Document ID:      <URS001>
Insert logo here
                                                                           Revision No.:     <nn>
  User Requirement Specification                                           Effective Date:   <date>
User Requirement Specification: User Requirement
Specification
Document information, authorship and approvals
Author signs to confirm technical content
Prepared by:                       Job title:                 Signature:                      Date:
Subject matter expert reviewer signs to confirm technical content
Reviewed by:                       Job title:                 Signature:                      Date:
Quality representative signs to confirm document complies with quality management system
Authorised by:                     Job title:                 Signature:                      Date:
  Document is current if front page has “Controlled copy” stamped                                     Page 1 of 10
                                                                   Document ID:    <URS001>
  Insert logo here
                                                                   Revision No.:   <nn>
  User Requirement Specification
Contents
1.     Introduction                                                                                 3
2.     Objective                                                                                    3
3.     Scope                                                                                        3
3.1.   In-Scope                                                                                     3
3.2.   Out-of-Scope                                                                                 3
4.     Criticality & Risk Assessment                                                                4
4.1.   Criticality                                                                                  4
4.2.   Risk                                                                                         4
4.3.   Testing Requirements                                                                         4
5.     Requirements                                                                                 5
5.1.   Compliance Requirements                                                                      5
5.2.   Process & Operational Requirements                                                           5
5.3.   Constraints                                                                                  6
5.4.   Life-Cycle Requirements                                                                      6
6.     Referenced Documents                                                                         9
7.     Definitions                                                                                  9
          Notes
          Fields marked [Company] or [Title], etc. can be updated within the document and should
          change all other references to the field instantly.
          All text provided is either instructional (red text) or example (black text) and should be
          modified/deleted as appropriate.
          Because URS can apply to very small and very large projects, it is difficult to provide
          examples of requirements to cover all eventualities. The example text provided is for a
          small HVAC system. It demonstrates how requirements should be written, but clearly
          cannot cover requirements for all equipment types
 Document is current if front page has “Controlled copy” stamped                          Page 2 of 10
                                                                   Document ID:    <URS001>
 Insert logo here
                                                                   Revision No.:   <nn>
 User Requirement Specification
1.       Introduction
         This should be a very brief introduction how this URS has arisen and what it is for.
         Company Name is procuring a _________ for their Company Address site. As part of this
         procurement, a User Requirements Specification (URS) is required. This URS documents
         the user and regulatory requirements for the User Requirement Specification. The URS
         will be used as the basis of design and qualification for the User Requirement
         Specification.
         Note: in some cases, the URS is not the basis for design, and in some other cases,
         ‘selection’ may be a more appropriate term where there is no design phase involved.
         It is also possible that a URS has been prepared retrospective to order. In these cases,
         the introduction should make this clear and justify the position.
2.       Objective
         The objective of this URS is to define and document the requirements of the User
         Requirement Specification at Company Address, including:
         •   design
         •   construction
         •   qualification
         •   operation
         Appropriate definition and application of these requirements will result in an operational
         facility in compliance with all user requirements as well as applicable regulatory
         requirements.
3.       Scope
         What is in and out of scope may vary from one URS to another. These sections should be
         edited accordingly.
3.1.     In-Scope
         The scope of this URS is limited to the User Requirement Specification at Company
         Address. The plans and schedules provided in attachment 1 clearly identify the limit of
         supply.
         The URS details the following requirement types:
         •   compliance requirements
         •   process and operational requirements
         •   constraints
         •   life cycle requirements
         The URS describes all the requirements deemed relevant to the items above for the User
         Requirement Specification. Testing for each requirement is determined through criticality
         and risk assessment as described in Section 4.
3.2.     Out-of-Scope
         This URS does not include:
 Document is current if front page has “Controlled copy” stamped                          Page 3 of 10
                                                                        Document ID:         <URS001>
 Insert logo here
                                                                        Revision No.:        <nn>
 User Requirement Specification
         • statutory construction requirements, considered the responsibility of the builder and
           their sub-contractors;
         • architectural or engineering functional or detailed design, considered the responsibility
           of the contracted designers;
         • statutory requirements for occupational health, safety and environment, considered
           the responsibility of the contracted designers.
