Introduction
www.qualityaustriacentralasia.com -2-
What is PPAP ?
Production Part Approval Process
“PPAP defines the requirements for production part approval,
including production and bulk materials”
Standard used to formally reduce risks prior to product or
service release, in a team oriented manner using well
established tools and techniques.
www.qualityaustriacentralasia.com -3-
What is PPAP ?
Provides Proof of Capability
Made up of Documents from APQP
PPAP is a mandatory requirement of
ISO TS 16949:2009
Element 7.3.6.3
so is Supplier PPAP requirements
7.3.6.3
www.qualityaustriacentralasia.com -4-
History
Initially developed by AIAG (Auto Industry Action Group) in 1993
with input from the Big 3 - Ford, Chrysler, and GM.
AIAG’s 4th edition effective June 1, 2006 is the most recent
version.
PPAP has now spread to many different industries beyond
automotive.
www.qualityaustriacentralasia.com -5-
Applicability of PPAP
PPAP applies to all internal and external suppliers of;
– bulk materials
– production materials
– production parts
– service parts
For Bulk material PPAP is not required unless asked by the
customer.
www.qualityaustriacentralasia.com -6-
Purpose of PPAP
A proactive, analytical, systematic technique
To provide evidence that all customer engineering design
record and specification requirements are properly
understood by the organization.
To demonstrate that the manufacturing process has the
potential to produce product that consistently meets all
requirements during an actual production run at the quoted
production rate
PPAP manages change and ensures product
conformance !
www.qualityaustriacentralasia.com -7-
Why PPAP ?
Mechanism to cause more paperwork for supplier ?
– NO
Excuse to beat up supplier?
– NO
Does it provide a baseline for problem solving?
– MAY BE
Provide evidence of a process that insures a good part is
submitted to you customer ?
– YES
Save someone’s life ?
– YES
www.qualityaustriacentralasia.com -8-
When is PPAP Required ?
A full Production Part Approval is always required before
shipment of the first production in the following situations:
– New part or product i.e. something not supplied before
– Engineering changes on a part or product
– Correction of discrepancy on a previously submitted product
– Sub-supplier or material source change
– Change in part processing
– Parts produced at a new or additional location
– Change in the test / inspection method - new technique
PPAP is required with any significant change to product or
process!
www.qualityaustriacentralasia.com -9-
When is PPAP Required ?
Other instances when submission may be required:
– Tooling Inactive > 1 year
– An alternate construction method or material is now used
– When a tool is modified or completely replaced
– Refurbishment or re-arrangement of existing tooling
• Refurbishment -> the reconstruction or modification of a tool
or machine to increase capacity or change its existing
function
• Re-arrangement -> A deviation from the process described
in the process flow diagram
www.qualityaustriacentralasia.com - 10 -
When is PPAP Required ?
For bulk materials only
– New source of raw material with special characteristics from new
or existing subcontractor
– Change in product appearance attributes, where there is no
appearance specification
– Revised parameters in the same process
– Change outside of the DFMEA of the approved product
If there is any question concerning the need for PPAP -
contact the customer and obtain any agreement in writing !
www.qualityaustriacentralasia.com - 11 -
Benefits of PPAP Submission
Helps to maintain design integrity
Identifies issues early for resolution
Reduces warranty charges and prevents cost of poor quality
Assists with managing supplier changes
Prevents use of unapproved and nonconforming parts
Identifies suppliers that need more development
Improves the overall quality of the product & customer satisfaction
www.qualityaustriacentralasia.com - 12 -
Scope of PPAP
Production parts - generally 300 pieces.
Includes internal and external sources for information.
Submission required prior to first production shipment.
www.qualityaustriacentralasia.com - 13 -
PPAP Guidelines
Supplier is responsible for meeting all applicable specifications.
Do not submit parts and documentation results if they are outside
specification.
Take corrective action to meet all design record requirements.
Contact customer if unable to meet all requirements
Comply with customer developed material specifications and/or
approved source list.
Suppliers are required to complete and maintain copies of all
documentation identified in “requirements for approval” regardless of
submission level.
Records of PPAP are to be retained for the life of the part plus one
calendar year.
www.qualityaustriacentralasia.com - 14 -
Requirements for PPAP
1. Design Records of Saleable Product
– for proprietary components / details
– for all other components / details
2. Engineering Change Documents, if any
3. Customer Engineering Approval, if required
4. Design FMEA
5. Process Flow Diagrams
6. Process FMEA
7. Dimensional Results
8. Material / Performance Test Results
9. Initial Process Study
10. Measurement System Analysis Studies
www.qualityaustriacentralasia.com - 15 -
Requirements for PPAP
11. Qualified Laboratory Documentation
12. Control Plan
13. Part Submission Warrant (PSW)
14. Appearance Approval Report (AAR), if applicable
15. Bulk Material Requirements Checklist (for bulk material PPAP only)
16. Sample Product
17. Master Sample
18. Checking Aids
19. Records of Compliance with Customer Specific requirements
www.qualityaustriacentralasia.com - 16 -
Requirements for PPAP
Design Records
Part drawings, specifications, CAD data or any documents
referenced.
