Perhitungan Balok Melintang

The document provides calculations for the longitudinal reinforcement of a simply supported beam. It includes: 1. Dimensions and loads acting on the beam are calculated. 2. Moments due to self-weight, dead, and live loads are determined. 3. Distribution factors for the internal moments are calculated. 4. Forces in the longitudinal bars are then determined. In less than 3 sentences, this summary outlines that the document performs calculations for longitudinal reinforcement of a beam by first determining loads and moments, then calculating distribution factors to find internal forces which size the reinforcement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views43 pages

Perhitungan Balok Melintang

The document provides calculations for the longitudinal reinforcement of a simply supported beam. It includes: 1. Dimensions and loads acting on the beam are calculated. 2. Moments due to self-weight, dead, and live loads are determined. 3. Distribution factors for the internal moments are calculated. 4. Forces in the longitudinal bars are then determined. In less than 3 sentences, this summary outlines that the document performs calculations for longitudinal reinforcement of a beam by first determining loads and moments, then calculating distribution factors to find internal forces which size the reinforcement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 43

BAB IV

PERHITUNGAN BALOK MELINTANG

47
IV. 1.BalokInduk 1-1
Balok Induk 1-1 = Balok Induk 7-7
A. Perhitungan Tulangan Longitudinal
1. Dimensi Pada Balok Melintang
Direncanakan :
Berat volume beton bertulang = 2400 kg/m3 = 24 kN/m3
fc’ = 25 Mpa
fy = 400 Mpa
selimut beton (s) = 40 mm
tulangan sengkang Ø 8 mm.

Dimensi pada balok memanjang


- b balok = 200 mm = 0,20 m
- h balok = 400 mm = 0,40 m
Beban mati (DL) = 2,35 kN/m2
Beban hidup (LL) = 2 kN/m2

2. Menghitung Beban-Beban yang Bekerja Pada Titik


qbalok = 2,88 kN
qplat DL = 7,06 kN
qplat LL = 6,00 Kn
PA = qbalok+ qplat DL+qplat LL
= 2,88 + 7,06 + 6
= 15,94 kN
PB = qbalok+ 2 (qplat DL+qplat LL)
= 2,88 + 2 (7,06+6)
= 29,0064 Kn
PC = qbalok+ qplat DL+qplat LL
= 2,88 + 7,06 + 6
= 15,94 kN

48
3. Menghitung Beban-Beban yang BekerjaPadaBalok

 Digunakan berat sendiri Balok


q1 = ybeton × b balok × h balok
= 24 × 0,2 × 0,4 = 1,92kN/m
 Momen Primer
1 1
MP q1  . q1. x 2  . (1,92). (3) 2  1,44 kN.m
12 12
 MenghitungKekakuan
1
I =12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab=Kbc =𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = = = 0,01 EI
ℎ×100 4×100

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = 0,013 𝐸𝐼+0,010 EI+0,013 EI = 0,3

49
Tabel III.7 DistribusiMomen

Tabel Distribusi Momen


Joint D A B C F

Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5

FEM 0 0 1.440 - -1.44 0 1.440 - -1.440 0 0

Balance 0 -0.720 -0.720 - 0 0 0 - 0.720 0.720 0

Co -0.360 0 0 - -0.360 0 0.36 - 0 0 0.4

Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 0 0 - 0 0 0
- 0
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0

Total -0.36 -0.72 0.72 1.62 -1.80 0 1.80 1.62 -0.72 0.72 0.36

50
51
M AB  2,52
H DA    0,63kN ()
H 4
H EB 0
M CF 2,52
H FC    0,63kN()
H 4
4. Menghitung Beban-Beban yang Bekerja Pada Plat

 Digunakan berat sendiri Plat


q2 = WDL × 2 = 2,35 × 2 = 4,71 kN/m
 Momen Primer
5q 2 5.4,71 2.
MP q2  . x 2.  . 3  2,21 kN.m
96 96
 MenghitungKekakuan
1
I = 12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab=Kc =𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = = = 0,01 EI
ℎ×100 4×100

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = = 0,3
0,013 𝐸𝐼+0,010 EI+0,013 EI

52
Tabel III.8 Distribusi momen plat (DL)

Tabel Distribusi Momen


Joint D A B C F

Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5

FEM 0 0 2.207 - -2.21 0 2.207 - -2.207 0 0

Balance 0 -1.104 -1.104 - 0 0 0 - 1.104 1.104 0

Co -0.552 0 0 - -0.552 0 0.551813 - 0 0 0.6

Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 0 0 - 0 0 0
- 0
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0