         • The URS is not applicable to general office and other areas not directly required for
           the operation of the GMP facility
4.       Criticality & Risk Assessment
4.1.     Criticality
         The User Requirement Specification has been assessed in accordance with SOP002 -
         Criticality and Risk Assessment as follows:
             Parameter        Assessment             Justification
             Impact                      One of               For example
                              Direct                 Product contact / controls critical parameters
                              Indirect               Monitors critical parameters / required for compliance
                              Safety                 Personnel protection only
                              None                   Not required for GMP or safety compliance
4.2.     Risk
         This URS has been completed in accordance with SOP002 - Criticality and Risk
         Assessment. Each listed requirement has been assessed for risk and assigned a Risk
         Priority (High, Medium or Low). This risk priority should be used to make priorities for
         design and/or testing requirements.
         Each risk priority identifies the risk to product quality and/or other risks as deemed
         relevant if the requirement is not implemented, or implemented incorrectly. The risk
         priority is determined by analysis of:
         • the severity of the risk event
         • the probability of detection before occurrence
         • and the likelihood of its occurrence without intervention.
         This risk assessment has identified:
         16 requirements of High risk priority
         32 requirements of Medium risk priority
         19 requirements of Low risk priority
4.3.     Testing Requirements
         Modify the level of testing required to suit the categorisations obtained.
         Based on the risk and criticality categorisations above and in accordance with SOP002 -
         Criticality and Risk Assessment for Validation and VMPXXX –Validation Master Plan, User
 Document is current if front page has “Controlled copy” stamped                                      Page 4 of 10
                                                                    Document ID:         <URS001>
 Insert logo here
                                                                    Revision No.:        <nn>
 User Requirement Specification
         Requirement Specification requires Commissioning, followed by Design, Installation,
         Operational and Performance Qualification as minimum testing requirements.
         The level of testing conducted for each requirement shall be commensurate with the risk
         priority identified in the requirements table in Section 5.
5.       Requirements
             Ref.      Requirement                                                                     Risk
            5.1.      Compliance Requirements
                      List all compliance requirements which must be met by the completed
                      project. GMP code(s) and guidances, ISO or national standards, OH&S
                      requirements, building codes, corporate policies, etc. may be listed here.
                      Redundancies (for example, building codes already referenced in tender
                      packages or design briefs) should be avoided, however.
             U1.       e.g. The User Requirement Specification shall comply with the                   M
                       requirements of Good Manufacturing Practice (GMP) for medicinal
                       products, as regulated by the Therapeutic Goods Administration (TGA) in
                       Australia (PIC/S Guide to Good Manufacturing Practice, PE009-8).
             U2.       e.g.The User Requirement Specification shall comply with the relevant           M
                       requirements for manufacture of Sterile Medicinal Products, as regulated
                       by the TGA in Australia (PIC/S Guide to Good Manufacturing Practice,
                       PE009-8, Annex 1).
             U3.
            5.2.      Process & Operational Requirements
                      List all process and operational requirements to be met by the completed
                      project. Consider capacities, performance specifications, layout, cleaning
                      requirements, waste handling, environmental requirements, finishes, storage
                      requirements, materials and personnel flows, etc.
             General
                       e.g. The system shall supply a floor space of approximately 400m2,
                       partitioned as described in requirements U14 to U27. The system shall
             U4.                                                                                       H
                       have no less than 2 air handling units (AHU) to supply approximately
                       8m3/s of air to the facility.
                       e.g.Temperature control shall be by cooling and reheat coils in each AHU,
             U5.       supplied by chilled and heating hot water systems dedicated to the HVAC         M
                       system.
             U6.
             U7.
             Finishes & Cleaning
 Document is current if front page has “Controlled copy” stamped                                  Page 5 of 10
                                                                     Document ID:          <URS001>
Insert logo here
                                                                     Revision No.:         <nn>
User Requirement Specification
            U8.       e.g. The insulation inside the air handling units shall be non-shedding.         L
                      e.g. The air handling units shall be provided with adequate access for           L
            U9.
                      cleaning.
           5.3.      Constraints
                     List all constraints that define the boundaries/limitations of the project, and
                     which are not inherent in the previously listed requirements. Consider space
                     constraints, site service availability, project time constraints, site standards
                     and policies, compatibility requirements with existing systems and equipment
                      e.g. Scheduled modification to building structure works requires
            U10.                                                                                       L
                      completion and handover of the system prior to December 31, 2011.
                      e.g. The system shall be available 24 hours per day, 7 days per week.
            U11.      Routine maintenance events requiring system shut-down should be kept             M
                      to a minimum.
