The document provides a cost analysis breakdown for an Iloilo project consisting of two buildings. It lists the estimated construction costs by trade, with building structural costs accounting for 60-67% of expenses. Electrical costs are estimated at 10-11%, mechanical at 9-10%, fire protection at 2-2.5%, elevators at 2-3%, and plumbing at 2-3%. Additional details are provided on the basis for elevator, electrical, mechanical, fire protection, plumbing, and auxiliary system cost estimates. Reference data is also given from other economic zone projects.

Uploaded by

Bernard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views

Mep Cfa

The document provides a cost analysis breakdown for an Iloilo project consisting of two buildings. It lists the estimated construction costs by trade, with building structural costs accounting for 60-67% of expenses. Electrical costs are estimated at 10-11%, mechanical at 9-10%, fire protection at 2-2.5%, elevators at 2-3%, and plumbing at 2-3%. Additional details are provided on the basis for elevator, electrical, mechanical, fire protection, plumbing, and auxiliary system cost estimates. Reference data is also given from other economic zone projects.

Uploaded by

Bernard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

OCTOBER 29, 2019

COST ANALYSIS FOR ILOILO PROJECT

ENTERPRISE 1 & 2 Construction cost by Trade


BUILDING NAME

BUILDING (Structural, civil and 60%-67%


Architectural Finishes 22,000.00

ELECTRICAL (Power, lights,


10 % - 11%
wirings,panelboards,ATS etc
3,300.00

MECHANICAL (HVAC, pumps,


ductings,smoke evac) 3,000.00 9%-10%

FIRE (Sprinklers,suppression,
extinguishers,hose cabinets,fire
pumps) 650.00 2% - 2.5%

ELEVATOR ( Elevator cars, railing,


motors,fascade etc)
785.00 2% -3%

PLUMBING (Waterline,
sewer/drainages) 900.00 2%-3%
AUXILIARY
(FDAS,CCTV,CATV,BMS,PA,DATA) 1,800.00 5%-6%
Basis $ =50 PHp
1 Elevators
Elevator has 6 units Passenger elevators and 13 stops as reference on plan
1 unit Elevator cost of $ 10,000.00
Php 500,000.00 per floor
Supplier is Siglen China Manufacturer : OTIS Elevator

2 Electrical system
Wires for power supply low volatage, Feederline
Busduct system, panelboards, LVSG & HVSG
Devices, lightings and Controllers INCLUDED
Earthing, grounding and Lightning System
Pipes, cable ladder/trays and other containment
TRANSFORMERS
CBS,TVSS other safety system
UPS, solar devices EXCLUDED
CAPACITORS
HV CABLES/BUSDUCT

3 Mechanical system
Air Conditioning Units
Chillers, pumps, pipings etc
Ventillation and exhaust included pressurization INCLUDED
Smoke evacuations, Fresh air
Fire pump, jockey pump, condenser, transfer pumps
STP pumps and accessories
GENERATORS
Humidifiers, smoke eaters etc
BMS accessories
4 Fire Protection System
Pipings,sprinkler head, valves & accessories
Fire extinguishers
Alarms, controllers, automations

5 Plumbing System
Water supply, accessories tanks
Sewerline and drainage system
STP

6 Auxilliary System
FDAS, CCTV,CATV,PAGBM
DATA, TEL,BMS, Alarm System.
Intercoms
VOIP,Security device system not included
Servers for PC and Data Center not included
Parking Barrier gates and sensors not included
POS not included

REFERENCE
NAME OF ECONOMIC ZONE BUILDING FLOOR AREA PROJECT COST PROJECT CFA MEP CFA
(in sq. m.) (in million)

W North 50,617.0000 1,600.00 31,609.93 12,643.00


SM Megamall I.T. Center 58,159.0000 1,000.00 17,194.24 6,700.00
Ecotower 52,451.6300 1,800.00 34,317.33 13,700.00
Cyberscape Beta 59,373.6000 1,215.00 20,463.64 8,200.00
8 Rockwell 53,618.4400 1,456.00 27,154.84 10,800.00
Ecotower 52,451.6300 1,302.00 24,822.87 10,000.00