JEREMIE AVEROUS
Practical
Cost Control
Handbook for
Project Managers
A Practical Guide to Enable Consistent
and Predictable Forecasting
for Large, Complex Projects
We can Customize this
Handbook for your
Organization
We have found that organizations find
great value to have their own internal
handbooks to cover project controls
issues. These full-color, custom-branded handbooks can be
spread to a wide population.
Thanks to our publishing partnership, this generic
handbook has been successfully customized and printed in
many hundreds of copies for some major global project-
driven businesses.
Conducted after a careful review of the organization’s
particularities, and tailored to respond to your needs, such
a customization includes:
Specific systems and processes,
Specifics of the industry and construction context.
Contact us for a customization project.
Get Advanced Training delivered
The best practice concepts of this handbook get best spread
in your organization through training programs. We deliver
trainings globally based on the contents of this handbook,
and customized to your particular needs. We are recognized
as Registered Education Provider by the PMI®.
Contact us for a training project to bring your organization
to the next level in terms of Cost Control.
Contact
Contact @ ProjectValueDelivery.com
In the Same Series
1. The Pocket Guide for those Daring Enough to Take
Responsibility for Large, Complex Projects
by Jean-Pierre Capron
2. Project Soft Power, Learn the Secrets of the Great Project
Leaders
by Jeremie Averous
3. Practical Cost Control Handbook for Project Managers, a
Practical Guide to Enable Consistent and Predictable
Project Forecasting
by Jeremie Averous
4. Practical Project Risk Handbook for Project Managers, a
Guide to Enhance Opportunities and Manage Risks
on Projects
by Jeremie Averous (to be published early 2015)
5. Advanced Scheduling Handbook for Project Managers, a
Practical Navigation Guide on Large, Complex Projects
by Jeremie Averous (to be published 2015)
And more to come…
Discover the latest publications and more on:
www.ProjectValueDelivery.com
Contents
FOREWORD BY BRUNO CHABAS, CEO,
SBM OFFSHORE 1
INTRODUCTION TO PROJECT COST
CONTROL 3
What is the Issue? 3
Keeping the eye on the Cost Control basics 4
A practical handbook 4
The Handbook’s Structure 5
Topics not covered in this handbook 6
Who is this handbook for? 7
CHAPTER 1: WHAT IS COST CONTROL IN
PROJECTS? 9
What is exactly the purpose of project Cost Control? 9
Cost Control in the wider context of Project Controls 10
Essential differences between Accounting and Cost Control 11
What should be the profile of a Cost Controller for a project? 15
The Project Cost Controller training and development 16
Why Finance and Cost Control roles should be neatly
separated in the organization 17
What differentiates Cost Control for Large, Complex projects 20
Conclusion 21
CHAPTER 2: COST CONTROL GOLDEN
RULES 23
CHAPTER 3: COST CONTROL AT PROJECT
START-UP 27
Introduction 27
Transfer of budget information 28
Coordination with the other project functions 35
Systems and processes setup 39
About the organization of Cost Control on large projects 40
Conclusion 41
© Project Value Delivery
viii | Contents
CHAPTER 4: COST CONTROL DURING
PROJECT EXECUTION 43
Precision or Accuracy? 43
Taking into account the interface between stages:
Consequential Variances 44
Project Maturity and the transition to ETC reforecasting focus 45
Cost Control at Engineering Stage 46
Cost Control at Procurement Stage 47
Cost Control at Fabrication Stage 52
Cost Control at Construction Stage 54
Cost Control at Close-out Stage 59
Conclusion 61
