TRAINING ACTIVITY MATRIX
Qualification: Plumbing NCII
Training Duration: 202 Hours (26 Days) – (8 Hours/Day)
FACILITIES / TOOLS VENUE [WORKSTATION DATE AND
TRAINING ACTIVITY TRAINEE REMARKS
AND EQUIPMENT / AREA] TIME
LO1. Study approved
Modules
plumbing plan
Plumbing Plans PREPARE ESTIMATION
OF MATERIALS FOR
LO2. Estimate and Plumbing Materials
MULTIPLE PLUMBING
finalize materials take- Plumbing Tools UNITS.
off Plumbing Equipment
PPE
LO1. Prepare materials
for drainage,sanitary,
Modules
vent and waterline
layout work.
LO2. Install pipes and
fittings for drainage,
Plumbing Plans
sanitary, vent and
waterline layout
PERFORM MULTIPLE
LO3. Install cold water
PLUMBING UNITS
system and multi-point
Plumbing Materials INSTALLATION AND
water heater for hot-
ASSEMBLIES
water supply lines
LO4. Install building
drains, sewer and Plumbing Tools
ventilation
LO5. Mount and layout
Plumbing Equipment
plumbing fixtures and
accessories
PPE
LO1. Prepare
conducting pipe leak Modules
testing
Plumbing Plans CONDUCT PIPE LEAK
TESTING
LO2. Perform pipe leak Plumbing Materials
testing Plumbing Tools
Plumbing Equipment
PPE
LO1. Repair defective
pipes, fittings and Modules
plumbing fixtures
PERFORM PLUMBING
Plumbing Plans
REPAIR AND
LO2. Clear clogged pipes Plumbing Materials MAINTENANCE
and drains Plumbing Tools
Plumbing Equipment
PPE
Date Started: JJANUARY 2, 2017
Date Ended: FFEBRUARY 6, 2017
Alimudin D. Kasan
Trainer