FIRE (Sprinklers,suppression,
extinguishers,hose cabinets,fire
pumps) 650.00 2% - 2.5%
PLUMBING (Waterline,
sewer/drainages) 900.00 2%-3%
AUXILIARY
(FDAS,CCTV,CATV,BMS,PA,DATA) 1,800.00 5%-6%
Basis $ =50 PHp
1 Elevators
Elevator has 6 units Passenger elevators and 13 stops as reference on plan
1 unit Elevator cost of $ 10,000.00
Php 500,000.00 per floor
Supplier is Siglen China Manufacturer : OTIS Elevator
2 Electrical system
Wires for power supply low volatage, Feederline
Busduct system, panelboards, LVSG & HVSG
Devices, lightings and Controllers INCLUDED
Earthing, grounding and Lightning System
Pipes, cable ladder/trays and other containment
TRANSFORMERS
CBS,TVSS other safety system
UPS, solar devices EXCLUDED
CAPACITORS
HV CABLES/BUSDUCT
3 Mechanical system
Air Conditioning Units
Chillers, pumps, pipings etc
Ventillation and exhaust included pressurization INCLUDED
Smoke evacuations, Fresh air
Fire pump, jockey pump, condenser, transfer pumps
STP pumps and accessories
GENERATORS
Humidifiers, smoke eaters etc
BMS accessories
4 Fire Protection System
Pipings,sprinkler head, valves & accessories
Fire extinguishers
Alarms, controllers, automations
5 Plumbing System
Water supply, accessories tanks
Sewerline and drainage system
STP
6 Auxilliary System
FDAS, CCTV,CATV,PAGBM
DATA, TEL,BMS, Alarm System.
Intercoms
VOIP,Security device system not included
Servers for PC and Data Center not included
Parking Barrier gates and sensors not included
POS not included
REFERENCE
NAME OF ECONOMIC ZONE BUILDING FLOOR AREA PROJECT COST PROJECT CFA MEP CFA
(in sq. m.) (in million)