Total -0.55 -1.10 1.10 1.82 -2.76 0 2.76 1.82 -1.10 1.10 0.55

53
54
M AB  3,86
H DA    0,97kN ()
H 4
H EB  0
M CF 3,86
H FC    0,97kN()
H 4

 Digunakan berat hidup Plat


q3 = WLL × 1,5 = 2 × 2 = 4,00kN/m
 Momen Primer
5q3 5.4,00 2.
MP q3  . x 2.  . 3  1,88 kN.m
96 96
 MenghitungKekakuan
1
I = 12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab=Kc =𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = = 4×100= 0,01 EI
ℎ×100

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = 0,013 𝐸𝐼+0,010 EI+0,013 EI = 0,3

55
Tabel III.9 Distribusi Momen Plat (LL)

Tabel Distribusi Momen


Joint D A B C F

Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5

FEM 0 0 1.875 - -1.88 0 1.875 - -1.875 0 0

Balance 0 -0.938 -0.938 - 0 0 0 - 0.938 0.938 0

Co -0.469 0 0 - -0.469 0 0.46875 - 0 0 0.5

Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 0 0 - 0 0 0
- 0
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0

Total -0.47 -0.94 0.94 1.55 -2.34 0 2.34 1.55 -0.94 0.94 0.47

56
57
M AB  3,28
H DA    0,82kN ()
H 4
H EB  0
M CF 3,28
H FC    0,82kN()
H 4

 Kombinasi Momen Balok


Mu1 = 1,4 x balok(DL) = 1,4 x 1,62 = 2,27 kN.m
Mu2 = 1,2 x balok(DL) + 1,6 x balok(LL)
= 1,2 x 1,62 + 1,6 x 0
= 1,94 KN.m
 Kombinasi Momen Plat
Mu1 = 1,4 x plat (DL) = 1,4 x 1,82 = 2,55 kN.m
Mu2 = 1,2 x plat (DL) + 1,6 x plat (LL)
= 1,2 x 1,82 + 1,6 x 1,55
= 4,66 KN.m

 Jumlah Kombinasi Momen Lapangan


ΣMu1 = Mu1(balok)+Mu1(plat)
= 2,27 + 1,94
= 4,82 kN.m

ΣMu2 = Mu2(balok)+Mu2(plat)
= 1,94 + 4,66
= 6,60 kN.m

58
5. Tulangan Tumpuan Balok Melintang

Data :
Momen Ultimate (Mu) = 9,22 Kn.m As = 379,94 mm2
Ø Mu = 11,53 Kn.m banyak batang = 2 batang
Ρ = 0,01 As θ 22 = 759,88mm2
Lebar (b) = 200 mm 2 As’ θ 22 = 759,88 mm2
d (efektif) = 341 mm Fy = 400 Mpa
As perlu = 682 mm2 Fs’ = 400 Mpa
θ tulangan = 22 mm a = 3,80 mm
β1 = 0,85 c = 4,47 mm
s = 40 mm θ sengkang = 8 mm
d’ = 59 mm fc’ = 25 Mpa

d(efektif) = d – s – θ sengkang – ½(θ tulangan)


= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . b .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
d’ = s + θ sengkang + ½(θ tulangan tekan)
= 40 + 8 + ½ ( 22 )
= 59 mm
As = 1/4 . π . D2
= ¼ . 3,14. 222
= 379,94 mm2
𝐴𝑠(𝑝𝑒𝑟𝑙𝑢)
n =
𝐴𝑠
682
=
379,94
= 1,27 = 2 batang
2 As θ 22 = As . n
= 379,94 . 2
= 759,88 mm2

59
2 As’ θ 22 = As . 2
= 379,94 . 2
= 759,88 mm2
(𝐴𝑠−𝐴𝑠 ′ ).𝐹𝑦 𝐴𝑠′
a = +
0,85 .𝐹𝑐 ′ .𝑏 𝑏
(759,88−759,88).400 759,88
= +
0,85 .25.200 200
= 3,80 mm
𝑎
c =
β1
3,80
=
0,85
= 4,47 mm
 Kontrol
(d(efektif)−c) x 0,003
εs = 𝑐
(341−4,47) x 0,003
= 4,47

= 0,2259 ≥ 0,002 .....OK!!

c−d′
εs' =𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑐x εs
4,47−59
= x 0,2259
341−4,47

= -0,03660< 0,002.... Tidak OK

Cc = 0,85x fc’x a x b –2 As’ θ 22


= 0,85 x 25 x 3,80 x 200 – 759,88
=0N

Cs = 2 As’ θ 22 x fs’
= 759,88 x 400
= 303952 N

60
𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑎
Mn = Cc x + Cs x defektif – d’
2
341−3,80
=0x + 303952 x 341– 59
2

= 85714464 N.mm
= 85,714 Kn.m

Kesimpulan , Mn ≥ ф Mu
85,714 Kn.m ≥ 11,53 Kn.m … OK!
Ternyata. fs = fy dan fs’ < fy
Maka diselesaikan dengan cara iterasi.
Iterasi c a fs=fy Εs εs' fs' Cc Cs Cc+Cs Ts
1 55,000 46,75 400 0,0156 -0,00113 -226,90909 182540,05 -172423,68 10116,37 303952
2 60,000 51,00 400 0,0141 0,00023 46,833333 200602,55 35587,713 236190,26 303952
3 61,905 52,62 400 0,0135 0,00063 126,95042 207485,34 96467,085 303952,42 303952

