Bondec
Bondec
PROJECT:
KULONPROGO - ATC TOWER
BUSNAME
BUSADDR1 Sheet 2
BUSADDR2
BUSADDR3 of 27
BUSADDR4
MegaFloor vers 3.4.12
1
2
3 2
3
4
5 4
6
5
7
6
TABLE OF CONTENTS
The software has been developed to limit state design philosophy using British
Standards, Eurocodes when relevant British Standards are not sufficient or outdated
data from tests performed at BlueScope Steel Lysaght research laboratories and
University of Newcastle.
Support Data:
No Support width hb ha col_type rotate col_w col_d col_hb col_ha Fixity sheet_cont col_stiff
1 Insitu_concrete_Beam 300 600 0 None NO 0 0 0 0 0 0 0.00
2 Insitu_concrete_Beam 250 500 0 None NO 0 0 0 0 0 0 0.00
3 Insitu_concrete_Beam 250 500 0 None NO 0 0 0 0 0 0 0.00
4 Insitu_concrete_Beam 250 500 0 None NO 0 0 0 0 0 0 0.00
5 Insitu_concrete_Beam 250 500 0 None NO 0 0 0 0 0 0 0.00
6 Insitu_concrete_Beam 150 300 0 None NO 0 0 0 0 0 0 0.00
7 Insitu_concrete_Beam 300 600 0 None NO 0 0 0 0 0 0 0.00
Reinforcement:
Live Loads
Formwork:
Bondek and Powerdek shall be designed as formwork for two stages of construction.
Stage 1 -prior to the placement of the concrete, which includes the time:
* during handling and erection of the formwork; and
* once the formwork is erected but prior to the placement of the concrete
When a live load due to stacked materials can be adequately controlled on the site at
less than 4 kPa, the reduced design live load shall be clearly indicated on the
formwork documentation. (4 kPa and 1kPa options)
Stage ll -during placement of the concrete up until the concrete has set (until
fcm, concrete strength reaches 15 MPa and concrete is able to act flexurally to
support additional loads such as stacked materials). No loads from stacked materials
are allowed until the concrete has set.
Powerdek 100
Gsh = 0.174tbm (Gsh is in kPa, tbm is in mm)
Powerdek 120
Gsh = 0.184tbm (Gsh is in kPa, tbm is in mm)
Smartdek51
Gsh = 0.103tbm (Gsh is in kPa, tbm is in mm)
Bondek
Gdc = ρ(D + 0.7∆ - 4 - Ash/1000)
Where D = slab thickness, ρ = 24.0 kN/m3 (incl, reinforcement),
∆ = maximum deflections at serviceability loading(maximum allowed deflections
for particular deflection limits)
Powerdek
Gdc = ρ(D + 0.7∆ - Ash/1000)
Smartdek
Gdc = ρ(D + 0.7∆ - 0.5hr - Ash/1000)
Qc = 1.5 kPa
But not less than 4.5/Lp
Where Lp = effective span of profiled sheeting which is the smaller of:
- the distance between centres of permanent or temporary supports, and
- clear span between permanent or temporary supports plus overall depth of profile
sheets
Storage loads and construction loads do not apply to the same area.
No of
Load Combination Pattern Loading
Load Cases
1.4Gsh +1.6Qc(applied on all
F1a = 1
spans)
Note: 1.Load case is a load combination with one particular load pattern arrangement.
2.n = number of spans
3.Load applied on adjacent spans are not equal -One span of continuous
sheeting shall be loaded with weight of wet concrete + Qc load as given above
The other span shall be taken as loaded with the weight of the wet concrete
slab + a construction load of one-third of the basic construction load
Copyright (C) BlueScope Steel Limited 22 December 2004 Project Number
BUSNAME This design is the property Project KULONPROGO - ATC TOWER
of Bluescope Steel Limited and must not be used, reproduced or copied
wholly or in part without the written permission from the company.
Limited release - for use on Contract WR-0119-333A-R00-SD03 only. WR-0119-333A-
YOGYAKARTA
LT.6 GRID D-E; 2-6
The Lysaght range of products is exclusively made by Bluescope Steel
Limited trading as BlueScope Lysaght.
Report Title Authority Approval
BUSNAME
BUSADDR1 Sheet 15
BUSADDR2
BUSADDR3 of 27
BUSADDR4
MegaFloor vers 3.4.12
Composite Slab:
Strength Load Combinations:
Serviceability loads should allow for the effect of propping in every span separately.
Propping shall be ignored for strength load combinations
Load Combinations for Serviceability
(1/rb)long,perm,imp ψpermQk
Fire:
Slab:
Design check/Span 1 2 3 4 5 6
Flexural Crack
100.00 100.00 100.00 100.00 100.00 100.00
Control (%)
Positive BM
25.64 0.00 16.45 0.00 0.00 0.00
Capacity (%)
Negative Shear
26.21 16.96 23.13 18.35 12.25 12.19
Capacity (%)
Postive Shear
16.05 0.00 0.00 8.68 8.67 4.86
Capacity (%)
(C) BlueScope Steel Limited 22 December 2004 Project Number
Deflection
- This design is the property (%) 6.79 Project
1.73 KULONPROGO
3.61 1.12 - ATC TOWER
0.25 2.17
e Steel Limited and must not be used, reproduced or copied
part without the written permission from the company.
ase - for use on Contract WR-0119-333A-R00-SD03 only.
