0% found this document useful (0 votes)
87 views11 pages

Air Testing Formats (Banas Dairy)

The documents provide air distribution test reports for various projects. They include test data for air grill factors, room temperatures, air velocities and flow rates at different terminals. The final test results are compared to the design data and percentages are calculated. Duct traverses are also reported, listing velocity readings at different points and calculating total air flow. The documents confirm air distribution systems were tested and balanced to meet design specifications.

Uploaded by

ghazi4u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views11 pages

Air Testing Formats (Banas Dairy)

The documents provide air distribution test reports for various projects. They include test data for air grill factors, room temperatures, air velocities and flow rates at different terminals. The final test results are compared to the design data and percentages are calculated. Duct traverses are also reported, listing velocity readings at different points and calculating total air flow. The documents confirm air distribution systems were tested and balanced to meet design specifications.

Uploaded by

ghazi4u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

Air Distribution and Air Balancing Test Report

PROJECT : BANAS DAIRY

AHU No : 13

Facility Areas : Guest 01 and Guest 02

Room : Guest 01 and Guest 02

Date:- 10/6/2019

Terminal Design Data Test Data Final


Chilled
Termi
Room Water/Air Grill Factor
nal No Temperatur (Ak)
Type Size (mm x mm) e (°C) CFM FPM01 FPM02 FPM03 CFM %

1 Guest 01 Grill 01 600 X 200 20 1.29 250 470 430 575 635.071 254.028

2 Grill 02 600 X 200 20.5 1.29 250 400 300 390 469.306 187.723

3 Guest 02 Grill 01 600 X 200 18.5 1.29 250 360 320 210 383.195 153.278

4 Grill 02 600 X 200 18.5 1.29 250 360 344 205 391.376 156.55

Total 1000 1878.95 187.895


Air Distribution and Air Outlet Test Report
PROJECT : 110/13.8 KEC2
FACILITY : PACU 1B
LEVEL : Basement Floor
Room : GIS Room Basement
Date:- 10/12/2014

Terminal Design Data Test Data Final


Termi Ak
Room
nal No Factor
Size
Type CFM FPM FPM CMH CFM %
(in x in)
1 GIS Room Basement Grill 16 X 8 0.8 181 226.25 250 200 110.5
2 GIS Room Basement Grill 16 X 8 0.8 181 226.25 224 179.2 99.006
3 GIS Room Basement Grill 16 X 8 0.8 181 226.25 240 192 106.08
4 GIS Room Basement Grill 16 X 8 0.8 181 226.25 233 186.4 102.98
5 GIS Room Basement Grill 16 X 8 0.8 181 226.25 233 186.4 102.98
6 GIS Room Basement Grill 16 X 8 0.8 181 226.25 260 208 114.92
7 GIS Room Basement Grill 16 X 8 0.8 181 226.25 250 200 110.5
8 GIS Room Basement Grill 16 X 8 0.8 181 226.25 243 194.4 107.4
9 GIS Room Basement Grill 16 X 8 0.8 181 226.25 250 200 110.5
10 GIS Room Basement Grill 16 X 8 0.8 181 226.25 230 184 101.66
11 GIS Room Basement Grill 16 X 8 0.8 181 226.25 250 200 110.5
12 GIS Room Basement Grill 16 X 8 0.8 181 226.25 224 179.2 99.006

Total 2172 2715 2887 2309.6 106.34

REMARKS :

PERFORMED BY : SIGNATURE : DATE :

WITNESSED BY : SIGNATURE : DATE :


Air Distribution and Air Outlet Test Report
PROJECT : 110/13.8 KEC2
FACILITY : PACU 1B
LEVEL : Ground Floor
Room : GIS Room/Hall GF
Date:- 10/12/2014