If it is electronic format, hard copy to identify measurements taken.
For bulk materials, design records may include:
– Raw material identification
– Formulations
– Processing steps & parameters
– Final product specifications & acceptance criteria
www.qualityaustriacentralasia.com - 17 -
Requirements for PPAP
Any Authorized Engineering Change Document
Authorized change documents provided by customer incorporated in
the part but not yet incorporated in the drawing.
Engineering Approval
As required by design record, for bulk materials,
– signature of customer on bulk material approval check list or
– inclusion of supplier’s name in customer list of approved
materials.
www.qualityaustriacentralasia.com - 18 -
Requirements of PPAP
Design FMEA
If the supplier is design responsible, a Design FMEA must be
developed.
For bulk materials, a design matrix shall be developed prior to
developing the Design FMEA
– Design FMEA ratings for SEV, OCC, DET specified in PPAP
manual can be used
www.qualityaustriacentralasia.com - 19 -
Requirements for PPAP
Process Flow Diagram
A process flow diagram defines the sequence
of operations utilised to manufacture a product
As per APQP manual
– For bulk materials process flow description
satisfies the requirement
www.qualityaustriacentralasia.com - 20 -
Requirements for PPAP
Process FMEA
The process flow diagram should be the basis of commencing a
Process FMEA.
Generic FMEA’s are acceptable if there is evidence of review and
approval that is part specific.
Compliance to QS-9000 III edition requirements Process FMEA for
family of parts
– For bulk materials, Process FMEA rating for SEV, OCC, DET
specified in PPAP manual can be used
www.qualityaustriacentralasia.com - 21 -
Requirements for PPAP
Dimensional Results
Compliance to control plan & Design Record and all characteristics
(except ref. Dimensions)
Dimensional results must reference part drawings and should
include cross sections, tracings and sketches as applicable
The part number, change level, drawing date and supplier’s name
must be shown on all supplementary documents
The supplier shall identify one of the measured parts as a Master
Sample
www.qualityaustriacentralasia.com - 22 -
Requirements for PPAP
Material / Performance Test Results
The organization shall perform tests for all parts and product
materials when chemical, physical, or metallurgical requirements
are specified by the design record or control plan.
Material test results shall indicate and include:
• the design record change level of the parts tested;
• any authorized engineering change documents that have not yet
been incorporated in the design record;
• the number, date, and change level of the specifications to which the
part was tested;
• the date on which the testing took place;
• the quantity tested;
• the actual results;
• the material supplier‘s name and, when required by the customer, the
customer-assigned supplier/vendor code.
www.qualityaustriacentralasia.com - 23 -
Requirements for PPAP
Material / Performance Test Results
– The organization shall perform tests for all part(s) or product
material(s) when performance or functional requirements are
specified by the design record or Control Plan.
– The Performance test report must contain;
• design record change level, date, specification level
• Any authorised engineering change documents not yet incorporated
in the design record
• Date of testing
www.qualityaustriacentralasia.com - 24 -
Requirements for PPAP
Initial Process Studies
Prior to submission, acceptable level of initial process capability or
performance shall be determined with customer.
MSA prior to initial process studies
Cpk or Ppk can be as per customer agreement.
Control charts are preferred, if X bar – R charts used, Min. 25 sub
groups, min 100 nos. from significant production run.
www.qualityaustriacentralasia.com - 25 -
Requirements for PPAP
Initial Process Studies
Acceptance Criteria for Initial Study
Capability Index for stable process
Index > 1.67 1.33 ≤ Index ≤ 1.67 Index < 1.33
• the process currently • the process may be • the process does not
meets the acceptable currently meet the
acceptance criteria • contact the acceptance criteria
• after approval, begin authorized customer • contact the authorized
production and representative for a customer representative
follow control plan review of the study for a review of the study
results results
www.qualityaustriacentralasia.com - 26 -
Requirements for PPAP
Quality Indices
Use Cpk or Ppk
Where historical data is available for similar parts of same process,
Cpk can be captured
– For chronically unstable processes (within specification) use Ppk
– For bulk material, customer agreement on usage of techniques
– Index value > 1.67, Else CA plan is required.