CHAPTER 5: FORECASTING 63
Conditions for Forecast quality 63
Reconciliation with Accounting – a useful reality check 66
The Two Forecasting Approaches 69
Type 1 Forecasting: Quantity-based forecasting 70
Type 2 Forecasting: Progress-based forecasting 74
Keeping track of all variances 77
Conclusion 78
CHAPTER 6: PRACTICAL FORECASTING BY
TYPE OF COST AND REVENUE 79
Project Management 79
Engineering 80
Simple and Bulk Procurement 83
Complex Item Procurement 84
Contracts for Services and logistics 85
Fabrication 87
Construction operations 88
Allowances, Contingency and Other costs 90
Forecasting for revenue (contractors) 93
Conclusion 96
© Project Value Delivery
Practical Cost Control Handbook | ix
CHAPTER 7: REFLECTING FORECASTS IN
THE PERIODIC PROJECT REPORT 97
Cost Control information to be included in the Periodic
Project Report 97
The two important inputs into financial forecasting: EAC and
‘Achievable’ 101
Principles of re-forecasting for EAC 103
Principles of Revenue Re-Forecasting 103
Principles of contingency release 106
Reforecasting and project dynamics 108
Conclusion 110
CHAPTER 8: TIME PHASING OF ESTIMATES:
CRITICALITY AND TRAPS 111
Basis of the POC method 111
Instability of financial results due to POC accounting 114
Time-phasing of costs: principles 119
Issues with cost time-phasing 123
Time-phasing of revenue and cash flow generation 124
Conclusion 125
CHAPTER 9: MULTI-CONTRACTING ENTITY
AND MULTI-CURRENCY COST CONTROL 127
Introduction 127
Principles of Multi-Entity Cost Control 128
Detailed application of Multi-Entity Cost Control 129
Principles of Multi-Currency Accounting 131
Currency Exchange Rate Hedging 132
The need for advanced processes and systems 135
Conclusion 136
CHAPTER 10: FORENSIC ANALYSIS OF
PROJECT COST CONTROL 137
It always starts with a surprise 137
The psychological factor: denial, self-deception and other
aspects 139
Failure Modes for the Cost Control Process 141
Level 1 checks – Quality of Commitments and Actuals 142
Level 2 checks – Quality of Forecast 145
Level 3 checks – Quality of decision support 151
Conclusion 152
© Project Value Delivery
x | Contents
CONCLUSION: COST CONTROL, A
STRATEGIC FUNCTION FOR PROJECT
SUCCESS 153
APPENDIX 1 MONTHLY COST CONTROL
CHECKLIST 157
APPENDIX 2 PROJECT STAGES COST
CONTROL CHECKLISTS 161
At Startup Stage 162
At Engineering Stage 164
At Procurement Stage 166
At Fabrication / Worksites Stage 168
At Construction Stage 170
At Close-Out Stage 173
APPENDIX 3: EARNED VALUE
MANAGEMENT 175
ABBREVIATIONS AND GLOSSARY 183
ACKNOWLEDGMENTS 187
TABLE OF FIGURES 188
INDEX 189
© Project Value Delivery
Table of Figures
Figure 1: Principle of Resource Rates and Over/ Under
Recovery ................................................................... 14
Figure 2: Typical Work Breakdown Structure ................. 29
Figure 3: Breakdown Structure Detail Optimal Range .... 30
Figure 4: Precise versus Accurate ................................... 44
Figure 5: Budget, Commitments, Actual and Invoiced
Cost ......................................................................... 67
Figure 6: Reconciliation Process between Cost Control
and Accounting ........................................................ 69
Figure 7: Forecasting Bulk Quantities ............................ 71
Figure 8: Two Legs to a Sound Forecast ......................... 76
Figure 9: Treatment of Unsigned Variation Orders ....... 105
Figure 10: Contingency management throughout the
project lifecycle ....................................................... 107
Figure 11: Evolution of Cost, Contingency and
Revenue during project lifecycle ............................. 109