Terminal Design Data Test Data Final


Termi Ak
Room
nal No Factor
Size
Type CFM FPM FPM CMH CFM %
(in x in)
1 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 390 877.5 99.829
2 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 396 891 101.37
3 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 370 832.5 94.71
4 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 415 933.75 106.23
5 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 423 951.75 108.28
6 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 380 855 97.27
7 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 427 960.75 109.3
8 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 370 832.5 94.71
9 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 366 823.5 93.686
10 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 370 832.5 94.71
11 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 456 1026 116.72
12 GIS Room/Hall GF Grill 30 X 12 2.25 879 390.67 441 992.25 112.88

Total 10548 4688 4804 10809 102.47

REMARKS :

PERFORMED BY : SIGNATURE : DATE :

WITNESSED BY : SIGNATURE : DATE :


DUCT TRAVERSE READINGS
PROJECT : 110/13.8 KEC2
FACILITY : PACU 3A
LEVEL : First Floor
Room : Control Room, Store, Toilet, Battery Room & WC.
Date:- : 10/12/2014

1 2 3 4 5 6 7 8
A 46 43 37 39 34 35 32
B 55 50 47 42 39 39 38
C 42 37 38 35 35 39 40
D 54 52 53 50 47 42 40
E 52 54 53 50 49 43 38
F
G
H
I
J
TOTAL 249 236 228 216 204 198 188
Total Average = 43.4
Velocity Pressure in WG. 0.1736
FPM as per as Air Velocity Calculator = 1700
Total CFM = FPM x Area Factor
= 1650 x 4.5
Total CFM
= 7425
DUCT SIZE( Inch X inch) 40 x 18 DUCT SIZE( Inch X inch) 40 x 18
TEST DATA
DESIGN

AREA FT2 AREA FT2


AIRFLOW CFM 5904 CENTRE S.P. Inch 0.004
VELOCITY FPM 1400 to 1800 AIR FLOW CFM 7425

REMARKS :

PERFORMED BY : SIGNATURE : DATE :

WITNESSED BY : SIGNATURE : DATE :


8

rea Factor
4.5

18

0.004
7425 1.257622
DUCT TRAVERSE READINGS
PROJECT : 110/13.8 KEC2
FACILITY : PACU 3B
LEVEL : First Floor
Room : Control Room, Store, Toilet, Battery Room & WC.
Date:- : 10/12/2014

1 2 3 4 5 6 7 8
A 120 45 80 80 25 0 0
B 122 120 94 55 12 0 0
C 90 85 70 40 8 0 0
D 120 120 100 75 32 2 0
E 122 120 100 97 50 8 0
F
G
H
I
J
TOTAL 574 490 444 347 127 10 0
Total Average = 56.9142857143
Velocity Pressure in WG. 0.2276571429
FPM as per as Air Velocity Calculator = 1820
Total CFM = FPM x Area Factor
= 1650 x 4.5
Total CFM
= 7425
DUCT SIZE( Inch X inch) 40 x 18 DUCT SIZE( Inch X inch) 40 x 18
TEST DATA
DESIGN

AREA FT2 AREA FT2


AIRFLOW CFM 5904 CENTRE S.P. Inch 0.004
VELOCITY FPM 1400 to 1800 AIR FLOW CFM 7425

REMARKS :

PERFORMED BY : SIGNATURE : DATE :

WITNESSED BY : SIGNATURE : DATE :


8

3
9

rea Factor
4.5

18

0.004
7425 1.257622
Air Distribution and Air Balancing Test Report
PROJECT : BANAS DAIRY

AHU No : 13

Facility Areas : Guest 01 and Guest 02

Room : Guest 01 and Guest 02

Date:- 10/6/2019

Terminal Design Data Test Data


Chilled
Termi Water/Air Grill Factor
Room
nal No Temperatur (Ak)
Type Size (mm x mm) e (°C) CFM FPM01 FPM02 FPM03

1 Guest 01 Grill 01 600 X 200 20 1.29 250

2 Grill 02 600 X 200 20.5 1.29 250

3 Guest 02 Grill 01 600 X 200 18.5 1.29 250

Total 750
rt

Test Data Final

FPM03 CFM %

0 0

0 0

0 0

0 0

You might also like