Jadi didapat : c = 61,905mm


Cs = 96467,085 N
Cc = 207485,34N
Mn = Cs (d-d’) + Cc (d - a/2)
= 96467,085 (341-59) + 207485,34 (341 – 52,62/2)
= 92497333N.mm = 92,497kN.m

Kontrol :
Mu /Ø < Mn
11,53 kN.m < 92,497 kN.m (OKE!)

61
6. Tulangan Lapangan Balok Melintang (L)

Diketahui :
hf = 100 mm
bw = 200 mm
ρ = 0,01
β1 = 0,85
b = bw + (3.hf)
= 200 + (3. 100)
=500 mm
d(efektif) = d – s – θ sengkang – ½(θ tulangan)
= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . b .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
0,85 𝐹𝑐′ 600
̅𝜌𝑏
̅̅̅ = .β1.
𝐹𝑦 600+𝐹𝑦
0,85 25 600
= .β1.
400 600+400
= 0,027
ℎ𝑓
ρf = 0,85 Fc’.(b-bw).
𝐹𝑦.𝑏𝑤.𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)
100
= 0,85.25.(800-200).
400.200.341
= 0,023
𝑏𝑤
0,75 ρb = 0,75 . .(̅𝜌𝑏
̅̅̅ + ρf)
𝑏
200
= 0,75 . .( 0,027 + 0,023)
800
= 0,02
Kesimpulan , ρ ≤ 0,75 ρb
0,01 ≤ 0,02 … OK!

62
.ρ. min = 1,4 /Fy
= 1,4 / 400
= 0,0035
Kesimpulan , ρ ≥ ρ. min
0,01 ≥ 0,0035 … OK!

𝐹𝑦
 = ρ.
𝐹𝑐′
400
= 0,01.
25
= 0,16
1,18 . ω . d(efektif)
C =
β1
1,18 . 0,16 . 341
=
0,85
= 75,74
Kesimpulan , C ≤ hf
75,74 ≤ 100 .. Balok T Palsu

Karena penampang Balok T Palsu, maka perhitungan sama dengan balok


persegi.

Data :
Momen Ultimate (Mu) = 6,60 Kn.m As = 379,94 mm2
Ø Mu = 8,26 Kn.m banyak batang = 2 batang
Ρ = 0,01 As θ 22 = 759,88mm2
Lebar (b) = 200 mm As’ θ 22 = 759,88 mm2
d (efektif) = 341 mm Fy = 400 Mpa
As perlu = 682 mm2 Fs’ = 400 Mpa
θ tulangan = 22 mm a = 3,80 mm
β1 = 0,85 c = 4,47 mm
s = 40 mm θ sengkang = 8 mm
d’ = 59 mm fc’ = 25 Mpa

d(efektif) = d – s – θ sengkang – ½(θ tulangan)


= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . b .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
d’ = s + θ sengkang + ½(θ tulangan tekan)
= 40 + 8 + ½ ( 22 )
= 59 mm
As = 1/4 . π . D2
= ¼ . 3,14. 222
= 379,94 mm2

63
𝐴𝑠(𝑝𝑒𝑟𝑙𝑢)
n =
𝐴𝑠
682
=
379,94
= 1,8= 2 batang
2 As θ 22 = As . n
= 379,94 . 2
= 759,88 mm2
2 As’ θ 22 = As . 2
= 379,94 . 2
= 759,88 mm2
(𝐴𝑠−𝐴𝑠 ′ ).𝐹𝑦 𝐴𝑠′
a = +
0,85 .𝐹𝑐 ′ .𝑏 𝑏
(759,88−759,88).400 759,88
= +
0,85 .25.200 200
= 3,80 mm
𝑎
c =
β1
3,80
=
0,85
= 4,47 mm

 Kontrol
(d(efektif)−c) x 0,003
εs =
𝑐
(341−4,47) x 0,003
= 4,47

= 0,2259 ≥ 0,002 .....OK!!

c−d′
εs' =𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑐x εs
4,47−59
=341−4,47x 0,2259

= -0,03660< 0,002.... Tidak OK


Cc = 0,85x fc’x a x b –2 As’ θ 22
= 0,85 x 25 x 3,80 x 200 – 759,88
=0N
Cs = 2 As’ θ 22 x fs’
= 759,88 x 400
= 303952 N

64
𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑎
Mn = Cc x + Cs x defektif – d’
2
341−3,80
=0x + 303952 x 341– 59
2

= 85714464 N.mm
= 85,714 Kn.m
Kesimpulan , Mn ≥ф Mu
85,714 kN.m ≥ 8,26 kN.m … OK!