Figure 12: Evolution of Achievable Cost and Revenue
during project lifecycle ........................................... 109
Figure 13: Typical best practice POC equivalent curves 113
© Project Value Delivery
Index
Cost Control
A Definition, 9
Failure Modes, 141
Achievable Forecast, 25, 101
Forecasting focus, 23, 153
vs EAC. See Forecasting
Process customization, 39
Actual Cost (AC), 75, 153
Profile and Training, 16
Allowances
Surprises, 137
Time Phasing, 121
Team organization on large
projects, 40
B vs Accounting, 11
within Project Controls, 10
Bid Comparisons. See Supply Chain Cost Control interfaces
Breakdown structure, 28 Finance, 38
Changes, 52, 59 Schedule, 24, 37, 54, 56
CTR Cost‐Time‐Resource, 31, 47, Scope, 24
80 Supply Chain, 47
Key Characteristics, 31 Supply Chain – contracting
Level of detail, 29, 47, 80 strategy, 36
Maintenance of Consistency, 38 Cost Control Tools
Type of Main Contract, 32 Multi‐Entity, Multi‐Currency,
Types, 29 135
WBS, 28 Specifications, 20
Breakdown Structure Timesheet system, 46
Multi‐Entity, 131 Cost Engineering. See Cost Control
Budget Cost Management. See Cost
"Padding" syndrome, 65 Control
Tender budget review, 34 Currency Hedging
Budget Owners accountability, 23, Contractual Hedging, 134
27, 47, 64 Natural Hedging, 132
Designation, 33
D
C
Data Integrity
Candidness Principle, 24, 139 Principle, 25
Commitment
Recording process, 37
Tracking, 25, 49, 54, 58, 76
Contingency
Re‐forecasting, 91
Release strategy, 59, 105
Time Phasing, 122
© Project Value Delivery
190 | Index
E Level 2 failures (quality of
forecast), 145
EAC Level 3 failures (lack of decision‐
Prudence Principle, 25, 102 making support), 151
vs 'Achievable'. See Forecasting Surprises, 137
Earned Value techniques, 37, 73,
175
Escalation, 90
I
Immediacy Principle, 24, 103, 110
F
Financial Results
M
Instability. See Percentage of Main Contract
Completion (POC) Revenue structure, 32
Multi‐Currency accounting, 131
Multi‐entity accounting, 127
Forecasting, 63
P
Allowances, 90 Percentage of Completion (POC),
Allowances (Engineering), 82 111
Allowances (Fabrication), 88 Loss Making projects, 114
Allowances (Quantities & Bulk), Threshold, 112
72 Periodic Project Report
Bottom‐Up, 64 Contents, 97
Conditions for Forecast quality, EAC vs Sensitivity table, 98
63 Project Cost Model, 20, 23
Construction, 88 Initialization, 27
Construction spread rate, 55, 89 Time Phasing. See Time‐Phasing
Contingency, 91
EAC vs 'Achievable', 101
Expensive consumables (fuel), R
57 Rates
Fabrication, 87 Over/Under‐Recovery, 14
Principles, 75 Standard Rates vs Actual Costs,
Project Management & 13
Engineering, 61, 79 Reconciliation (cost), 26, 54, 60, 66
Revenue, 93, 103 Rental equipment, 58, 60
Supply Chain, 83, 84 Reporting
Forecasting Approaches Requirements for suppliers, 51,
Productivity/ Earned Value, 73 53
Quantities (Bulk & Equipment), Timing, 40
69 Revenue
Two different approaches, 69 Forecasting. See Forecasting
Forensic Cost Control
Cost Control Failure Modes, 141
Level 1 failures (commitments
and actuals), 142
© Project Value Delivery
Practical Cost Control Handbook | 191
S Importance, 119
Initial Budget, 35
Schedule Project Management and
Consistency with Cost Control, Engineering, 120
24 Revenue, 124
Interface with Cost Control. See Strategy, 123
Earned Value techniques Supply‐Chain, 121
Supply Chain
Bid Comparisons, 36
Interface with Cost Control, 36
V
Suppliers vs Contractors, 48 Variances
Consequential variances, 44
T Tracking, 76
Variation Orders
Time‐Phasing Revenue recognition, 94
Allowances, 121
Construction, 121
Contingency, 122
W
Cost Model update, 111, 119 Worksite Cost Control, 53, 57