           5.4.      Life-Cycle Requirements
                     Define the post-design requirements for accepting the equipment, such as
                     documentation, testing and warranty support.
            Design Review
            During the design phase, and as part of final design approval, design team meetings will be
            conducted. The outcomes of these meetings will be recorded and compiled by Company
            Name as the design review.
                      e.g. The design review shall demonstrate that the design meets all               H
            U12.      relevant user, functional, design, regulatory and compliance
                      requirements.
            Commissioning Requirements
            At the completion of installation, the system shall be commissioned by the installer and/or
            subcontractors to the installer, prior to handover to Company Name. The following are the
            minimum requirements for commissioning.
                      e.g. All personnel performing commissioning testing shall supply evidence        M
            U13.
                      of accreditation by a relevant testing authority (e.g. NATA).
                      e.g. Tester shall supply documented evidence that the requirements of            M
            U14.
                      this URS have been met where appropriate.
            Handover Documentation Requirements
                      e.g. The installer shall supply an operation and maintenance manual              M
            U15.
                      which includes as a minimum:
Document is current if front page has “Controlled copy” stamped                                   Page 6 of 10
                                                                       Document ID:         <URS001>
Insert logo here
                                                                       Revision No.:        <nn>
User Requirement Specification
                          •   Identification of component parts and supplier literature for all
                              components which may require replacement
                          •   Operating instructions for the system, and for individual
                              components where appropriate
                          •   As-built system layout drawings
                          •   As-built system specifications
                          •   Contact details for suppliers and maintenance contractor(s)
                          •   Preventative maintenance task list with recommended frequencies
            QMS Documentation Requirements
                       e.g. Company Name shall ensure that the following SOPs have been                  H
                       created and/or updated for the system:
                          •   operation
            U16.          •   monitoring
                          •   calibration
                          •   maintenance
                          •   cleaning
            Qualification Requirements
            At the completion of commissioning, the system shall be qualified by Company Name and/or
            by consultants to Company Name, The following are the minimum requirements for
            qualification.
                       e.g. The system shall require Installation, Operational and Performance           M
            U17.
                       Qualification in accordance with the assessment performed in Section 4.
            U18.       e.g. Qualifications shall be completed prior to routine use of the system.        M
            Life-cycle Testing
                       e.g. All controlling and monitoring sensors/displays for room pressure,           M
                       temperature and humidity shall be added to the site calibration register
            U19.
                       and calibrated in accordance with the frequency determined for each
                       item.
            Maintenance
                       e.g. The system shall be installed with a warranty period of no less than         L
            U20.
                       12 months on all parts and labour.
                       e.g. The routine preventative maintenance schedule shall be included on           M
            U21.
                       the site maintenance register.
            Training
Document is current if front page has “Controlled copy” stamped                                     Page 7 of 10
                                                                    Document ID:         <URS001>
Insert logo here
                                                                    Revision No.:        <nn>
User Requirement Specification
                      e.g Training shall be provided to all operations and maintenance                M
            U22.      personnel and cover operation, monitoring, cleaning, safety, calibration
                      and maintenance. Training shall be documented and maintained.
            Change Control
                      e.g. Changes made to the system after approval of the URS shall be              M
            U23.
                      subject to change control.
Document is current if front page has “Controlled copy” stamped                                  Page 8 of 10
                                                                   Document ID:    <URS001>
 Insert logo here
                                                                   Revision No.:   <nn>
 User Requirement Specification
6.       Referenced Documents
         The following documents may assist in the understanding of this specification
             Document Number             Document Title
7.       Definitions
             Term/abbreviation             Definition
 Document is current if front page has “Controlled copy” stamped                          Page 9 of 10
                                                                      Document ID:    <URS001>
  Insert logo here
                                                                      Revision No.:   <nn>
  User Requirement Specification
Document Information
Revision History
 Revision            Modified by    Change         Description of Change
                                    Control No.
    01
          Complete the above fields for each revision of this document. Ensure that there is
          sufficient description of changes so that the change history of this document can be
          followed. Additional columns can be added to include document/change tracking numbers
          generated by your company’s systems if required (eg. change control).
Associated forms and procedures
    Doc. No.           Document Title
          List all controlled procedural documents referenced in this document (for example,
          policies, procedures, forms, lists, work/operator instructions
Associated records
    Doc. No.           Document Title
          List all other referenced records in this document. For example, regulatory documents, in-
          house controlled documents (such as batch record forms, reports, methods, protocols),
          compliance standards etc.