– For Unstable processes, notify customer & submit CA plan
– One sided specification or non normal data (E.g. F/O, R/O,
concentricity, twist, effort, surface finish, uniformity, etc.,)
Alternate method of calculation & acceptance criteria with customer
agreement
– For bulk materials, if Ppk/ Cpk is not achieved 100% inspection of a
sample (s) from a continuous process or homogeneous batch, which
represents online production run.
www.qualityaustriacentralasia.com - 27 -
Requirements for PPAP
Measurement System Analysis Studies
For each measurement device, Measurement System Studies must
be conducted.
Measurement System Studies include;
– Repeatability and Reproducibility Study
– Bias study
– Linearity study
– Stability study
Compliance to TS 16949
www.qualityaustriacentralasia.com - 28 -
Requirements for PPAP
Qualified Laboratory Documentation
If in house laboratory is only used for testing / calibration.
– Add laboratory scope.
If outside laboratory is used for testing / calibration.
– Add NABL certificate or equivalent of that laboratory.
– Add scope of accreditation of that lab
If an independent lab conducts the testing, the supplier shall submit
the tests on the labs letterhead or the standard lab report format.
The name of the lab that completed the tests, date(s) of test(s) and
standards used shall be indicated.
www.qualityaustriacentralasia.com - 29 -
Requirements for PPAP
Control Plan
The control plan must include reference to all special characteristics
that are determined by the customer or supplier.
Approval of the control plan may be required by the customer prior
to submission of PPAP documents
As per APQP manual & TS 16949
www.qualityaustriacentralasia.com - 30 -
Requirements for PPAP
Part Submission Warrant
A document that is used to indicate the reason for submission, the
level of submission and the submission results.
This document is signed off by a designated official within the
company, typically the Quality Manager.
Separate PSW for each part no.
Identify Mould / cavity / line no. in PSW
Part weight shall be rounded off to four decimals derived out of 10
randomly selected part
10 parts represent all moulds, cavities, lines as appropriate.
www.qualityaustriacentralasia.com - 31 -
Requirements for PPAP
Appearance Approval Report
As required in Design Record
A report which identifies the disposition of a product in terms of
Appearance evaluation and colour evaluation
This report must initially be approved by the customer’s
representative, typically the styling department, and then sent in
conjunction with the Part Submission warrant to the customer
Bulk Material Requirement Checklist
Jointly agreed by customer during early stage of APQP
Completion of all agreed activities unless indicated “Not Required”
on the checklist.
www.qualityaustriacentralasia.com - 32 -
Requirements for PPAP
Sample Production Parts
The organization shall provide sample products as specified by the
customer.
Master Sample
A master sample is a part that has been already been verified (refer
dimensional results).
Retain till new master sample is produced or as per design record
requirement for inspection criteria
A master sample is required for each position of a multiple cavity,
die, tool, mould or pattern, line.
Retention period can be waived or modified by customer
www.qualityaustriacentralasia.com - 33 -
Requirements for PPAP
Checking Aids
Inspection Fixtures, gages, models, templates, etc. specific to the
part - something that is used as a comparative reference.
If more than one , prepare & refer the list in PSW including its
change level.
Checking aids must reflect the latest engineering design level of the
product .
Measurement System studies must be conducted on these checking
aids
www.qualityaustriacentralasia.com - 34 -
Requirements for PPAP
Customer Specific Requirements
The organization shall have records of compliance to all applicable
customer-specific requirements.
For bulk materials, applicable customer-specific requirements shall
be documented on the Bulk Material Requirements Checklist.
www.qualityaustriacentralasia.com - 35 -
PPAP Submission Levels
The Submission Level just indicates what has to be submitted to
the customer.
Submission levels are ranked from 1 to 5.
The customer will identify the submission level.
Level 3 is the default level if a customer has not yet defined a
submission level for your company.
For bulk material suppliers the default level is Level 1.
Different customers may assign different submission levels
Levels are agreed and documented in the form of QSR.
www.qualityaustriacentralasia.com - 36 -
PPAP Submission Levels
Production Warrant and Appearance Approval
Level 1
Report (if applicable) submitted to Customer
Production Warrant, product samples, and
Level 2
dimensional results submitted to Customer
Production Warrant, product samples, and
Level 3
complete supporting data submitted to Customer
Production Warrant and other requirements as
Level 4
defined by Customer
Production Warrant, product samples and
complete supporting data (a review will be
Level 5
conducted at the supplier's manufacturing
location)
www.qualityaustriacentralasia.com - 37 -
Submission Levels & Retention
Requirements
Requirement Level 1 Level 2 Level 3 Level 4 Level 5
1 Design records of saleable product R S S * R
:for proprietary components/details R R S * R
: for all other components/details R S R * R
2 Engineering change docs. If any R S S * R
3 Cust Engineering approval, if rqd R R S * R
4 Design FMEA R R S * R
5 Process flow diagram R R S * R
6 Process FMEA R R S * R
7 Dimensional results R S S * R
8 Matl, performance test results R S S * R
9 Initial process study R R S * R
10 Measurement Systems Analysis R R S * R
11 Qualified lab. Documentation R S S * R
12 Control Plan R R S * R
13 Part Submission Warrant (PSW) S S S S R
14 Appearance Approval Report (AAR) S S S * R
15 Bulk Matls. Reqmnts. Checklist R R R * R
16 Sample product R S S * R
17 Master Sample R R R * R
18 Checking aids R R R * R
19 Records of Customer compliance R R S * R
S = Submit to customer & retain copy
R = Retain on site and make readily available to customer
* = Retain on site and submit to customer upon request
www.qualityaustriacentralasia.com - 38 -
Submission Levels & Retention
Requirements
In the preceding table:
S = Supplier shall submit to Customer & retain a copy of records or
documentation items at appropriate locations including
Manufacturing.