Ternyatafs = fy dan fs’ < fy


Maka diselesaikan dengan cara iterasi.
Iterasi C a fs=fy Εs εs' fs' Cc Cs Cc+Cs Ts
1 60,000 51,00 400 0,0141 0,00023 46,833333 200602,55 35587,71333 236190,26 303952
2 61,000 51,85 400 0,0138 0,00045 90,298307 204215,05 68615,87745 272830,93 303952
3 61,905 52,62 400 0,0135 0,00063 126,95042 207485,34 96467,08509 303952,42 303952

Jadi didapat : c= 61,905mm


Cs =96467,08509N
Cc = 207485,34N
Mn = Cs (d-d’) + Cc (d - a/2)
= 96467,08509(341-59) +207485,34(341 – 53,99/2)
= 92497332,97 N.mm = 92,497 kN.m

Kontrol :
Mu /Ø < Mn
8,26 kN.m < 92,497 kN.m (OKE!)

65
B. Menghitung Tulangan Transversal / Geser
Langkah-langkah :
1. Mencari nilai Vu :
- Vu primer akibat beban balok (DL) :
Vu = 1,2 (3,72-(1,92.3)) = 2,45 kN
- Vu primer akibat beban balok (LL) :
Vu= 0 kN
- Vu primer akibat beban pelat (DL) :
Vu= 1,2 (4,82-((4,71.3)/2)) = 2,69 kN
- Vu primer akibat beban pelat (LL) :
Vu= 1,6(4,09-((4.3)/2)) = 3,05 kN

Jadi Vu total pada batang primer = 2(2,45 + 0 + 2,69 + 3,05)


= 16,38 kN

2. Menghitung Tulangan Geser Balok Melintang


Gaya Lintang Maksimum (Vu) = 16,38 kN = 16381,69 N
Fc’ = 25 Mpa
Fy = 400 Mpa
b = 200 mm
d = 341 mm
16381,69
Vn= = 20477,1125 𝑁
0,8

- Gaya geser yang harus dipikul beton dan tulangan geser (Vnd)
L = 1,5 m = 1500 mm
1500−341
Vnd = 𝑥 20477,1125 = 15821,98 𝑁
1500

- Gaya geser yang bisa dipikul oleh beton (Vc)


1
Vc = 6 √𝑓𝑐 ′ 𝑏. 𝑑
1
= 6 √25 . 200 . 341 = 56833,333 𝑁

½ Vc = ½ x Vc
= ½ x 56833,333 = 28416,667 N

66
- Panjang Lx1
L = 1,5 m = 1500 mm
𝐿−𝑑 1 1500−341
Lx1 = 𝑉𝑛𝑑 𝑥 2 𝑣𝑐 = 𝑥 28416,667 = 2081,59 𝑚𝑚
15821,98

- Zonasi
V
2/3( fc')^0,5.b.d = 227333.3333 N
IV
1/3( fc')^0,5.b.d = 113666.6667 N
III
1/16( fc')^0,5.b.d = 21312.5 N
II
1/12( fc')^0,5.b.d = 28416.7 N
I

3. Gaya geser yang harus dipikul tulangan geser (Vs)


Vu < Vc (Zonasi 1)
- Spasi tulangan geser (s)
Kesimpulan :Karena Vu masuk zonasi I maka s yang
digunakan s minimum
𝐴𝑣 𝑏𝑤 200
= = = 0,167
𝑆 3𝑓𝑦 3 × 400
dipakaisengkang 8 (Av = 50,24 mm2)
50,24
S = 0,167 = 301,44 mm

S 301,44
S maks =   150,72mm ≈ 150 mm
2 2

67
4. Gaya geser yang harus dipikul tulangan geser (Vs’)
Vs’ = Vc – ½ Vc =56833,333-28416,667= 28416,667(Zonasi II)
- Spasi tulangan geser (s)
Digunakan tulangan baja Ø8 (Av = 50,24 mm2).
3.𝐴𝑣.𝐹𝑦 3.50,24.400
s1 = = = 301,44 mm
𝑑 200

s2 < 1/2 d = 1/2 x 341 = 170,5 mm ≈ 120 mm

Jadi, pada balok melintang akan dipasang tulangan sengkang Ø8 -120


3.𝐴𝑣.𝐹𝑦
mm karena pada perhitungan (s < ½ d) < (s1 = )
𝑏

68
IV. 2.BalokInduk 2-2
Balok Induk 2-2 = Balok Induk 3-3 = Balok Induk 4-4 = Balok Induk
5-5 = Balok Induk 6-6
A. Perhitungan Tulangan Longitudinal
1. Dimensi Pada Balok Melintang
Direncanakan :
Berat volume beton bertulang = 2400 kg/m3 = 24 kN/m3
fc’ = 25 Mpa
fy = 400 Mpa
selimut beton (s) = 40 mm
tulangan sengkang Ø 8 mm.

