Transportation, Loading, Unloading and Storage of Materails.

1. The document outlines safety procedures for transporting, loading, unloading, and storing materials. It identifies potential hazards such as overhead power lines, crane and vehicle failures, and rolling materials. 2. Control measures are provided to mitigate the risks, including using certified cranes and rigging rated for loads, properly positioning vehicles and loads, and securing drums during transportation and storage. 3. The procedures must be followed and all workers trained to complete the tasks safely with no injuries or property damage.

Uploaded by

Brajesh Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
959 views3 pages

Transportation, Loading, Unloading and Storage of Materails.

1. The document outlines safety procedures for transporting, loading, unloading, and storing materials. It identifies potential hazards such as overhead power lines, crane and vehicle failures, and rolling materials. 2. Control measures are provided to mitigate the risks, including using certified cranes and rigging rated for loads, properly positioning vehicles and loads, and securing drums during transportation and storage. 3. The procedures must be followed and all workers trained to complete the tasks safely with no injuries or property damage.

Uploaded by

Brajesh Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

EHSMSM/JUSCO/446/4002 Rev#02 Effective Date: 16.04.

2012
SAFE WORK PROCEDURE
(Performance criteria – perfection in job, no injury to persons or damage to property)
1. DEPARTMENT : PSD DOC. No. : PSD/S&T/03/R3
2. SECTION/LOCATION : Service & Transmission NAME OF WORKING AGENCY :
3. JOB TITLE : Transportation, Loading, Unloading and Storage of Materials. Work Order No. :

4. JOB DURATION : Start Date: __________________ End Date : ______________________

Initial Final Reference to


Sl. Responsible
Job steps Hazards Risk Identified Controls Risk document/Standards /
No. person
Level Level Criteria and Remarks
1. Ensure that place of loading / unloading must not have
Presence of overhead overhead lines.
I T
lines 2. If above is not possible than inform concerned Officer for
shutdown of overhead line.
1. Selection of crane and tools/tackles as per the load.
2. Ensure that F-15 Crane is used for loading / unloading.
3. The rating of the crane, slings, D-shackles should be more
1. Failure of crane than the load (200 % at least).
2. Failure of lifting I 4. Use only certified crane, slings, D-shackles. M
tools 5. Ensure valid License of Crane operator.
6. Position vehicle and crane properly.
7. The slings, D-shackles are to be tested and inspected
Rigging,
periodically.
1. Selection of vehicle as per load.
Loading and Unloading of Mobile Crane
1. 1. Failure of vehicle. 2. Fitness certificate of vehicle, driver with valid driving license.
Materials Operation,
2. Movement of 3. Fix scotch block on tyres of vehicle, ensure handbrake is
vehicle while applied.
I M
loading/unloading. 4. No person should stand over the other adjacent materials
3. Fall of hanging during the loading and unloading.
material on the person 5. During lifting activity, except signal man nobody should
present near the crane.
1. Material must not be dropped from the transporting vehicle.
2.Ensure that crane is not used for pick and carry type of
activity.
4. While lifting, ensure that nobody should stand near / under
Unsafe rigging I M
the suspended materials.
4. Unload the materials at safe place.
5. Make sure when unloading, the materials doesn't strike
another material.

1. Drums not to be kept flat during transportation. Drums


1. Rolling of cable should be kept in the up-right position.
drum while S 2. To prevent the movement of drums, wedges should be used T Transportation
Transportation of cable transportation. and drum should be tied with the vehicle with the help of rope. Safety
2.
drum 3. No person should sit in the Dala.
1. Driving at Maximum speed of 16 KMPH. Road Safety
2. Road accident S 2. Ensure that driver have valid driving license T
3. Check the condition of the truck.

1. Always store the cable drum in upright position.


2. Make sure each drums is provided with stoppers to prevent
3. Storage of cable drums. Rolling of cable drums M T
from rolling during storage.
3. Stacking of cable drum should be avoided.
Any other activity / hazards
Prepared By: Approved By: Checked By:
JUSCO Line Engineer JUSCO Line Manager Safety Officer

I have read and understood the safe working procedure and I commit to follow it while executing the job. I will ensure that all my workmen are trained on this SWP
before starting the job.

Signature of the Contractor

Note
1: This Safe work procedure shall be prepared by owner department countersigned by contractor’s representative and safety department.
2: All possible hazards including proximity hazards shall be identified. Site specific hazards in six directions shall also be identified and fixed.
3. With the change of working condition the procedure shall be amended & persons shall be trained accordingly.
4. Job will not be done unless everybody involved in the job have been trained on this SWP.
5. All applicable PPEs shall be used. Minimum PPE are Helmet, Safety Shoe, Safety Goggles and Reflective jacket.