YOGYAKARTA
WR-0119-333A-R00-SD03
BUSADDR1 Sheet
BUSADDR2
BUSADDR3 of
BUSADDR4
MegaFloor vers 3.4.1
0.00 -0.00
0.00 0.00 0.00
0.00 0.00 -0.00
0.00 0.00 -0.00
0.00 0.00 -0.00
0.00 0.00 -0.00
+11.6 +12.0
+7.1 +7.2 +5.8 +5.6
0
-0 0
-0 0
-0 0
-0 0
-0 0
-0 0
-0 0
-0 0
-0 0 0
-0 -0 0
-0
0.00 0.00 0.00 0.00 0.00 -1.17 0.00 -0.96
-1.89 -1.94
-7.1 -7.2 -5.8 -5.6
-9.08 -10.73
-11.6 -12.0
Deflection Envelope (mm)
Slab Envelopes
-0.02
-0.07
-0.00
-0.02
-0.07 -2.54-5.23
-5.23-2.54 -1.24-3.70
-3.70-1.24 -2.65-4.65
-4.65-2.65 -1.26
0.28-1.26
0.28 -0.93-1.66
-1.66-0.93 -0.02-0.07
-0.07-0.02
-0.00
0.00
-0.00 -0.00
2.063.98 -0.20
-2.14 2.85
1.26 0.65 0.03 0.97-0.13 0.93
0.23 0.00
Deflection Envelope(Total)(mm)
Slab Envelopes
-0.017 -9.701-10.601
-2.679-2.679 -10.015
-1.663-9.701
-1.663 -2.535-10.015
-9.705-2.535 -0.264-9.705
-9.624-0.264 -10.205
-0.898-9.477
-0.898 -0.017
0.000 -0.000 0.000 0.000 0.000 -0.000 0.000 -0.000 0.000 -0.000 0.000 -0.000
FORMWORK
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.000
-6.777 -7.037
-4.174 -4.209 -3.423 -3.257
FORMWORK
3.453N/mm 5.607N/mm 3.326N/mm 5.560N/mm 6.838N/mm 7.186N/mm
0.101N/mm 0.101N/mm 0.101N/mm 0.101N/mm 0.101N/mm 0.101N/mm
3.418N/mm 3.313N/mm 3.428N/mm 3.315N/mm 3.283N/mm 3.276N/mm
0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.000 0.000 -0.000 0.000 -0.000
FORMWORK
-0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 -0.00
-1.89 -1.94 -1.17 -0.96
-9.08 -10.73
CASE 500: 1.0Gsh + 1.0Gdc -- [ALL STAGES](MM)
SLAB
4N/mm
2.100N/mm 4N/mm
2.100N/mm 4N/mm
2.100N/mm 4N/mm
2.100N/mm 4N/mm
2.100N/mm 4N/mm
2.100N/mm
4N/mm
2.100N/mm 0.101N/mm
3.359N/mm 0.101N/mm
3.190N/mm 0.101N/mm
3.398N/mm 0.101N/mm
3.191N/mm 0.101N/mm
3.173N/mm 0.101N/mm
3.168N/mm4N/mm
2.100N/mm
-0.069
-0.000 -0.069 -4.897-4.897 -3.048-3.048 -4.636-4.636 -0.503-0.503 -1.639-1.639 -0.069
-0.069 -0.000
-0.00 -0.00
3.82 -1.47 2.59 0.30 0.48 0.73
-5.436 -6.386
-3.917 -3.877
-0.915
0.000 0.915
0.000
4.412
6.669
8.656 8.015 9.639
10.417
SLAB
1.250N/mm
1.500N/mm 1.250N/mm
1.500N/mm 1.250N/mm
1.500N/mm 1.250N/mm
1.500N/mm 1.250N/mm
1.500N/mm 1.250N/mm
1.500N/mm
1.500N/mm 0.072N/mm
2.399N/mm 0.072N/mm
2.278N/mm 0.072N/mm
2.427N/mm 0.072N/mm
2.279N/mm 0.072N/mm
2.266N/mm 0.072N/mm
2.263N/mm
1.500N/mm
SLAB
2.500N/mm
1.500N/mm 2.500N/mm
1.500N/mm 2.500N/mm
1.500N/mm 2.500N/mm
1.500N/mm 2.500N/mm
1.500N/mm 2.500N/mm
1.500N/mm 2.500N/mm
2.500N/mm
1.500N/mm
1.500N/mm
-0.00
0.04
0.04 -0.00
-0.00-0.00 -0.00-0.00 -0.00-0.00 -0.00-0.00 -0.00-0.00 -0.00
-0.00
0.00
0.00
-0.18 0.05 -0.11 0.02 -0.00 -0.01
Shrinkage = M8_08X08(Dia8.0@150) Shrinkage = M8_08X08(Dia8.0@150) Shrinkage = M8_08X08(Dia8.0@150) Shrinkage = M8_08X08(Dia8.0@150) Shrinkage = M8_08X08(Dia8.0@150) Shrinkage = M8_08X08(Dia8.0@150)
(Dia8.0@150 Trans) (Dia8.0@150 Trans) (Dia8.0@150 Trans) (Dia8.0@150 Trans) (Dia8.0@150 Trans) (Dia8.0@150 Trans)
Area = 335mm2 Area = 335mm2 Area = 335mm2 Area = 335mm2 Area = 335mm2 Area = 335mm2
120
REFERENCES