R = Supplier shall retain at appropriate locations including
manufacturing and make readily available to Customer upon
request.
* = Supplier shall retain at appropriate locations, and submit to
Customer upon request.
www.qualityaustriacentralasia.com - 39 -
Part Submission Status
After everything is ready, it will be submitted to
the customer!
The customer will inspect everything and notify the
organization of the result using the Part Submission
Status.
www.qualityaustriacentralasia.com - 40 -
Part Submission Status
Suppliers will be notified by the customer as to the disposition of the
submission.
Product is NOT to be shipped unless customer approval is received.
– Verbal approval is unacceptable.
Upon approval of the submission, the organization shall assure that
future production continues to meet all customer requirements.
Production quantities may not be
shipped before Customer Approval
www.qualityaustriacentralasia.com - 41 -
Part Submission Status
Part Submission Status:
“A” “B” “C”
Approved Interim Approval Rejected
www.qualityaustriacentralasia.com - 42 -
Part Submission Status
Full Approval
– This indicates that the part meets all of the customer
requirements. The supplier may then proceed to supply product
as required.
www.qualityaustriacentralasia.com - 43 -
Part Submission Status
Interim Approval
– This indicates that shipment of material may proceed for a
specified period of time or piece quantity.
– Interim approval is granted when a product does not meet all
customer requirements but the supplier has
• Clearly defined the root cause and
• has provided an interim action plan that is approved by the
customer. Re-submission is required
www.qualityaustriacentralasia.com - 44 -
Part Submission Status
Rejected
– This indicates that the product and/or associated documentation
does not meet customer requirements and therefore production
quantities are not permitted to be shipped until all issues are
resolved.
www.qualityaustriacentralasia.com - 45 -
Record Retention
PPAP records shall be retained for the length of time part is
active, including service requirements plus one year
The supplier shall ensure that the appropriate PPAP records
from a superseded part PPAP file are included, or referenced
in the new part PPAP file
www.qualityaustriacentralasia.com - 46 -
Auditing PPAP
1. Is the organization using PPAP rev 4?
2. How does the organization identify which level they are?
3. Is this level consistent with the PPAP they are supplying to their
customer(s) ?
4. Review several PPAPs to ensure all of the applicable 19
requirements are covered.
5. Review lab documentation and ensure the scope of accreditation
of the lab is consistent with the testing/inspection they are doing
for the organization.
6. How does the organization define compliance with customer
requirements ?
www.qualityaustriacentralasia.com - 47 -
Auditing PPAP
7. Verify that the date of the PSW is before the initial delivery date to
the customer for production volumes.
8. Verify the contents of the PSW, ensure correct level, part number,
change level etc.
9. How does the organization deploy PPAP with its suppliers?
10. Take a sample of part numbers, obtain the BOM and verify that all
suppliers have submitted PPAP.
www.qualityaustriacentralasia.com - 48 -
PPAP Process Summary
Before delivering new or changed parts or changing the production
processes, the supplier has to document that he has successfully
finalized all activities of to ensure
– that the product will meet all requirements
– that the processes are under control and capable
The documentation consist of the Part Submission Certificate and
the required attachments.
According to his Submission Level the supplier has to submit
everything or just parts of it to the customer.
The customer checks the documentation and sets the “Part
Submission Status”.
Depending on that the supplier can start delivery or not.
www.qualityaustriacentralasia.com - 49 -
Summary
The Production Part Approval Process is an extensive
strict approval process for new or changed designs or
processes.
It is very formalized, so it inevitably causes some administrative
work.
But it doesn’t demand anything that makes no sense from
an engineer’s point of view!
Later changes to the product or process can be expensive
and time-consuming!
www.qualityaustriacentralasia.com - 50 -
Thank You !!!
www.qualityaustriacentralasia.com - 51 -