This document provides calculations for sizing soak pits for transformers at a power plant. It calculates the dimensions and volumes needed for soak pits for various transformers ranging from 40MVA to 2.5MVA size. For each transformer, it determines the net volume required based on the transformer's oil quantity and the estimated water volume for a 10 minute spill. It then sizes the main soak pit to accommodate the largest transformer's total oil and water volume plus a 10% margin for oil, ensuring the pit volume is greater than the required amount.

Uploaded by

evonik123456
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

Transformer Soak Pit Design PDF

This document provides calculations for sizing soak pits for transformers at a power plant. It calculates the dimensions and volumes needed for soak pits for various transformers ranging from 40MVA to 2.5MVA size. For each transformer, it determines the net volume required based on the transformer's oil quantity and the estimated water volume for a 10 minute spill. It then sizes the main soak pit to accommodate the largest transformer's total oil and water volume plus a 10% margin for oil, ensuring the pit volume is greater than the required amount.

Uploaded by

evonik123456
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ANNEXURE - 1

PLPL, 2x30 MW SOAK PIT SIZING CALCULATIONS 29/11/2010

PLPL-2X30MW - SOAK PIT CALCULATIONS FOR TRANSFORMERS 29.11.10


INPUT DATA
Transformers 40 MVA 12 MVA 10 MVA 2.5 MVA
Tranmsformer Dimensions GT Adora MV UAT LV UAT
Length (a) 5m 4.8 m 5.2 m 2.27 m
Width (b) 5.3 m 4.9 m 4m 2.42 m
Height (C) 5.7 m 4.7 m 4.1 m 2.36 m
Oil Qty 13.6 kL 7.6 kL 7.4 kL 1.6 kL

A TRAFO PIT CALCULATIONS


I Trafo Soak Pit Dimensions
Length 6.40 m 5.30 m 5.80 m 3.30 m
Width 6.80 m 5.50 m 5.00 m 3.00 m
Depth 1.00 m 1.00 m 0.90 m 0.75 m
Total Volume =LXWXD 43.52 m3 29.15 m3 26.10 m3 7.43 m3

II Area occupied by Foundation


Length 4.40 m 3.310 m 3.90 m 4.60 m
Width 2.40 m 2.165 m 1.80 m 0.45 m
Depth 1.00 m 1.00 m 0.90 m 0.75 m
Total Volume occupied =LXWXD 10.56 m3 7.17 m3 6.32 m3 1.55 m3

3 3 3 3
III Net Volume of soak pit = Soak Pit Volume - Foundation Volume (I-II) 32.96 m 21.98 m 19.78 m 5.87 m

3 3 3 3
IV Volume Occupied by Gravel Considered as 70 % of Net Soak Pit Volume 23.07 m 15.39 m 13.85 m 4.11 m

3 3 3 3
V Net Volume availbale for Oil &Water = Net Volume of soak pit - Volume occupied by Gravel 9.89 m 6.60 m 5.93 m 1.76 m

2 2 2 2
VI Surface Area of Transformer = (axb) + 2(bxc) + 2(axc) 143.92 m 114.70 m 96.24 m 27.63 m

VII Qty of Water for 10 min = 10.2 lit / m2 / min 14.68 KL 11.70 KL 9.82 KL 2.82 KL

VIII Total qty of Oil and Water = Transformer oil qty + Water qty 28.28 KL 19.30 KL 17.22 KL 4.42 KL

3 3 3 3
IX Soak Pit size required Considered as 1/3 of Qty of (Oil + Water) 9.43 m 6.43 m 5.74 m 1.47 m

Net Volume available > Oil + Water quantity , thus OK

B MAIN SOAK PIT CALCULATIONS

Largest Oil qty Refer Input Data 13.60 KL 7.40 KL 1.60 KL


+ Water Qty As Calculated above 14.68 KL 9.82 KL 2.82 KL
+10% Oil 1.36 KL 0.74 KL 0.16 KL
Total Qty of Oil + Water 29.64 KL 17.96 KL 4.58 KL

Slope of Pipe is 1: 100 mm


Total Length of Pipe 30000.00 mm 30000.00 mm 30000.00 mm
Slope = Length of pipe / Slope 300.00 mm 300.00 mm 300.00 mm

PIT Dimensions
Length 6.00 m 6.00 m 2.50 m
Width 3.50 m 2.50 m 1.50 m
Depth 1.41 m 1.20 m 1.22 m
Depth of drain pipe 1.50 m 1.40 m 1.25 m
Invert level of oil pit 3.01 m 2.70 m 2.57 m
Depth of of oil pit from FGL 2.71 m 2.40 m 2.27 m
Net Volume avaialble for oil + water = LXWXD 29.64 m3 17.96 m3 4.58 m3

Volume avlb > Oil+ Water qty , thus OK