Dimensipadabalokmemanjang
- b balok = 200 mm = 0,20 m
- h balok= 400 mm = 0,40 m
Beban mati (DL) = 2,35 kN/m2
Beban hidup (LL) = 2 kN/m2

2. Menghitung Beban-Beban yang Bekerja Pada Titik


qbalok = 5,76 kN
qplat DL = 14,13 kN
qplat LL = 12,00 Kn
PA = Pbalok+ Pplat DL+Pplat LL
= 5,76 + 14,13 + 12
= 31,89 kN
PB = Pbalok+ 2 (Pplat DL+Pplat LL)
= 5,76 + 2 (14,13+12)
= 58,01 Kn
PC = Pbalok+ Pplat DL+Pplat LL
= 5,76 + 14,13 + 12
= 31,89 kN

69
3. Menghitung Beban-Beban yang Bekerja Pada Balok

 Digunakan berat sendiri Balok


q1 = ybeton × b balok × h balok
= 24 × 0,2 × 0,4 = 1,92 kN/m
 Momen Primer
1 1
MP q1  . q1. x 2  . (1,92). (3) 2  1,44 kN.m
12 12
 MenghitungKekakuan
1
I = 12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab = Kbc𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = ℎ ×100 = 4 ×100 = 0,010 EI

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = 0,013 𝐸𝐼+0,010 EI+0,013 EI = 0,3

70
Tabel III.1 Distribusi Momen Balok

Tabel Distribusi Momen


Joint D A B C F

Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5

FEM 0 0 1.440 - -1.44 0 1.440 - -1.440 0 0

Balance 0 -0.720 -0.720 - 0 0 0 - 0.720 0.720 0

Co -0.360 0 0 - -0.360 0 0.36 - 0 0 0.4

Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 0 0 - 0 0 0
- 0
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0

Total -0.36 -0.72 0.72 1.62 -1.80 0 1.80 1.62 -0.72 0.72 0.36

71
72
M AB  2,52
H DA    0,63kN ()
H 4
H EB 0
M CF 2,52
H FC    0,63kN()
H 4
4. Menghitung Beban-Beban yang Bekerja Pada Plat

 Digunakan berat sendiri Plat


q2 = WDL × 2 × 2 = 2,35 × 2 × 2 = 9,42 kN/m
 Momen Primer
5 5
MP q2  × q2 × x 2  × 9,42 × 3 2  4,41 kN.m
96 96
 MenghitungKekakuan
1
I = 12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab = Kbc𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = ℎ ×100 = 4 ×100 = 0,010 EI

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = 0,013 𝐸𝐼+0,010 EI+0,013 EI = 0,3

73
Tabel III.2 Distribusi momen plat(DL)

Tabel Distribusi Momen


Joint D A B C F
Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5


FEM 0 0 4.415 - -4.41 0 4.415 - -4.415 0 0
Balance 0 -2.207 -2.207 - 0 0 0 - 2.207 2.207 0
Co -1.104 0 0 - -1.104 0 1.103625 - 0 0 1.1
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0
Co 0 0 0 - 0 0 0 - 0 0 0
Balance 0 0 0 - 0 0 0 - 0 0 0
Total -1.10 -2.21 2.21 3.64 -5.52 0 5.52 3.64 -2.21 2.21 1.10

74
75
M AB  7,73
H DA    1,93kN()
H 4
H EB  0
M CF 7,73
H FC    1,93kN()
H 4

 Digunakan berat hidup Plat


q2 = WLL × 2× 2 = 2 × 2 = 8,00 kN/m

 Momen Primer
5 5
MP q3=  × q3 × x 2  × 8,000 × 3 2  3,75 kN.m
96 96
 MenghitungKekakuan
1
I = 12 x (b beton x 100) x (h beton x 100)3
1
I = 12 x (0,2 x 100) x (0,4 x 100)3 = 106666,67 cm4
4 4
Kab = Kbc =𝑥 ×100 = 3 ×100 = 0,013 EI
4 4
Kda=Kbe=Kcf = ℎ ×100 = 4 ×100 = 0,010 EI

 MenghitungFaktorDistribusi
𝐾𝑎𝑏 0,013 𝐸𝐼
- d=e =f=𝐾𝑎𝑏 = 0,013 𝐸𝐼 = 1
𝐾𝑎𝑏 0,013 𝐸𝐼
- a=c = 𝐾𝑎𝑏+Kab = 0,013 𝐸𝐼+0,013 EI = 0,5
𝐾𝑎𝑏 0,013 𝐸𝐼
- e = 𝐾𝑑𝑎+Kab+Kda = 0,010 𝐸𝐼+0,013 EI+0,010 EI= 0,4
𝐾𝑑𝑎 0,010 𝐸𝐼
- ba=bc =𝐾𝑎𝑏+Kda+Kab = 0,013 𝐸𝐼+0,010 EI+0,013 EI = 0,3

