the
Department of Trade and Industry; (4) Organization of Building Officials; (5)
private sector representatives. This committee shall have the following
functions: (1) oversee the implementation of the standards at the local
government level; (2) approve the manual or guidebook for the implementation
of the JMC as well as the training program designs to be conducted; (3) promote
and coordinate the development of a web-based building permit application
system; (4) monitor the implementation of the JMC and implement sanctions to
non-compliant local government units; and (5) undertake other measures
necessary to enforce the standards set in the JMC.
8.3. A manual or guidebook for the implementation of reforms shall be prepared to
complement this Joint Memorandum Circular.
8.4. The DPWH in coordination with the DILG shall conduct a series of training
programs for OBO and other concerned departments and offices of local
governments as well as the BFP on the implementation of this Joint
Memorandum Circular which may cover, among others, the following modules:
15,a, Standards for the Issuance of Building Permit and Certificate of Occupancy;
and
b. Preparation of Change Management Plan and Action Plan for each local
government, OBO and local BFP office.
9. Roles and Responsibilities of Oversight Agencies
91
92
Department of Public Works and Highways
a. Chair the Oversight Committee on Construction Permit Reforms and provide
secretariat support;
b. Issue, as maybe deemed necessary, supplementary circulars or department
orders enjoining LGU Building Officials to implement the standards set forth
in this Joint Memorandum Circular, in coordination with the Local Chief
Executives of cities and municipalities;
¢. In collaboration with DILG-BLGD and BFP prepare a manual of operations
for OBOs for the implementation of the JMC;
4. Provide capacity development to concerned local government units and
OBOs, in collaboration with DILG, to ensure the effective and efficient
implementation of this circular;
e. Oversee, in close collaboration with DILG and BEP, the implementation of
the JM
f. Provide guidelines to OBO personnel specifically on evaluating of plans and
other building requirements; and
g Monitor compliance in the implementation of the JMC through the National
Building Code Development Office in coordination with DILG-BLGD and BFP.
Department of the Interior and Local Government
a. Actas Vice Chair of the Oversight Committee on Construction Permit
Reforms;
b. Issue, as maybe deemed necessary, supplementary circulars to LGUs in the
implementation of the JMC;
¢. Determine mechanisms and/or strategies to encourage local government
units, OBO and BFP to effect the implementation of the standards set forth in
this Joint Memorandum Circular;
16d. In collaboration with DPWH and BFP:
1 Develop manual of operations for LGUs/OBO in the operationalization
of this JMC or in streamlining bi 1g permit and certificate of
occupancy;
d.2 Capacitate and assist LGUs in streamlining building permit and
certificate of occupancy using the guidelines or manual of operations
developed or thru capacity building programs;
d.3 Oversee, in close collaboration with DPWH and BFP, the
implementation of the JMC;
4.4 Establish a monitoring system on the compliance of OBOs, local
governments and BFP to the standards set under this JMC;
45 Monitor ona periodic and regular basis the extent/status of
implementation of the standards set under this JMC.
e. In collaboration with DICT:
e.1 Assist in the development of an automated system for Building
Permit and Certificate of Occupancy;
€.2 Provide training programs to LGUs on planning and implementation of
an automated Building Permit system; and
.3 Capacitate LGUs/OBO in the computerization of Building Permitting
and Certificate of Occupancy.
9.3 Department of Information and Communications Technology
‘a. Develop a web-based system software for online application, submission and
processing of Building Permits available to interested LGUs that can be used
for automation of Building Permitting to capable and e-ready LGUs based on
standards set;
b, Provide training programs to LGUs on planning and implementation of an
automated Building Permit system, in partnership with DILG through the
BLGD and DPWH;
¢. Encourage the formulation of plans using the Information Systems Strategic
Plan (ISSP) process;
. Organize a pool of trainers from the partner agencies (DILG and DPWH),
academe and interested providers who will be available to provide assistance
to LGUs on the e-Building Permitting System;
7e. Capacitate LGUs/OBOs on the operation and maintenance of the e-Building
Permitting System; and
£. Monitor the functionality, implementation and operations of the e-Buil
Permitting System, in coordination with DILG-BLGD and DPWH.
