0% found this document useful (0 votes)
67 views42 pages

Gemc-Me-A-Mst-000004 Rev0-1 Electrical Containment - Status B PDF

The document reviews documents for an electrical project. It notes that irrelevant documents should be removed from the method statement and that a containment ITP and checklist need to be provided for review and approval.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views42 pages

Gemc-Me-A-Mst-000004 Rev0-1 Electrical Containment - Status B PDF

The document reviews documents for an electrical project. It notes that irrelevant documents should be removed from the method statement and that a containment ITP and checklist need to be provided for review and approval.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

07-05-2019

GHD Global Pty Ltd.


Electrical: Status: Approved as Noted DOCUMENT / DRAWINGS
REVIEW STAMP

1.Remove irrelevant documents from method statement. A Accepted

2.Containment ITP and check list to be provided for review and approval B Accepted as noted
Not Approved - Revise/
C
Resubmit
CHECKED BY: Baihram Majeed DATE:
07-05-19
Documents receiving an A or B status are considered to
conform with the design intent but does not mean acceptance
of dimensions, sizes or weights, nor does it relieve the
Subcontractor/Consultant from any responsibility for
errors, ommisions and/or compliance with obligations an/or
responsibility of the Contract and/or Consultancy agreement.

Baihram Majeed Site Engineer