76
Tabel III.3 Distribusi Momen Plat (LL)

Tabel Distribusi Momen


Joint D A B C F

Batang AD DA AB Mlap BA BE BC Mlap CB CF FC

 0.5 0.5 0.3 0.4 0.3 0.5 0.5

FEM 0 0 3.750 - -3.75 0 3.750 - -3.750 0 0

Balance 0 -1.875 -1.875 - 0 0 0 - 1.875 1.875 0

Co -0.938 0 0 - -0.938 0 0.9375 - 0 0 0.9

Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 0 0 - 0 0 0
- 0
Balance 0 0 0 - 0 0 0 - 0 0 0

Co 0 0 0 - 0 0 0 - 0 0 0

Balance 0 0 0 - 0 0 0 - 0 0 0

Total -0.94 -1.88 1.88 3.09 -4.69 0 4.69 3.09 -1.88 1.88 0.94

77
78
M AB  6,57
H DA    1,64kN()
H 4
H EB  0
M CF 6,57
H FC    1,64kN()
H 4

 Kombinasi Momen Balok


Mu1 = 1,4 x balok(DL) = 1,4 x 1,62 = 2,27 kN.m
Mu2 = 1,2 x balok(DL) + 1,6 x balok(LL)
= 1,2 x 1,62 + 1,6 x 0
= 1,94 kN.m
 Kombinasi Momen Plat
Mu1 = 1,4 x plat(DL) = 1,4 x 3,64 = 5,10 kN.m
Mu2 = 1,2 x plat(DL) + 1,6 x plat (LL)
= 1,2 x 3,64 + 1,6 x 3,09
= 9,32 kN.m
 Jumlah Kombinasi Momen Lapangan
ΣMu1 = Mu1(balok)+Mu1(plat)
= 2,27 + 5,10
= 7,37 kN.m

ΣMu2 = Mu2(balok)+Mu2(plat)
= 1,94 + 9,32
= 11,26 kN.m

79
5. Tulangan Tumpuan Balok Melintang

Data :
Momen Ultimate (Mu) = 16,28 Kn.m As = 379,94 mm2
Ø Mu = 20,35 Kn.m banyak batang = 2 batang
Ρ = 0,01 As θ 22 = 759,88mm2
Lebar (b) = 200 mm 2 As’ θ 22 = 759,88 mm2
d (efektif) = 341 mm Fy = 400 Mpa
As perlu = 682 mm2 Fs’ = 400 Mpa
θ tulangan = 22 mm a = 3,80 mm
β1 = 0,85 c = 4,47 mm
s = 40 mm θ sengkang = 8 mm
d’ = 59 mm fc’ = 25 Mpa

d(efektif) = d – s – θ sengkang – ½(θ tulangan)


= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . b .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
d’ = s + θ sengkang + ½(θ tulangan tekan)
= 40 + 8 + ½ ( 22 )
= 59 mm
As = 1/4 . π . D2
= ¼ . 3,14. 222
= 379,94 mm2
𝐴𝑠(𝑝𝑒𝑟𝑙𝑢)
n =
𝐴𝑠
682
=
379,94
= 1,8 = 2 batang
2 As θ 22 = As . n
= 379,94 . 2
= 759,88 mm2

80
2 As’ θ 22 = As . 2
= 379,94 . 2
= 759,88 mm2
(𝐴𝑠−𝐴𝑠 ′ ).𝐹𝑦 𝐴𝑠′
a = +
0,85 .𝐹𝑐 ′ .𝑏 𝑏
(759,88−759,88).400 759,88
= +
0,85 .25.200 200
= 3,80 mm
𝑎
c =
β1
3,80
=
0,85
= 4,47 mm
 Kontrol
(d(efektif)−c) x 0,003
εs = 𝑐
(341−4,47) x 0,003
= 4,47

= 0,2259 ≥ 0,002 .....OK!!


c−d′
εs' =𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑐x εs
4,47−59
=341−4,47x 0,2259

= -0,03660< 0,002.... Tidak OK


Cc = 0,85x fc’x a x b –2 As’ θ 22
= 0,85 x 25 x 3,80 x 200 – 759,88
=0N
Cs = 2 As’ θ 22 x fs’
= 759,88 x 400
= 303952 N
𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑎
Mn = Cc x + Cs x defektif – d’
2
341−3,80
=0x + 303952 x 341– 59
2

= 85714464 N.mm
= 85,714 Kn.m
Kesimpulan , Mn ≥ф Mu
85,714 Kn.m ≥ 20,35 Kn.m … OK!

