AHU No : 13
Date:- 10/6/2019
1 Guest 01 Grill 01 600 X 200 20 1.29 250 470 430 575 635.071 254.028
2 Grill 02 600 X 200 20.5 1.29 250 400 300 390 469.306 187.723
3 Guest 02 Grill 01 600 X 200 18.5 1.29 250 360 320 210 383.195 153.278
4 Grill 02 600 X 200 18.5 1.29 250 360 344 205 391.376 156.55
REMARKS :
REMARKS :
1 2 3 4 5 6 7 8
A 46 43 37 39 34 35 32
B 55 50 47 42 39 39 38
C 42 37 38 35 35 39 40
D 54 52 53 50 47 42 40
E 52 54 53 50 49 43 38
F
G
H
I
J
TOTAL 249 236 228 216 204 198 188
Total Average = 43.4
Velocity Pressure in WG. 0.1736
FPM as per as Air Velocity Calculator = 1700
Total CFM = FPM x Area Factor
= 1650 x 4.5
Total CFM
= 7425
DUCT SIZE( Inch X inch) 40 x 18 DUCT SIZE( Inch X inch) 40 x 18
TEST DATA
DESIGN
REMARKS :
rea Factor
4.5
18
0.004
7425 1.257622
DUCT TRAVERSE READINGS
PROJECT : 110/13.8 KEC2
FACILITY : PACU 3B
LEVEL : First Floor
Room : Control Room, Store, Toilet, Battery Room & WC.
Date:- : 10/12/2014
1 2 3 4 5 6 7 8
A 120 45 80 80 25 0 0
B 122 120 94 55 12 0 0
C 90 85 70 40 8 0 0
D 120 120 100 75 32 2 0
E 122 120 100 97 50 8 0
F
G
H
I
J
TOTAL 574 490 444 347 127 10 0
Total Average = 56.9142857143
Velocity Pressure in WG. 0.2276571429
FPM as per as Air Velocity Calculator = 1820
Total CFM = FPM x Area Factor
= 1650 x 4.5
Total CFM
= 7425
DUCT SIZE( Inch X inch) 40 x 18 DUCT SIZE( Inch X inch) 40 x 18
TEST DATA
DESIGN
REMARKS :
3
9
rea Factor
4.5
18
0.004
7425 1.257622
Air Distribution and Air Balancing Test Report
PROJECT : BANAS DAIRY
AHU No : 13
Date:- 10/6/2019
Total 750
rt
FPM03 CFM %
0 0
0 0
0 0
0 0