Estimate of Flooring

The document provides specifications for various construction materials including concrete mixes, reinforcement requirements, brickwork and plaster mixes, flooring and painting options. It also lists current market rates for materials like cement, sand, aggregate, steel and bricks. Tables present minimum reinforcement guidelines for slabs, columns, beams and footings.

Uploaded by

Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
4K views35 pages

Estimate of Flooring

The document provides specifications for various construction materials including concrete mixes, reinforcement requirements, brickwork and plaster mixes, flooring and painting options. It also lists current market rates for materials like cement, sand, aggregate, steel and bricks. Tables present minimum reinforcement guidelines for slabs, columns, beams and footings.

Uploaded by

Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 35

Grade of Concrete Cement Sand Aggregate Ready Mix Concrete (As per

( Bag ) ( cum ) ( cum ) Gujarat SOR , 2015-2016 )

M5 ( 1 : 5 : 10 ) 2.77 0.48 0.96 Grade of Price ( Rs. / cum.)


Concrete
M 7.5 (1:4:8) 3.41 0.47 0.95 M 15 3376 Rs. / cum.
M 10 (1:3:6) 4.44 0.46 0.92 M 20 4332 Rs. / cum.
M 15 (1:2:4) 6.34 0.44 0.88 M 25 4529 Rs. / cum.
M 20 ( 1 : 1.5 : 3 ) 8.06 0.42 0.84 M 30 4679 Rs. / cum.
M 25 (1:1:2) 11.1 0.39 0.77 M 35 4828 Rs. / cum.
M 30 8.13 0.45 0.9 50 Kg / Bag = 0.0348 m3
M 35 8.44 0.45 0.9 so, 1 m3 = 28.80 Bag

SLABS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Max reinforcement 4 % of cross sectional area

COLUMNS
Longitudinal reinforcement
minimum steel 0.8 % of cross sectional area
maximum steel 6 % of cross sectional area ( not lapped )
4 % of cross sectional area ( lapped )
Transverse reinforcement ( Lateral Ties )
minimum spacing of B x D
16 x dia. of Bar
300 mm

BEAMS
Tension reinforcement minimum area of steel As = 0.85 b d / fy
mild steel Fe 250 0.35 % of cross sectional area
HYSD Fe 415 0.2 % of cross sectional area
Max reinforcement 4 % of cross sectional area maximum 0.04 b D

Shear reinforcement ( stirrups ) maximum 0.75 d stirrups


300 mm
minimum area Asv = 0.4 b Sv / 0.87 fy Sv = stirrup spacing

FOOTINGS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Nominal reinforcement , thickness greater than 1 m shall be 360 mm 2 per metre length of concrete section in each direction on

FLOORING
Kota stone 25 mm - 30 mm thick 488 Rs. / Sq. Mt. ( Machine Cut )
500 Rs. / Sq. Mt. ( for step polished )
45-55 mm thick 550 Rs. / Sq. Mt.
Wood Floor 55 Rs. / Sq. Ft.
Granite Floor 130 Rs. / Sq. Ft.
Ceramic tiles ( 30 x 30 cm ) 495 Rs. / Sq. Mt.
Ceramic tiles ( 30 x 30 cm ) (Dado ) 480 Rs. / Sq. Mt.
Vitrified tiles glossy ( 590 -605 mm , 8-10 606 Rs. / Sq. Mt.
mm thick )
Marble 950 Rs. / Sq. Mt.
BRICK WORK 0.23 x 0.1 x 0.07 m size Brick , 12 mm thick motar for 1 m 3.
Cement Mortar Cement Sand
( Bag ) ( cum )
1:2 1.92 0.13
1:3 1.44 0.15
1:4 1.15 0.16
1:5 0.96 0.17
1:6 0.82 0.17

PLASTER WORK 12 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:2 18.43 1.28
1:3 13.82 1.44
1:4 11.06 1.54
1:5 9.22 1.60
1:6 7.90 1.65

PLASTER WORK 8 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:1 18.43 0.64