81
Ternyata, fs = fy dan fs’ < fy
Maka diselesaikan dengan cara iterasi.
Iterasi c A fs=fy εs εs' fs' Cc Cs Cc+Cs Ts
1 55,000 46,75 400 0,0156 -0,00113 -226,90909 182540,05 -172423,68 10116,37 303952
2 60,000 51,00 400 0,0141 0,00023 46,833333 200602,55 35587,713 236190,2633 303952
3 61,905 52,62 400 0,0135 0,00063 126,95042 207485,34 96467,085 303952,423 303952

Jadi didapat : c = 61,905mm


Cs = 96467,085 N
Cc = 207485,34N
Mn = Cs (d-d’) + Cc (d - a/2)
= 96467,085 (341-59) + 207485,34 (341 – 52,62/2)
= 92497333N.mm = 92,497kN.m
Kontrol :
Mu /Ø < Mn
20,35kN.m <92,497 kN.m (OKE!)

82
6. Tulangan Lapangan Balok Melintang (T)

Diketahui :
hf = 100 mm
bw = 200 mm
ρ = 0,01
β1 = 0,85
b = bw + 2.(3.hf)
= 200 + 2.(3. 100)
=800 mm
d(efektif) = d – s – θ sengkang – ½(θ tulangan)
= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . bw .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
0,85 𝐹𝑐′ 600
̅̅̅̅
𝜌𝑏 = .β1.
𝐹𝑦 600+𝐹𝑦
0,85 25 600
= .β1.
400 600+400
= 0,027
ℎ𝑓
ρf = 0,85 Fc’.(b-bw).
𝐹𝑦.𝑏𝑤.𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)
100
= 0,85 25.(1800-200).
400.200.341
= 0,047
𝑏𝑤
0,75 ρb = 0,75 . ̅̅̅̅ + ρf)
.(𝜌𝑏
𝑏
200
= 0,75 . .( 0,027 + 0,047)
1800
= 0,01

Kesimpulan , ρ ≤ 0,75 ρb
0,01 ≤ 0,01 … OK!

83
ρ. min = 1,4 /Fy
= 1,4 / 400
= 0,0035

Kesimpulan , ρ ≥ ρ. min
0,01 ≥ 0,0035 … OK!

𝐹𝑦
 = ρ.
𝐹𝑐′
400
= 0,01.
25
= 0,16
1,18 . ω . d(efektif)
C =
β1
1,18 . 0,16 . 341
=
0,85
= 75,74
Kesimpulan , C ≤ hf
75,74 ≤ 100 .. Balok T Palsu

Karena penampang Balok T Palsu, maka perhitungan sama dengan balok


persegi.

Data :
Momen Ultimate (Mu) = 11,26 Kn.m As = 379,94 mm2
Ø Mu = 14,08 Kn.m banyak batang = 4 batang
Ρ = 0,01 2 As θ 22 = 759,88 mm2
Lebar (b) = 200 mm 2 As’ θ 22 = 759,88 mm2
d (efektif) = 341 mm Fy = 400 Mpa
As perlu = 682 mm2 Fs’ = 400 Mpa
θ tulangan = 22 mm a = 75,32 mm
β1 = 0,85 c = 88,61 mm
s = 40 mm θ sengkang = 8 mm
d’ = 59 mm fc’ = 25 Mpa

d(efektif) = d – s – θ sengkang – ½(θ tulangan)


= 400 – 40 – 8 – ½(22)
= 341 mm
As(perlu) = ρ . b .d(efektif)
= 0,01 . 200 . 341
= 682 mm2
d’ = s + θ sengkang + ½(θ tulangan tekan)
= 40 + 8 + ½ ( 22 )
= 59 mm
As = 1/4 . π . D2
= ¼ . 3,14. 222
= 379,94 mm2
𝐴𝑠(𝑝𝑒𝑟𝑙𝑢)
n =
𝐴𝑠

84
682
=
379,94
= 1,80 = 2 batang
2As θ 22 = As . n
= 379,94 . 2
= 759,88 mm2
2 As’ θ 22 = As . 2
= 379,94 . 2
= 759,88 mm2
(𝐴𝑠−𝐴𝑠 ′ ).𝐹𝑦 𝐴𝑠′
a = +
0,85 .𝐹𝑐 ′ .𝑏 𝑏
(759,88−759,88).400 759,88
= +
0,85 .25.200 200
= 3,80 mm
𝑎
c =
β1
3,80
=
0,85
= 4,47 mm
 Kontrol
(d(efektif)−c) x 0,003
εs = 𝑐
(341−4,47) x 0,003
= 4.47

= 0,2259 ≥ 0,002 .....OK!!

c−d′
εs' =𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑐x εs
4,47−59
=341−4,47x 0,2259

= -0,03660< 0,002.... Tidak OK


Cc = 0,85x fc’x a x b –2 As’ θ 22
= 0,85 x 25 x 3,80 x 200 – 759,88
=0N
Cs = 2 As’ θ 22 x fs’
= 759,88 x 400
= 303952 N

𝑑(𝑒𝑓𝑒𝑘𝑡𝑖𝑓)−𝑎
Mn = Cc x + Cs x defektif – d’
2

85
341−3,80
=0x + 303952 x 341– 59
2

= 85714464 N.mm
= 85,714 kN.m
Kesimpulan , Mn ≥ ф Mu
85,714 kN.m ≥ 14,08 k.m … OK!

