01 LIFTING OF FLUE CAN
SITE MOBLISATION
failure of hydraulic
jack, break of HT wire
Flue can erection rope,fall of loose fall of
by Hydraulic jacks materials from materials,injured
operated by height,failure of person,slip trip &
2- hydrolic power R welding joint,electric fall, Properties & yes 4 4 16
power materials
pack, EL+0mtr to failure,probability of damage,electrice
275mtr flue can hit on beam shock.
during erection o mtr
To 275 mtr.
cleaning of HT
wire rope & fall from height
inspection of flue working fatal,slip
2.i- can during R workmen,injured trip,materials fall, yes 4 4 16
erection workmen,height
el+269&225mtr phobiya,
(first segment)
collapes of hydra
during hanger beam
shifting,rigger
hanger beam injured,fall of injured
2.ii- shifting by hydra R materials,hydra wire workmen,slip & trip yes 3 4 12
break,sling workmen,
break,compitante
person not operate
hydra,
fall of hanger
beam,properties
damage,men
hanger beam injured,sling fatal or
2.iii- lifting EL+0 To 225 R failure,winch workmen,materials yes 4 4 16
mtr. failure,unauthorised damage,
entry of
workmen,hanger beam
hit on beam
FALL FRON
HEIGT,MATERIALS
FALL,STRAND JACK
hanger beam FAILURE,HT WIRE
fixing on beam to FAILURE,HIT fatel,workers
MATERIALS TO injured,slip &
2.iii- flue can for first R WORKING trip,properties yes 4 4 16
segment MEN,MATERALS damag,
restingEL+225mtr. IMPROPER WAY
FIXING,IMPROPER
SIGNEL,POOR
ILLUMINATION ON JOB
Collapse of hydra
during can
shifting,failure of hydra worker
Shifting of flue wire&sling
6- can R rope/unathorised injured/Machin & yes 4 4 16
entry/unskilled materials damag.
rigger/miss
communication signel.
Placing of rail slip&trip
7- track Tray with R worker slip during injured/material yes
flue can push of flue damag.
can/wheel damaged
& collapse flue can
RADIOGRAPHY & ULTRASONICE TEST
UT generate cathod
ray.Fall from height
work,unauthorised injured person,fall
person operate of loose
8 UT OF flue can R UT,heigh frequency materilas,fall of yes 2 4 8
sound,Electrical men,
equipment shall not be
operated in areas,
RT genrate X-Ray &
Gamma Ray,Fall from
Scaffolding, Radiation
to working Tecnicians
and person passing
nearby area. Fall of X-ray radiation
material. damag to human
cell& skin burn loss
of hair increased
3- RT of flue can R incidence of yes 2 4 8
cancer,Injured
person/slip trip&fall
workers
CONCRETE WORK
failure of
Concrete work of winch,wire,fall from injured person,fall
external platform top of external loose
i- at chimney R platform and falling
materilas,fell yes 4 4 16
materials,weather or
EL+265 to 35mtr. suddenly thunder dawn work men,
storm
reinforcement
lifting & faiure of winch M/C,
unloading fall materials,fall falatity of
externel work men,injured workmen,properti
ii- plateform. R labour,. es loss, yes 4 4 16
IA) LTD. Rev 00
Format No.-
Date: 28-10-2019
RISK ASSESSMENT
CATION:- TANDWA,JHARKAND.
nt-INFRA ZONE
Residual
Risk
Responsible
Control Measures
Persons
खनययंत्रण करनज , रजक लगनज probability
Use proper PPeS,Proper
Housekeeping,Certified rigger &
hydrolice jack oprator Trained by R.S.
NTPC ,TPI of hydrolice VERMA/MUDAN
jacks,Barricding of working 4 4 16 G APAND/Amit
area,Experience person by
supervision,ensurecableare and kr. Gupta
protected with ELCB,DG will be
avaibale for power back up.
Proper plateform & both side
hand railing(top&mid) provide for
safe working,passenger for
workers placing,safety belt with
shock observer &lifeline provide
for workers 4 4 16
movement,compitante OR height
trained persone available on top,
all workmen working on height
vertigo test passed by
NTPC/BHEL.
follow as per OCP
compitante
person operate hydra,certified
rigger for materials shifting,one 3 4 12
flag men for road clearance,TPI
cetified hydra & lifting sling,
follow as per OCP
enty prohabitate inside ch#2
during lifting of hanger beam,use
winch m/c TPI & sling TPI, 4 4 16
workmen available on beam for
safe lifting & infection,
FOLLOW AS PER OCP
trained & compitante
person on job,placing of persone
o mtr To EL+225 mtr passanger &
men cag with winch
m/c,plateforn with hard
barricading,full body harnes with
shock observer,trained signel men
communcation with walkky
tolkky,properillumination provide
on job.
During shifting of can TBT given
by eng&safety,Certified rigger & R.S.
hydra operatore/Rout inspection VERMA/MUDAN
without ,Lifting tools & tackle 4 4 16 G APAND/Amit
with TPI/Proved rail track with
Tray connected to Wheel Bearing kr. Gupta
shifting suficient to position.
daily inspection of trolly wheel & 2 4 8
bearing for movement,proper
ppes use at site,area should be
barricade, unauthorised entry
ban for safe work,
Before strating of UT work TBT
given of workers, Area should be
barricate during UT testing,All R.S.
electrical equipment not operate VERMA/MUDAN
in this area, Hanging jhoola with 2 4 8 G APAND/Amit
hand railing & TPI at height
work,use ear plug of every person kr. Gupta
involve in UT,DG will be avaibale
for power back up.
Before strating of RT work TBT
given of workers, Area should be
barricate during RT testing,All
electrical equipment not operate
in this area, Hanging jhoola with R.S.
hand railing & TPI at height VERMA/MUDAN
work,use ear plug of every person 2 4 8 G APAND/Amit
involve in UT,DG will be avaibale kr. Gupta
for power back up,
various type of shield lead
apron,mobile lead shield,lead
glasses, lead barrier
1- Passenger winch & hoist
operating jhullas should be of
suficient capacity with TPI,winch R.S.
should be properly earthed & VERMA/MUDAN
2 4 8
operate by NTPC approved winch G APAND/Amit
operator id,DG will be avaibale kr. Gupta
for power back up,Daily basis TBT
programe by eng&safety.
during lifting of reinforcement
by winch m/c, proper tie up
with rope,