INTERIOR PAINT 1 litre = 1.223


Cement Primer 205.00 Rs. / Lit. 215 Sq. Ft. / Lit. for 1 Coats 1 litre = 10 -3

Wall Putty 518.00 Rs. / 2 Kg. 20 Sq. Ft. / Kg. for 2 Coats = 0.001
Distemper Paint 74.00 Rs. / Kg. 85 Sq. Ft. / Kg. for 2 Coats 100 micron =
White wash Paint Rs. / 25
400.00 80 Sq. Ft. / Kg. for 1 Coats
( White Cement ) Kg Bag 0.001 =
Plastic Paint 135.00 Rs. / Lit. 60 Sq. Ft. / Lit. for 2 Coats
( emulsion Paint ) 0.001 =
EXTERIOR PAINT Area = 10
Weather Proof 266.00 Rs. / Lit. 40 Sq. Ft. / Lit. for 2 Coats means 1 litre paint = 10 sqm area.= 108
Emulsion
Excellent Finish & 506.00 Rs. / Lit. 50 Sq. Ft. / Lit. for 2 Coats
Long term similarly 1.223 kg paint = 10 sqm area.=
FORM WORK 1 kg paint = 8.2 sqm area. = 88 sq. Ft. a
Ply wood 8 ' x 4 ' thickness 12 mm 42 Rs. / Sqft. 1344 Rs. / No.
Wooden Battens 3 " x 3 " 375 Rs. / Cuft. (calculation based on 1.22times sqft o
Centering Plate 600 x 900 mm ( 2 ' x 3 ' ) Wooden Ballies 50 Rs./ Piece.( calculation base
600 x 1250 mm ( 2 ' x 4 ' ) Shuttering Oil 50 Rs./ Litre. ( calculation base
Nail 52 Rs./ Kg. ( calculation based
RAILING
HEIGHT 3' 6 "
Stainless Steel 850 Rs./Rft.
Aluminium 550 Rs./Rft.
Glass Railing 1950 Rs./Rft.
As per 2018-19
Cement 370 Rs. / Bag
Sand 1500 Rs. / cum ( Natural )
Aggregate 800 Rs. / cum ( 20 mm-25 mm )
Steel 49 Rs. / Kg. ( 10 mm - 25 mm dia. TMT )
Bricks 5.70 Rs. / No. ( II nd Class )
AAC Block 49 Rs. / No. ( 600 x 200 x 100 )

Ready Mix Plaster 200 Rs. / Bag ( 40 Kg per Bag ) 1.58 m2


Ready Mix Mortar 325 Rs. / Bag ( 40 Kg per Bag ) ( 1 : 2 to 1 : 6 ) 0.02 m3
For Brickwork 12 mm Thick
Density of Sand 1920 Kg / m3 For Flooring 40 mm Thick
Density of Steel Bar 7850 Kg / m3
Density of Cement 1440 Kg / m3

LABOUR
MATE / m3 511
LABOUR / m3 464
BHISTI / m3 484
MIXER OPERATOR / m3 511
MIXER / m3 464
VIBRATOR / m3 511
MASON / m3 511
CARPENTER FOR FORMWORK / m2 511
LABOUR FOR FORMWORK / m2 464
BAR BINDER / Kg. 484
0.85 b d / fy LABOUR FOR REINFORCEMENT / 464

te section in each direction on each face.


Kg.
m3
m3
0.1 mm

Area x thick

Area x 0.1/1000
m 2

itre paint = 10 sqm area.= 108 sq. Ft. area

1.223 kg paint = 10 sqm area.= 108 sq. Ft. area


t = 8.2 sqm area. = 88 sq. Ft. area

on based on 1.22times sqft of ply in Rft )


Rs./ Piece.( calculation based on 0.37 times sqft of ply in no. )
Rs./ Litre. ( calculation based on 0.006 times sqft of ply in litre )
Rs./ Kg. ( calculation based on 0.9 times sqft of ply and 10 times of ballies in No. )
17 Sq.Ft. / Bag
17 Sq.Ft. / Bag
0.669291 Cu.Ft. / Bag
2.230971 Cu.Ft. / Bag
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble

You might also like