Ternyata fs = fy dan fs’ < fy


Maka diselesaikan dengan cara iterasi.
Iterasi c A fs=fy εs εs' fs' Cc Cs Cc+Cs Ts
- -
1 55.000 46.75 400 0.0156 182540.05 -172423.68 10116.37 303952
0.00113 226.90909
2 60.000 51.00 400 0.0141 0.00023 46.833333 200602.55 35587.71333 236190.26 303952
3 61.905 52.62 400 0.0135 0.00063 126.95042 207485.34 96467.08509 303952.42 303952

Jadi didapat : c = 61,905 mm


Cs = 96467,08509 N
Cc = 207485,34 N
Mn = Cs (d-d’) + Cc (d - a/2)
= 96467,08509 (341-59) + 207485,34 (341 – 52,62/2)
= 92497332,97 N.mm = 92,497 kN.m
Kontrol :
Mu /Ø < Mn
14,08 kN.m < 92,497 kN.m (OKE!)

86
B. Menghitung Tulangan Transversal / Geser
Langkah-langkah :
1. Mencari nilai Vu :
- Vu primer akibat beban balok (DL) :
Vu = 1,2 (3,72-(1,92.3)) = 2,45 kN
- Vu primer akibat beban balok (LL) :
Vu= 0 kN
- Vu primer akibat beban pelat (DL) :
Vu=1,2 (9,64-((9,42.3)/2)) = 5,39 kN
- Vu primer akibat beban pelat (LL) :
Vu=1,6(8,19-((8.3)/2)) = 6,10 kN

Jadi Vu total pada batang primer = 2(2,45+ 0 + 5,39+ 6,10)


= 27,87 kN

2. Menghitung Tulangan Geser Balok Memanjang


- Gaya Lintang Maksimum (Vu) = 27,87 kN = 27867,38 N
Fc’ = 25 Mpa
Fy = 400 Mpa
b = 200 mm
d = 341 mm
27867
Vn = = 34834,225 𝑁
0,8

- Gaya geser yang harus dipikul beton dan tulangan geser


(Vnd)
L = 1,5 m = 1500 mm
1500−341
Vnd = 𝑥 34834,225 = 26915,24 𝑁
1500

- Gaya geser yang bisa dipikul oleh beton (Vc)


1
Vc = 6 √𝑓𝑐 ′ 𝑏. 𝑑
1
= 6 √25 . 200 . 341 = 56833,333 𝑁

½ Vc = ½ x Vc
= ½ x 56833,333 = 28416,667 N

87
- Panjang Lx1
L = 1,5 m = 1500 mm
𝐿−𝑑 1 1500−341
Lx1= 𝑉𝑛𝑑 𝑥 2 𝑣𝑐 = 𝑥 56833,33 = 1223,65 𝑚𝑚
26915,24

- Zonasi
V
2/3( fc')^0,5.b.d = 227333.3333 N
IV
1/3( fc')^0,5.b.d = 113666.6667 N
III
1/16( fc')^0,5.b.d = 21312.5 N
II
1/12( fc')^0,5.b.d = 28416.7 N
I

3. Gaya geser yang harus dipikul tulangan geser (Vs)


Vu < Vc (Zonasi 1)
- Spasi tulangan geser (s)
Kesimpulan :Karena Vs masuk zonasi I maka s yang
digunakan s minimum
𝐴𝑣 𝑏𝑤 200
= = = 0,167
𝑆 3𝑓𝑦 3 × 400
dipakaisengkang 8 (Av = 50,24 mm2)
50,24
S = 0,167 = 301,44 mm

S 301,44
S maks =   150,72mm ≈ 120 mm
2 2
4. Gaya geser yang harus dipikul tulangan geser (Vs’)
Vs’ = Vc – ½ Vc =56833,333– 28416,667= 28416,667(Zonasi II)
- Spasi tulangan geser (s)
Digunakan tulangan baja Ø8 (Av = 50,24 mm2).
3.𝐴𝑣.𝑓𝑦 3.50,24.400
s1 = = = 301,44 mm
𝑑 200

s2 < ½ d = ½ x 341 = 170,5 mm ≈ 120 mm

88
Jadi, pada balok melintang akan dipasang tulangan sengkang Ø8 -120 mm
𝐴𝑣.𝑓𝑦.𝑑
karena pada perhitungan (s < ½ d) < (s = ).
𝑉𝑠

89