9.4 Bureau of Fire Prote
a, Issue, as maybe deemed necessary, supplementary circulars or department
orders enjoining the cooperation of Fire Marshalls and BEP personnel at the
local level in the implementation of the JMC;
b. Oversee, in close collaboration with DILG and BFP, the implementation of the
JMC;
¢. Monitor on a periodic and regular basis the extent of implementation of the
standards; and
d. In coordination with DICT, automate the process of FSIC and FSEC
application.
9.5 Department of Trade and Industry (National Competitiveness Council)
a. Coordinate technical assistance for the implementation of the JMC from the
development partners as part of its Ease of Doing Business activities; and
b. Provide technical support for the implementation of the standards in Quezon
City, which is the city included in the International Finance Corporation's
Doing Business Report;
¢. Coordinate with business groups at the local and national levels to support
the new guidelines in streamlining the processes for issuance of building
permits and certificates of occupancy; and
d. Oversee, in close collaboration with DILG, DPWH, and BFP, the
implementation of the JMC.
9.6 Local Government Units
.. Provide both budgetary and logistical support for the implementation of the
standards set in the JMC, including the setting up of a one-stop shop for
construction-related permits and clearances which includes the local BFP
staff;
b. Organize and lead the Joint Inspection Team and provide logistic support (e.g.
transportation and other incidental expenses);
18c. Allow the OBO and staff of cities and municipalities to undergo capacity
building in relation to the implementation of the service standards in
processing Building Permits and Certificates of Occupancy under the JMC;
d, Forge partnership with DILG and DICT for automating the processing of
Building Permits and Certificates of Occupancy, which may include provision
of logistics for training in the operationalization of the system;
e. Take responsibility for the operations and maintenance of the e-Building
Permitting System software that may be set-up in connection with this JMC;
and
£. Submit periodic status report on the city/municipality’s compliance to this
JMC.
10. REFERENCES
10.1 Presidential Decree 1096, s. 1977 or the National Building Code of the
Philippines (NBCP)
10.2 Republic Act 9514 or the Fire Code of the Philippines of 2008 (FCP)
10.3 Republic Act 9485or the Anti-Red Tape Act of 2007 (ARTA)
10.4 Republic Act 7160 or the Local Government Code of 1991 (LGC)
10.5 Inaugural Speech of President Rodrigo Roa Duterte dated June 30, 2016
10.6 First State of the Nation Address (SONA) of President Rodrigo Roa Duterte
dated July 25, 2016.
11. ANNEXES
Hereto attached are the following:
Annex 1: Unified Building Permit Application Form
Annex 2: Flow Chart for Processing Building Permits
Annex 3a: Standard Checklist for Evaluation of Building Permits
Annex 3b: Compliance Evaluation Sheet (both for Building and Occupancy)
Annex 4: Unified Application Form for Certificates of Occupancy
Annex 5: Certificate of Completion Form
Annex 6: Flow Chart for Processing Certificates of Occupancy
Annex 7: Inspection Order (BFP)
Annex 8: After Inspection Report (BFP)
Annex 9: Notice of Disapproval (BFP)
Annex 10: Notice to Comply (BFP)
Annex 11: Compliance Evaluation Sheet (both for Building and Occupancy)
Annex 12: Proposed Lay-out of the One-stop Shop for Construction Permits
1912, MONITORING AND REPORTING
DILG Regional Office shall submit progress and period report in the implementation
and compliant of cities and municipalities on this JMC to Secretary of the Interior
and Local Government thru the Undersecretary for Local Government.
13, SEPARABILITY CLAUSE
If any clause, sentence or provision of this Joint Memorandum Circular shall be
valid or unconstitutional by a competent court, its remaining parts shall
declares
not be affected thereby.
14, REPEALING CLAUSE
All other orders, rules and regulations inconsistent or contrary to the provisions of
this Joint Memorandum Circular are hereby repealed or modified accordingly.
15. EFFECTIVITY
‘This Joint Memorandum Circular shall take effect immediately.
G7 tz
MARK A. VILLAR’
Secretary
Department of Public Works and ac
Department of the Interior and Local
LAE,
ELISEO M. RIO, J
O1C-Secretay er
Department of Inforination and Department of Trad
Communications Technplogy
16. APPROVING AUTHORITY
Goatsey
M. LUZ
Private Sector Co-Chairman
National Competitiveness Council
2017. FEEDBACK
For related queries, kindly contact the Bureau of Local Government Development ~
Department of the Interior and Local Government at telephone number (02) 925-
0356 or at Telefax number (02) 927-7852 and/or email at [email protected],
2